Field Map for Primavera Px Reporting

This documents the mapping from the Px Reporting view fields to the fields in the database from whence they are derived.

P6RESOURCEASSIGNMENTSPREADTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ResourceAssignmentObjectIdP6RESOURCEASSIGNMENTSPREADint
StartDateP6RESOURCEASSIGNMENTSPREADdate
EndDateP6RESOURCEASSIGNMENTSPREADdate
resourceobjectidP6RESOURCEASSIGNMENTSPREADint
RoleObjectIdP6RESOURCEASSIGNMENTSPREADint
ActivityObjectIdP6RESOURCEASSIGNMENTSPREADint
WBSObjectIdP6RESOURCEASSIGNMENTSPREADint
projectobjectidP6RESOURCEASSIGNMENTSPREADint
CostAccountObjectIdP6RESOURCEASSIGNMENTSPREADint
ActualRegularUnitsP6RESOURCEASSIGNMENTSPREADnumber
ActualOvertimeUnitsP6RESOURCEASSIGNMENTSPREADnumber
ActualUnitsP6RESOURCEASSIGNMENTSPREADnumber
AtCompletionUnitsP6RESOURCEASSIGNMENTSPREADnumber
PlannedUnitsP6RESOURCEASSIGNMENTSPREADnumber
RemainingUnitsP6RESOURCEASSIGNMENTSPREADnumber
RemainingLateUnitsP6RESOURCEASSIGNMENTSPREADnumber
StaffedRemainingUnitsP6RESOURCEASSIGNMENTSPREADnumber
StaffedRemainingLateUnitsP6RESOURCEASSIGNMENTSPREADnumber
UnstaffedRemainingUnitsP6RESOURCEASSIGNMENTSPREADnumber
UnstaffedRemainingLateUnitsP6RESOURCEASSIGNMENTSPREADnumber
ActualRegularCostP6RESOURCEASSIGNMENTSPREADnumber
ActualOvertimeCostP6RESOURCEASSIGNMENTSPREADnumber
ActualCostP6RESOURCEASSIGNMENTSPREADnumber
AtCompletionCostP6RESOURCEASSIGNMENTSPREADnumber
PlannedCostP6RESOURCEASSIGNMENTSPREADnumber
RemainingCostP6RESOURCEASSIGNMENTSPREADnumber
RemainingLateCostP6RESOURCEASSIGNMENTSPREADnumber
StaffedRemainingCostP6RESOURCEASSIGNMENTSPREADnumber
StaffedRemainingLateCostP6RESOURCEASSIGNMENTSPREADnumber
UnstaffedRemainingCostP6RESOURCEASSIGNMENTSPREADnumber
UnstaffedRemainingLateCostP6RESOURCEASSIGNMENTSPREADnumber
lastupdatedateP6RESOURCEASSIGNMENTSPREADdateLast Update Date
SKeyP6RESOURCEASSIGNMENTSPREADnumber
P6RESOURCELIMITTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
resourceobjectidP6RESOURCELIMITint
startdateP6RESOURCELIMITdate
enddateP6RESOURCELIMITdate
limitP6RESOURCELIMITnumber
lastupdatedateP6RESOURCELIMITdateLast Update Date
P6ACTIVITYSPREADTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ActivityObjectIdP6ACTIVITYSPREADint
StartDateP6ACTIVITYSPREADdate
EndDateP6ACTIVITYSPREADdate
ActivityCodeP6ACTIVITYSPREADstring
ActivityNameP6ACTIVITYSPREADstring
WBSObjectIdP6ACTIVITYSPREADint
projectobjectidP6ACTIVITYSPREADint
ActualLaborUnitsP6ACTIVITYSPREADnumber
ActualNonLaborUnitsP6ACTIVITYSPREADnumber
AtCompletionLaborUnitsP6ACTIVITYSPREADnumber
AtCompletionNonLaborUnitsP6ACTIVITYSPREADnumber
BaselineActualLaborUnitsP6ACTIVITYSPREADnumber
BaselineActualNonLaborUnitsP6ACTIVITYSPREADnumber
BaselinePlannedLaborUnitsP6ACTIVITYSPREADnumber
BaselinePlannedNonLaborUnitsP6ACTIVITYSPREADnumber
Baseline1ActualLaborUnitsP6ACTIVITYSPREADnumber
Baseline1ActualNonLaborUnitsP6ACTIVITYSPREADnumber
Baseline1PlannedLaborUnitsP6ACTIVITYSPREADnumber
Baseline1PlannedNonLaborUnitsP6ACTIVITYSPREADnumber
EarnedValueLaborUnitsP6ACTIVITYSPREADnumber
EstimateAtCompletionLaborUnitsP6ACTIVITYSPREADnumber
EstimateToCompleteLaborUnitsP6ACTIVITYSPREADnumber
PlannedLaborUnitsP6ACTIVITYSPREADnumber
PlannedNonLaborUnitsP6ACTIVITYSPREADnumber
PlannedValueLaborUnitsP6ACTIVITYSPREADnumber
RemainingLaborUnitsP6ACTIVITYSPREADnumber
RemainingLateLaborUnitsP6ACTIVITYSPREADnumber
RemainingLateNonLaborUnitsP6ACTIVITYSPREADnumber
RemainingNonLaborUnitsP6ACTIVITYSPREADnumber
ActualCostP6ACTIVITYSPREADnumber
ActualExpenseCostP6ACTIVITYSPREADnumber
ActualLaborCostP6ACTIVITYSPREADnumber
ActualMaterialCostP6ACTIVITYSPREADnumber
ActualNonLaborCostP6ACTIVITYSPREADnumber
ActualTotalCostP6ACTIVITYSPREADnumber
AtCompletionExpenseCostP6ACTIVITYSPREADnumber
AtCompletionLaborCostP6ACTIVITYSPREADnumber
AtCompletionMaterialCostP6ACTIVITYSPREADnumber
AtCompletionNonLaborCostP6ACTIVITYSPREADnumber
AtCompletionTotalCostP6ACTIVITYSPREADnumber
BaselinePlannedExpenseCostP6ACTIVITYSPREADnumber
BaselinePlannedLaborCostP6ACTIVITYSPREADnumber
BaselinePlannedMaterialCostP6ACTIVITYSPREADnumber
BaselinePlannedNonLaborCostP6ACTIVITYSPREADnumber
BaselinePlannedTotalCostP6ACTIVITYSPREADnumber
BaselineActualExpenseCostP6ACTIVITYSPREADnumber
BaselineActualLaborCostP6ACTIVITYSPREADnumber
BaselineActualMaterialCostP6ACTIVITYSPREADnumber
BaselineActualNonLaborCostP6ACTIVITYSPREADnumber
BaselineActualTotalCostP6ACTIVITYSPREADnumber
Baseline1ActualExpenseCostP6ACTIVITYSPREADnumber
Baseline1ActualLaborCostP6ACTIVITYSPREADnumber
Baseline1ActualMaterialCostP6ACTIVITYSPREADnumber
Baseline1ActualNonLaborCostP6ACTIVITYSPREADnumber
Baseline1ActualTotalCostP6ACTIVITYSPREADnumber
Baseline1PlannedExpenseCostP6ACTIVITYSPREADnumber
Baseline1PlannedLaborCostP6ACTIVITYSPREADnumber
Baseline1PlannedMaterialCostP6ACTIVITYSPREADnumber
