Activity Sheets Log (Manual Activity Sheet Gear Menu)
To open the Activity Sheets log:
- Go to the shell tab and switch to User mode.
- In the left Navigator, select Activity Manager, and then select Activity Sheet.
The Activity Sheets log lists the activity sheets. Each activity sheet is listed in a row, and each activity sheet has a gear menu ( ). The following table explains the functions of each option within the gear menu:
Option | Description |
---|---|
Open | To open the Activity Sheet from the log. Alternatively, you can highlight a row, right-click, and use the Open option. |
Import Microsoft MPP | To import the activity sheet by way of MPP. This option lets you bring the file from P6 and import them into an activity sheet to create a schedule. The import will remove the existing data from the activity sheet. |
Import P6 XML | To import the activity sheet by way of P6 XML. This option lets you bring the file from P6 and import them into an activity sheet to create a schedule. The import will remove the existing data from the activity sheet. |
Permissions | To assign Edit, View, and Modify permissions to other users for the selected activity sheets. The functionality supported is same as assigning permissions to Non-Workflow BPs. |
Recost | To perform the cost calculations. |