Activity Sheets Log (Manual Activity Sheet Gear Menu)

To open the Activity Sheets log:

  1. Go to the shell tab and switch to User mode.
  2. In the left Navigator, select Activity Manager, and then select Activity Sheet.

The Activity Sheets log lists the activity sheets. Each activity sheet is listed in a row, and each activity sheet has a gear menu ( ). The following table explains the functions of each option within the gear menu:

Option

Description

Open

To open the Activity Sheet from the log. Alternatively, you can highlight a row, right-click, and use the Open option.

Import Microsoft MPP

To import the activity sheet by way of MPP. This option lets you bring the file from P6 and import them into an activity sheet to create a schedule. The import will remove the existing data from the activity sheet.

Import P6 XML

To import the activity sheet by way of P6 XML. This option lets you bring the file from P6 and import them into an activity sheet to create a schedule. The import will remove the existing data from the activity sheet.

Permissions

To assign Edit, View, and Modify permissions to other users for the selected activity sheets. The functionality supported is same as assigning permissions to Non-Workflow BPs.

Recost

To perform the cost calculations.