Baseline1PlannedNonLaborCostP6ACTIVITYSPREADnumber
Baseline1PlannedTotalCostP6ACTIVITYSPREADnumber
EarnedValueCostP6ACTIVITYSPREADnumber
EstimateAtCompletionCostP6ACTIVITYSPREADnumber
EstimateToCompleteCostP6ACTIVITYSPREADnumber
PlannedExpenseCostP6ACTIVITYSPREADnumber
PlannedLaborCostP6ACTIVITYSPREADnumber
PlannedMaterialCostP6ACTIVITYSPREADnumber
PlannedNonLaborCostP6ACTIVITYSPREADnumber
PlannedTotalCostP6ACTIVITYSPREADnumber
PlannedValueCostP6ACTIVITYSPREADnumber
RemainingExpenseCostP6ACTIVITYSPREADnumber
RemainingLaborCostP6ACTIVITYSPREADnumber
RemainingLateExpenseCostP6ACTIVITYSPREADnumber
RemainingLateLaborCostP6ACTIVITYSPREADnumber
RemainingLateMaterialCostP6ACTIVITYSPREADnumber
RemainingLateNonLaborCostP6ACTIVITYSPREADnumber
RemainingLateTotalCostP6ACTIVITYSPREADnumber
RemainingMaterialCostP6ACTIVITYSPREADnumber
RemainingNonLaborCostP6ACTIVITYSPREADnumber
RemainingTotalCostP6ACTIVITYSPREADnumber
lastupdatedateP6ACTIVITYSPREADdateLast Update Date
SKeyP6ACTIVITYSPREADbigint
P6ACTIVITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Activitytasktask_idintegerThe unique ID generated by the system.
ProjectObjectIdP6Activitytaskproj_idintegerThe unique ID of the associated project.
WBSObjectIdP6Activitytaskwbs_idintegerThe unique ID of the WBS for the activity.
CalendarObjectIdP6Activitytaskclndr_idintegerThe unique ID of the calendar assigned to the activity. Activity calendars can be assigned from the global calendar pool or the project calendar pool.
IsNewFeedbackP6Activitytaskrev_fdbk_flagstringThe flag that indicates that a resource has sent feedback notes about this activity which have not been reviewed yet.
AutoComputeActualsP6Activitytaskauto_compute_act_flagstringThe option that determines whether the activity's actual and remaining units, start date, finish date, and percent complete are computed automatically using the planned dates, planned units and the schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. Use this option to assume that all work for the activity proceeds according to plan.
PercentCompleteTypeP6Activitytaskcomplete_pct_typestringThe activity percent complete type: 'Physical', 'Duration', or 'Units'.
TypeP6Activitytasktask_typestringThe type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone', 'Finish Milestone', or 'WBS Summary'. A 'Task Dependent' activity is scheduled using the activity's calendar rather than the calendars of the assigned resources. A 'Resource Dependent' activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A 'Start Milestone' or 'Finish Milestone' is a zero-duration activity without resources, marking a significant project event. A 'Level of Effort' activity has a duration that is determined by its dependent activities. Administration-type activities are typically 'Level of Effort'. A 'WBS Summary' comprises a group of activities that share a common WBS level. For example, all activities whose WBS codes start with A (A.1, A.1.1, A.1.1.2, A.2, A.3 and so forth) can be part of one WBS activity whose WBS code is A.
DurationTypeP6Activitytaskduration_typestringThe duration type of the activity. One of 'Fixed Units/Time', 'Fixed Duration and Units/Time', 'Fixed Units', or 'Fixed Duration and Units'. For 'Fixed Units/Time' activities, the resource units per time are constant when the activity duration or units are changed. This type is used when an activity has fixed resources with fixed productivity output per time period. For 'Fixed Duration and Units/Time' activities, the activity duration is constant as the units or resource units per time are changed. This type is used when the activity is to be completed within a fixed time period regardless of the resources assigned. For 'Fixed Units' activities, the activity units are constant when the duration or resource units per time are changed. This type is used when the total amount of work is fixed, and increasing the resources can decrease the activity duration.
ReviewStatusP6Activitytaskreview_typestringThe activity review status. Valid values are 'OK', 'For Review', and 'Rejected'. Primary resources set the status to 'For Review' when they believe the activity is completed but are not allowed to mark activities as completed.
StatusP6Activitytaskstatus_codestringThe current status of the activity, either 'Not Started', 'In Progress', or 'Completed'.
IdP6Activitytasktask_codestringThe short ID that uniquely identifies the activity within the project.
NameP6Activitytasktask_namestringThe name of the activity. The activity name does not have to be unique.
PrimaryResourceObjectIdP6Activitytaskrsrc_idintegerThe unique ID of the primary resource for the activity. The primary resource is responsible for the overall work on the activity and updates the activity status using Timesheets.
TotalFloatP6Activitytasktotal_float_hr_cntdoubleThe amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as late start - early start or as late finish - early finish; this option can be set when running the project scheduler.
FreeFloatP6Activitytaskfree_float_hr_cntdoubleThe amount of time the activity can be delayed before delaying the start date of any successor activity.
RemainingDurationP6Activitytaskremain_drtn_hr_cntdoubleThe remaining duration of the activity. Remaining duration is the total working time from the activity remaining start date to the remaining finish date. The remaining working time is computed using the activity's calendar. Before the activity is started, the remaining duration is the same as the planned duration. After the activity is completed the remaining duration is zero.
ActualLaborUnitsP6Activitytaskact_work_qtydoubleThe actual units for all labor resources assigned to the activity.
RemainingLaborUnitsP6Activitytaskremain_work_qtydoubleThe remaining units for all labor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the planned units. After the activity is completed, the remaining units are zero.
PlannedLaborUnitsP6Activitytasktarget_work_qtydoubleThe planned units for all labor resources assigned to the activity. This field is named BudgetedLaborUnits in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedDurationP6Activitytasktarget_drtn_hr_cntdoubleThe total working time from the activity planned start date to the planned finish date. The planned working time is computed using the activity's calendar. This field is named OriginalDuration in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedNonLaborUnitsP6Activitytasktarget_equip_qtydoubleThe planned units for all nonlabor resources assigned to the activity. This field is named BudgetedNonLaborUnits in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
ActualNonLaborUnitsP6Activitytaskact_equip_qtydoubleThe actual units for all nonlabor resources assigned to the activity.
RemainingNonLaborUnitsP6Activitytaskremain_equip_qtydoubleThe remaining units for all nonlabor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the planned units. After the activity is completed, the remaining units are zero.
PrimaryConstraintDateP6Activitytaskcstr_datedateThe constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.
ActualStartDateP6Activitytaskact_start_datedateThe date on which the activity is actually started.
ActualFinishDateP6Activitytaskact_end_datedateThe date on which the activity is actually finished.
LateStartDateP6Activitytasklate_start_datedateThe latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
LateFinishDateP6Activitytasklate_end_datedateThe latest possible date the activity must finish without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
ExpectedFinishDateP6Activitytaskexpect_end_datedateThe date the activity is expected to be finished according to the progress made on the activity's work products. The expected finish date is entered manually by people familiar with progress of the activity's work products.
EarlyStartDateP6Activitytaskearly_start_datedateThe earliest possible date the remaining work for the activity can begin. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
EarlyFinishDateP6Activitytaskearly_end_datedateThe earliest possible date the activity can finish. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.
RemainingEarlyStartDateP6Activitytaskrestart_datedateThe date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date. This is the start date that Timesheets users follow.
RemainingEarlyFinishDateP6Activitytaskreend_datedateThe remaining late end date, which is calculated by the scheduler.
PlannedStartDateP6Activitytasktarget_start_datedateThe date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
PlannedFinishDateP6Activitytasktarget_end_datedateThe date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.
ReviewFinishDateP6Activitytaskreview_end_datedateThe finish date of the activity as proposed by the primary resource using Timesheets, while the activity is in "For Review" state. If the project manager approves the activity completion, the review finish is copied to the actual finish.
RemainingLateStartDateP6Activitytaskrem_late_start_datedatethe remaining late start date calculated by the scheduler.
RemainingLateFinishDateP6Activitytaskrem_late_end_datedatethe remaining late finish date calculated by the scheduler.
PrimaryConstraintTypeP6Activitytaskcstr_typestringThe type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler. Start date constraints are 'Start On', 'Start On or Before', and 'Start On or After'. Finish date constraints are 'Finish On', 'Finish On or Before', and 'Finish On or After'. Another type of constraint, 'As Late As Possible', schedules the activity as late as possible based on the available free float.
LevelingPriorityP6Activitytaskpriority_typestringThe activity priority used to prioritize activities in a project when performing resource leveling. Valid values are 'Top', 'High', 'Normal', 'Low', and 'Lowest'.
SecondaryConstraintDateP6ActivityTASKdateThe date to be used for the cstr_type2 assignment, if the activity has a cstr_type2 value. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.
SecondaryConstraintTypeP6ActivityTASKstringThe additional constraint to be used by the scheduler. If more than one constraint is assigned, this value should be restricted to one of the following: "Start On or Before", "Start On or After", "Finish On or Before", or "Finish On or After".
FloatPathP6Activitytaskfloat_pathintegerThe integer representing the critical path this activity is on. The value 1 is the most critical path, value 2 is the second most critical path, etc.
FloatPathOrderP6Activitytaskfloat_path_orderintegerThe integer representing the order in which this object was found on one of the critical paths.
ActualThisPeriodLaborUnitsP6Activitytaskact_this_per_work_qtydoubleThe actual this period labor units (hours) for all labor resources assigned to the activity.
ActualThisPeriodNonLaborUnitsP6Activitytaskact_this_per_equip_qtydoubleThe actual this period nonlabor units (hours) for all nonlabor resources assigned to the activity.
IsLongestPathP6Activitytaskdriving_path_flagstringThe flag that indicates whether an activity is on the longest path. Default = 'N'
SuspendDateP6Activitytasksuspend_datedateThe start date when the progress of a task or resource dependent activity is delayed from. The suspend date must be later than the actual start date, which the activity must have. The progress of the activity can be resumed by setting the resume date. The Suspend/Resume period behaves like a nonworktime on the activity calendar or resource calendar for task and resource dependent activities.
ResumeDateP6Activitytaskresume_datedateThe date when a suspended task or resource dependent activity should be resumed. The resume date must be later than the suspend date and earlier than the actual finish date. The Suspend/Resume period behaves like a nonworktime on the activity calendar or resource calendar for task and resource dependent activities.
ExternalEarlyStartDateP6Activitytaskexternal_early_start_datedateThe date value that determines the early start date for imported activities with external constraints lost (relations from/to external projects that do not exist in the database). This field is the relationship early finish date (REF) when the lost relationship type is FS or SS. When the relationship type is SF or FF, this field is calculated as REF - RD of the successor.
ExternalLateFinishDateP6Activitytaskexternal_late_end_datedateThe date value that determines the Late Finish Date for imported activities with external constraints lost (from/to external projects that do not exist in the database). This field is the relationship late finish date (RLF) when the lost relationship type is FS or FF. When the relationship type is SS or SF, this field is calculated as RLS + RD of the predecessor.
IsBaselineP6ActivityTASKstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivitystringThe boolean value indicating if this business object is related to a template Project.
AccountingVarianceP6ActivitynumberThe difference between the planned value of work scheduled and the actual cost of work performed. Computed as accounting variance = planned value - actual cost . A negative value indicates that actual costs have exceeded the scheduled costs.
AccountingVarianceLaborUnitsP6ActivitynumberThe difference between the planned value of work scheduled and the actual work performed. Computed as accounting variance labor units = planned value labor units - actual units. A negative value indicates that actual costs have exceeded the scheduled costs.
ActualDurationP6ActivitynumberThe total working time from the activity actual start date to the actual finish date (for completed activities), or to the current data date (for in-progress activities). The actual working time is computed using the activity's calendar.
ActualExpenseCostP6ActivitynumberThe actual costs for all project expenses associated with the activity.
ActualLaborCostP6ActivitynumberThe actual costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity actual labor units * project default price / time.
ActualMaterialCostP6ActivitynumberThe sum of all regular and overtime costs for material resources.
ActualNonLaborCostP6ActivitynumberThe actual costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity actual nonlabor units * project default price / time.
ActualThisPeriodLaborCostP6ActivitynumberThe actual this period labor cost for all labor resources assigned to the activity.
ActualThisPeriodMaterialCostP6ActivitynumberThe sum of all material resource costs for the current period.
ActualThisPeriodNonLaborCostP6ActivitynumberThe actual this period nonlabor cost for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity actual nonlabor units * project default price / time.
ActualTotalCostP6ActivitynumberThe actual total cost for the activity, including labor resources, nonlabor resources, and project expenses. Actual total cost = actual labor costs + actual nonlabor costs + actual expense costs.
ActualTotalUnitsP6ActivityTASKnumberthe sum of Actual Labor Units and Actual Nonlabor Units.
AtCompletionDurationP6ActivitynumberThe total working time from the activity's current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activity's calendar.
AtCompletionExpenseCostP6ActivitynumberThe sum of the actual plus remaining costs for all expenses associated with the activity. Computed as actual expense cost + remaining expense cost.
AtCompletionLaborCostP6ActivitynumberThe sum of the actual plus remaining costs for all labor resources assigned to the activity. Computed as actual labor cost + remaining labor cost. Same as the planned labor costs if the activity is not started and the actual labor costs once the activity is completed.
AtCompletionLaborUnitsP6ActivityTASKnumberThe sum of the actual plus remaining units for all labor resources assigned to the activity. Computed as actual labor units + remaining labor units. Same as the planned labor units if the activity is not started and the actual labor units once the activity is completed.
AtCompletionLaborUnitsVarianceP6ActivitynumberThe project baseline planned total labor units minus the estimate at completion labor units.
AtCompletionMaterialCostP6ActivitynumberThe sum of all actual and remaining costs for material resources.
AtCompletionNonLaborCostP6ActivitynumberThe sum of the actual plus remaining costs for all nonlabor resources assigned to the activity. Computed as actual nonlabor cost + remaining nonlabor cost. Same as the planned nonlabor costs if the activity is not started and the actual nonlabor costs once the activity is completed.
AtCompletionNonLaborUnitsP6ActivityTASKnumberThe sum of the actual plus remaining units for all nonlabor resources assigned to the activity. Computed as actual nonlabor units + remaining nonlabor units. Same as the planned nonlabor units if the activity is not started and the actual nonlabor units once the activity is completed.
AtCompletionTotalCostP6ActivitynumberThe total cost at completion for the activity, including labor resources, nonlabor resources, and project expenses. At completion total cost = at completion labor cost + at completion nonlabor cost + at completion expense cost.
AtCompletionTotalUnitsP6ActivitynumberThe sum of the actual plus remaining units for the resource assignment on the activity.
AtCompletionVarianceP6ActivitynumberThe difference between the project baseline total cost and the current estimate of total cost. Computed as VAC = BAC - EAC. A negative value indicates an estimated cost overrun. BAC is computed from the current project baseline.
BaselineDurationP6ActivitynumberThe duration for the activity in the project baseline. The duration is the total working time from the activity current start date to the current finish date. Same as the actual duration plus the remaining duration. The total working time is computed using the activity's calendar.
BaselineFinishDateP6ActivitydateThe current finish date of the activity in the project baseline. Set to the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed.
BaselinePlannedDurationP6ActivitynumberThe planned duration for the activity in the project baseline. Planned duration is the total working time from the activity current start date to the current finish date. Same as the actual duration plus the remaining duration. The total working time is computed using the activity's calendar. This field is named Baseline Budgeted Duration in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselinePlannedExpenseCostP6ActivitynumberThe planned costs for all project expenses associated with the activity. This field is named Baseline Budgeted Expense Cost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselinePlannedLaborCostP6ActivitynumberThe cost at completion for all labor resources assigned to the activity in the project baseline. Computed from the baseline at completion labor units. If no resources are assigned, computed as the activity BL labor units * project default price / time. This field is named Baseline Budgeted Labor Cost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselinePlannedLaborUnitsP6ActivitynumberThe planned units for all labor resources assigned to the activity. This field is named Baseline Budgeted Labor Units in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselinePlannedMaterialCostP6ActivitynumberThe Planned Material Cost for a project baseline activity.
BaselinePlannedNonLaborCostP6ActivitynumberThe planned costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity planned nonlabor units * project default price / time. This field is named Baseline Budgeted Non Labor Cost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselinePlannedNonLaborUnitsP6ActivitynumberThe planned units for all nonlabor resources assigned to the activity. This field is named Baseline Budgeted Non Labor Units in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselinePlannedTotalCostP6ActivitynumberThe planned total cost for the activity, including labor resources, nonlabor resources, and project expenses. Planned total cost = planned labor cost + planned nonlabor cost + planned expense cost. This field is named Baseline Budgeted Total Cost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
BaselineStartDateP6ActivitydateThe current start date of the activity in the project baseline. Set to the planned start date until the activity is started, then set to the actual start date.
baselinelatestartdateP6ACTIVITYdateActivity - BaselineLateStartDate maps to task.BaselineLateStartDate
baseline1latestartdateP6ACTIVITYdateActivity - Baseline1LateStartDate maps to task.Baseline1LateStartDate
baselinelatefinishdateP6ACTIVITYdateActivity - BaselineLateFinishDate maps to task.BaselineLateFinishDate
baseline1latefinishdateP6ACTIVITYdateActivity - Baseline1LateFinishDate maps to task.Baseline1LateFinishDate
BudgetAtCompletionP6ActivitynumberThe planned total cost through activity completion. Computed as planned labor cost + planned nonlabor cost + planned expense cost, same as the planned total cost.
CalendarNameP6Activitycalendarclndr_namestringThe name of the calendar.
CostPercentCompleteP6ActivitynumberThe percent complete of costs for all labor resources, nonlabor resources, and expenses for the activity. Computed as actual total cost / at completion total cost * 100. Always in the range 0 to 100.
CostPercentOfPlannedP6ActivitynumberThe percent complete of planned costs for all labor resources, nonlabor resources, and expenses for the activity. Computed as actual total cost / BL planned total cost * 100. The value can exceed 100.
CostPerformanceIndexP6ActivitynumberThe earned value divided by the actual cost. A value less than 1 indicates that actual cost have exceeded the planned value.
CostPerformanceIndexLaborUnitsP6ActivitynumberThe ratio of the earned value labor units and the actual work performed. Computed as CPI labor units = earned value labor units / actual labor units .
CostVarianceP6ActivitynumberThe difference between the earned value and the actual cost of work performed. Computed as CV = earned value - actual costs. A negative value indicates that actual costs have exceeded the value of work performed.
CostVarianceIndexP6ActivitynumberThe ratio of the cost variance and the earned value of work performed. Computed as CVI = cost variance / earned value.
CostVarianceIndexLaborUnitsP6ActivitynumberThe ratio of the cost variance labor units and the earned value of work performed. Computed as CVI labor units = CV labor units / earned value labor units
CostVarianceLaborUnitsP6ActivitynumberThe difference between the earned value of labor units and the actual cost of labor units. Calculated as CV labor units = earned value planned units - actual units. A negative value indicates that actual costs have exceeded the value of work performed.
DataDateP6ActivitydateThe current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied.
Duration1VarianceP6ActivitynumberThe duration between the activity's primary baseline duration and the at complete duration. Computed as primary baseline duration - at completion duration.
DurationPercentCompleteP6ActivitynumberThe percent complete of the activity duration. Computed as (planned duration - remaining duration) / planned duration * 100. Always in the range 0 to 100. The planned duration is taken from the current plan, not from the baseline.
DurationPercentOfPlannedP6ActivitynumberThe activity actual duration percent of planned. Computed as actual duration / BL duration * 100. The value can exceed 100. The BL duration is the activity's at completion duration from the project baseline.
DurationVarianceP6ActivitynumberThe duration between the activity's project baseline duration and the at complete duration. Computed as project baseline duration - at completion duration.
EarnedValueCostP6ActivitynumberThe portion of the project baseline total cost of the activity that is actually completed as of the project data date. Computed as earned value = BAC * performance % complete. The method for computing performance % complete depends on the earned-value technique selected for the activity's WBS. BAC is computed from the project baseline.
EarnedValueLaborUnitsP6ActivitynumberThe portion of the project baseline labor units that is actually completed as of the project data date. Computed as labor units earned value = project baseline labor units * performance % complete. The method for computing performance % complete depends on the earned-value technique selected for the activity's WBS. The BL labor units is taken from the project baseline.
EstimateAtCompletionCostP6ActivitynumberThe estimated cost at completion for the activity. Computed as the actual total cost plus the estimate-to-complete cost; EAC = ACWP + ETC. Note that the method for computing ETC depends on the earned-value technique selected for the activity's WBS.
EstimateAtCompletionLaborUnitsP6ActivitynumberThe estimated labor units at completion of the activity. Calculated as actual labor units + estimate to complete labor units. estimate to complete labor units is calculated based off of the earned value setting on the WBS.
EstimateToCompleteP6ActivitynumberThe estimated cost to complete the activity. Computed as either the remaining total cost for the activity (remaining total cost), or as PF * (BAC - earned value), depending on the earned-value technique selected for the activity's WBS. BAC is computed from the project baseline.
EstimateToCompleteLaborUnitsP6ActivitynumberThe estimated quantity to complete the activity. Computed as either the remaining total units for the activity (remaining total units), or as PF * (BL labor units - earned value), depending on the earned-value technique selected for the activity's WBS.
ExpenseCost1VarianceP6ActivitynumberThe difference between primary baseline expense cost and at completion expense cost. Calculated as primary baseline expense cost - at completion expense cost (at completion expense cost = actual expense cost + remaining expense cost).
ExpenseCostPercentCompleteP6ActivitynumberThe percent complete of costs for all expenses associated with the activity. Computed as actual expense cost / at completion expense cost * 100. Always in the range 0 to 100.
ExpenseCostVarianceP6ActivitynumberThe difference between project baseline expense cost and at completion expense cost. Calculated as project baseline expense cost - at completion expense cost (at completion expense cost = actual expense cost + remaining expense cost).
FinishDateP6ActivitydateThe current finish date of the activity. Set to the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed.
FinishDate1VarianceP6Activitynumberthe duration between the finish date in the current project and the primary baseline finish date. Calculated as finish date - primary baseline finish date.
FinishDateVarianceP6Activitynumberthe duration between the finish date in the current project and the project baseline finish date. Calculated as finish date - project baseline finish date.
IsCriticalP6ActivitystringThe flag that indicates whether the activity is critical. An activity is critical when its total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project.
LaborCost1VarianceP6ActivitynumberThe difference between primary baseline labor cost and at completion labor cost. Calculated as BL labor cost - at completion labor cost
LaborCostPercentCompleteP6ActivitynumberThe percent complete of costs for all labor resources assigned to the activity. Computed as actual labor cost / at completion labor cost * 100. Always in the range 0 to 100.
LaborCostVarianceP6ActivitynumberThe difference between project baseline labor cost and at completion labor cost. Calculated as BL labor cost - at completion labor cost
LaborUnits1VarianceP6ActivitynumberThe difference between primary baseline labor units and at completion labor units. Calculated as BL labor units - at completion labor units.
LaborUnitsPercentCompleteP6ActivitynumberThe percent complete of units for all labor resources for the activity. Computed as actual labor units / at completion labor units * 100. Always in the range 0 to 100.
LaborUnitsVarianceP6ActivitynumberThe difference between project baseline labor units and at completion labor units. Calculated as BL labor units - at completion labor units.
MaterialCost1VarianceP6ActivitynumberThe primary Baseline Planned Material Cost minus the At Completion Material Cost.
MaterialCostPercentCompleteP6ActivitynumberThe percent complete of costs for all material resources assigned to the activity. Computed as actual nonlabor cost / at completion nonlabor cost * 100. Always in the range 0 to 100.
MaterialCostVarianceP6ActivitynumberThe project BaselinePlannedMaterialCost minus the AtCompletionMaterialCost.
NonLaborCost1VarianceP6ActivitynumberThe difference between the primary baseline nonlabor cost and at completion nonlabor cost. Calculated as BL nonlabor cost - at completion nonlabor cost.
NonLaborCostPercentCompleteP6ActivitynumberThe percent complete of costs for all nonlabor resources assigned to the activity. Computed as actual nonlabor cost / at completion nonlabor cost * 100. Always in the range 0 to 100.
NonLaborCostVarianceP6ActivitynumberThe difference between the project baseline labor cost and at completion labor cost. Calculated as BL nonlabor cost - at completion nonlabor cost.
NonLaborUnits1VarianceP6ActivitynumberThe difference between the primary baseline nonlabor units and at completion nonlabor units. Calculated as BL nonlabor units - at completion nonlabor units.
NonLaborUnitsPercentCompleteP6ActivitynumberThe percent complete of units for all nonlabor resources for the activity. Computed as actual nonlabor units / at completion nonlabor units * 100. Always in the range 0 to 100.
NonLaborUnitsVarianceP6ActivitynumberThe difference between the project baseline labor units and at completion labor units. Calculated as BL nonlabor units - at completion nonlabor units.
PercentCompleteP6ActivitynumberThe activity percent complete. This value is tied to the activity duration % complete, units % complete, or physical % complete, depending on the setting for the activity's percent complete type, which is one of Duration, Units, or Physical. Always in the range 0 to 100.
PerformancePercentCompleteP6ActivitynumberThe activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the activity % complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The performance % complete specifies what percentage of the activity's planned worth has been earned so far.
PhysicalPercentCompleteP6ActivitynumberThe physical percent complete, which can either be user entered or calculated from the activity's weighted steps.
PlannedExpenseCostP6ActivitynumberThe planned costs for all project expenses associated with the activity. This field is named BudgetedExpenseCost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedLaborCostP6ActivitynumberThe planned costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity planned labor units * project default price / time. This field is named BudgetedLaborCost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedMaterialCostP6ActivitynumberThe sum of all material resource costs.
PlannedNonLaborCostP6ActivitynumberThe planned costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity planned nonlabor units * project default price / time. This field is named BudgetedNonLaborCost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedTotalCostP6ActivitynumberThe planned total cost for the activity, including labor resources, nonlabor resources, and project expenses. Planned total cost = planned labor cost + planned nonlabor cost + planned expense cost. This field is named BudgetedTotalCost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedTotalUnitsP6ActivityTASKnumberthe sum of Planned Labor Units and Planned Nonlabor Units. This field is named BudgetedTotalUnits in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedValueCostP6ActivitynumberThe portion of the project baseline total cost of the activity that is scheduled to be completed as of the project data date. Computed as BAC * schedule % complete. Also known as the work scheduled to be performed for the activity. The schedule % complete specifies how much of the activity's project baseline duration has been completed so far. BAC is computed from the project baseline.
PlannedValueLaborUnitsP6ActivitynumberThe portion of the project baseline labor units that is scheduled to be completed as of the project data date. Computed as BL labor units * schedule % complete. The schedule % complete specifies how much of the activity's project baseline duration has been completed so far. BL labor units is taken from the project baseline.
PrimaryResourceIdP6Activityrsrcrsrc_short_namestringThe name of the resource.
PrimaryResourceNameP6Activityrsrcrsrc_namestringThe name of the resource.
RemainingExpenseCostP6ActivitynumberThe remaining costs for all project expenses associated with the activity.
RemainingFloatP6ActivitynumberThe amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as late finish - remaining finish. If the remaining finish is the same as the early finish (in general, when the activity is not started), then the remaining float is the same as the total float.
RemainingLaborCostP6ActivitynumberThe remaining costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity remaining labor units * project default price / time.
RemainingMaterialCostP6ActivitynumberThe sum of all material resource remaining costs.
RemainingNonLaborCostP6ActivitynumberThe remaining costs for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity remaining nonlabor units * project default price / time.
RemainingTotalCostP6ActivitynumberThe remaining total cost for the activity, including labor resources, nonlabor resources, and project expenses. Remaining total cost = remaining labor costs + remaining nonlabor costs + remaining expense costs.
RemainingTotalUnitsP6ActivityTASKnumberthe sum of Remaining Labor Units and Remaining Nonlabor Units.
SchedulePercentCompleteP6ActivitynumberThe activity schedule percent complete, which specifies how much of the activity's project baseline duration has been completed so far. Computed based on where the current data date falls relative to the activity's project baseline start and finish dates. If the data date is earlier than the BL start, the schedule % complete is 0. If the data date is later than the BL finish, the schedule % complete is 100. The schedule % complete indicates how much of the activity duration should be currently completed, relative to the selected project baseline.
scheduleperfindexlaborunitsP6ACTIVITYnumberActivity - SchedulePerfIndexLaborUnits maps to task.SchedulePerfIndexLaborUnits
SchedulePerformanceIndexP6ActivitynumberThe ratio of the earned value of work performed and the work scheduled to be performed. Computed as SPI = earned value/ planned value. A value less than 1 indicates that less work was actually performed than was scheduled.
ScheduleVarianceP6ActivitynumberThe difference between the earned value of work performed and the work scheduled to be performed. Computed as SV = earned value - planned value. A negative value indicates that less work was actually performed than was scheduled.
ScheduleVarianceIndexP6ActivitynumberThe ratio of the schedule variance and the work scheduled to be performed. Computed as SVI = SV / planned value.
ScheduleVarianceLaborUnitsP6ActivitynumberThe difference between the earned value of work performed and the work scheduled to be performed. Computed as SV labor units = earned value labor units - planned value labor units.
schedulevarindexlaborunitsP6ACTIVITYnumberActivity - ScheduleVarIndexLaborUnits maps to task.ScheduleVarIndexLaborUnits
StartDateP6ActivitydateThe start date of the activity. Set to the remaining start date until the activity is started, then set to the actual start date.
StartDate1VarianceP6ActivitynumberThe duration between the start date in the current project and the primary baseline start date. Calculated as start date - primary baseline start date.
StartDateVarianceP6ActivitynumberThe duration between the start date in the current project and the project baseline start date. Calculated as start date - project baseline start date.
ToCompletePerformanceIndexP6ActivitynumberThe TCPI, which is calculated as (budget at completion - earned value) / (estimate at completion - ACWP).
TotalCost1VarianceP6ActivitynumberThe difference between the primary baseline total cost and the at completion total cost. Calculated as BL total cost - at completion total cost.
TotalCostVarianceP6ActivitynumberThe difference between the project baseline total cost and the at completion total cost. Calculated as BL total cost - at completion total cost.
UnitsPercentCompleteP6ActivitynumberThe percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as actual units / at completion units * 100. Always in the range 0 to 100.
WBSCodeP6Activityprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
WBSNameP6Activityprojwbswbs_namestringThe name of the WBS element.
LocationObjectIdP6Activitytasklocation_idintegerThe unique ID of the location assigned to the activity.
LocationNameP6Activitylocationlocation_namestringThe name of the location assigned to the activity.
ReviewRequiredP6Activitytaskcontrol_updates_flagstringThe indicator that determines whether the activity status updates made in Team Member applications must be approved before commiting changes.
IsStarredP6Activitytaskstarred_flagstringThe flag that indicates whether this activity is marked as starred activity.
CBSCodeP6Activitytaskcbs_codestringThe unique name of CBS Code.
lastupdateuserP6ACTIVITYstringLast Update User
lastupdatedateP6ACTIVITYdateLast Update Date
createuserP6ACTIVITYstringCreate User
createdateP6ACTIVITYdateCreate Date
lastupdatedatexP6ACTIVITYdateTaskX Update Date
SKeyP6ACTIVITYintSKey generated key on Activity
ActivityOwnerObjectIdP6ACTIVITYintegerActivity - OwnerObjectId maps to TASKUSER.user_id
ActivityOwnerP6ACTIVITYstringActivity - Owner maps to USERS.user_name
P6ACTIVITYCODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ActivityCodeactvcodeactv_code_idintegerThe unique ID generated by the system.
CodeTypeObjectIdP6ActivityCodeactvcodeactv_code_type_idintegerThe unique ID of the parent activity code type.
SequenceNumberP6ActivityCodeactvcodeseq_numintegerThe sequence number for sorting.
CodeValueP6ActivityCodeactvcodeshort_namestringThe value of the activity code.
ParentObjectIdP6ActivityCodeactvcodeparent_actv_code_idintegerThe unique ID of the parent activity code of this activity code in the hierarchy.
DescriptionP6ActivityCodeactvcodeactv_code_namestringThe description of the activity code.
CodeTypeNameP6ActivityCodeactvtypeactv_code_typestringThe name of the parent code type for this code.
issecurecodeP6ACTIVITYCODEstringActivityCodeType - IsSecureCode maps to ACTVTYPE.super_flag
ProjectObjectIdP6ActivityCodeactvtypeproj_idintegerThe unique project ID of the parent code type for this code if code type scope is 'Project' or 'EPS', null for code types with scope 'Global'.
CodeTypeScopeP6ActivityCodeactvtypeactv_code_type_scopestringthe scope of the parent activity code type: Global, EPS, or Project. An activity code with Global scope can be assigned to any activity. An activity code with EPS scope can be assigned only to an activity within a project under that particular EPS. Similarly, an activity code with Project scope can be assigned only to an activity within that particular project.
lastupdateuserP6ACTIVITYCODEstringLast Update User
lastupdatedateP6ACTIVITYCODEdateLast Update Date
createuserP6ACTIVITYCODEstringCreate User
createdateP6ACTIVITYCODEdateCreate Date
SKeyP6ACTIVITYCODEintSKey generated key on ActivityCode
P6ACTIVITYCODEASSIGNMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ActivityObjectIdP6ActivityCodeAssignmenttaskactvtask_idintegerThe unique ID of the activity to which the activity code is assigned.
ActivityCodeTypeObjectIdP6ActivityCodeAssignmenttaskactvactv_code_type_idintegerThe unique ID of the parent activity code type.
ActivityCodeObjectIdP6ActivityCodeAssignmenttaskactvactv_code_idintegerThe unique ID of the associated activity code.
ProjectObjectIdP6ActivityCodeAssignmenttaskactvproj_idintegerThe unique ID of the associated project.
IsBaselineP6ActivityCodeAssignmentstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivityCodeAssignmentstringThe boolean value indicating if this business object is related to a template Project.
ActivityCodeDescriptionP6ActivityCodeAssignmentactvcodeactv_code_namestringThe description of the associated activity code.
ActivityCodeTypeNameP6ActivityCodeAssignmentactvtypeactv_code_typestringThe name of the parent activity code type.
ActivityCodeTypeScopeP6ActivityCodeAssignmentactvtypeactv_code_type_scopestringThe scope of the associated activity code type: Global, EPS, or Project. An activity code with Global scope can be assigned to any activity. An activity code with EPS scope can be assigned only to an activity within a project under that particular EPS. Similarly, an activity code with Project scope can be assigned only to an activity within that particular project.
ActivityCodeValueP6ActivityCodeAssignmentactvcodeshort_namestringThe value of the associated activity code.
ActivityIdP6ActivityCodeAssignmenttasktask_codestringThe short ID that uniquely identifies the activity to which the activity code is assigned.
ActivityNameP6ActivityCodeAssignmenttasktask_namestringThe name of the activity to which the activity code is assigned.
issecurecodeP6ACTIVITYCODEASSIGNMENTstringActivityCodeAssignment - IsSecureCode maps to TASKACTV.super_flag
lastupdateuserP6ACTIVITYCODEASSIGNMENTstringLast Update User
lastupdatedateP6ACTIVITYCODEASSIGNMENTdateLast Update Date
createuserP6ACTIVITYCODEASSIGNMENTstringCreate User
createdateP6ACTIVITYCODEASSIGNMENTdateCreate Date
SKeyP6ACTIVITYCODEASSIGNMENTintSKey generated key on ActivityCodeAssignment
P6ACTIVITYCODEHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
CodeTypeObjectIdP6ACTIVITYCODEHIERARCHYinteger
CodeTypeNameP6ACTIVITYCODEHIERARCHYstring
CodeTypeSequenceNumberP6ACTIVITYCODEHIERARCHYinteger
CodeTypeIsSecureP6ACTIVITYCODEHIERARCHYstring
ParentCodeValueObjectIdP6ACTIVITYCODEHIERARCHYinteger
ParentCodeValueNameP6ACTIVITYCODEHIERARCHYstring
ParentCodeValueShortNameP6ACTIVITYCODEHIERARCHYstring
ParentCodeValueSequenceNumberP6ACTIVITYCODEHIERARCHYinteger
ChildCodeValueObjectIdP6ACTIVITYCODEHIERARCHYinteger
ChildCodeValueNameP6ACTIVITYCODEHIERARCHYstring
ChildCodeValueShortNameP6ACTIVITYCODEHIERARCHYstring
ChildCodeValueSequenceNumberP6ACTIVITYCODEHIERARCHYinteger
ParentLevelsBelowRootP6ACTIVITYCODEHIERARCHYinteger
ChildLevelsBelowRootP6ACTIVITYCODEHIERARCHYinteger
LevelsBetweenP6ACTIVITYCODEHIERARCHYinteger
ChildHasChildrenP6ACTIVITYCODEHIERARCHYstring
FullPathNameP6ACTIVITYCODEHIERARCHYstring
CodeTypeScopeP6ACTIVITYCODEHIERARCHYstring
CodeTypeProjectIdP6ACTIVITYCODEHIERARCHYinteger
SKeyP6ACTIVITYCODEHIERARCHYint
P6ACTIVITYCODETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ActivityCodeTypeactvtypeactv_code_type_idintegerThe unique ID generated by the system.
LengthP6ActivityCodeTypeactvtypeactv_short_lenintegerThe maximum number of characters allowed for values of this activity code.
SequenceNumberP6ActivityCodeTypeactvtypeseq_numintegerThe sequence number for sorting.
NameP6ActivityCodeTypeactvtypeactv_code_typestringThe name of the activity code type.
ScopeP6ActivityCodeTypeactvtypeactv_code_type_scopestringthe scope of the code type: Global, EPS, or Project. An activity code with Global scope can be assigned to any activity. An activity code with EPS scope can be assigned only to an activity within a project under that particular EPS. Similarly, an activity code with Project scope can be assigned only to an activity within that particular project.
ProjectObjectIdP6ActivityCodeTypeactvtypeproj_idintegerThe unique ID of the associated project.
EPSObjectIdP6ActivityCodeTypeactvtypeproj_idintegerThe unique ID of the associated EPS.
IsSecureCodeP6ActivityCodeTypeactvtypesuper_flagstringthe flag indicating whether this is a secure Activity Code Type.
IsBaselineP6ActivityCodeTypestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivityCodeTypestringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6ACTIVITYCODETYPEstringLast Update User
lastupdatedateP6ACTIVITYCODETYPEdateLast Update Date
createuserP6ACTIVITYCODETYPEstringCreate User
createdateP6ACTIVITYCODETYPEdateCreate Date
SKeyP6ACTIVITYCODETYPEintSKey generated key on ActivityCodeType
P6ACTIVITYCODETYPESECURITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RDBMSUSERIDP6ACTIVITYCODETYPESECURITYinteger
PROJECTOBJECTIDP6ACTIVITYCODETYPESECURITYinteger
P6ACTIVITYEXPENSETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ActivityExpenseprojcostcost_item_idintegerThe unique ID generated by the system.
ProjectObjectIdP6ActivityExpenseprojcostproj_idintegerThe unique ID of the associated project.
ActivityObjectIdP6ActivityExpenseprojcosttask_idintegerThe unique ID of the activity to which the project expense is linked. Every project expense is associated with one activity in the project.
AutoComputeActualsP6ActivityExpenseprojcostauto_compute_act_flagstringThe flag that identifies whether the actual and remaining costs for the expense are computed automatically using the planned cost and the activity's schedule percent complete. If this option is selected, the actual/remaining costs are automatically updated when project actuals are applied. This assumes the expenses are made according to plan.
AccrualTypeP6ActivityExpenseprojcostcost_load_typestringThe accrual type for the project expense. If the accrual type is 'Start of Activity', the entire expense costs are accrued at the start date of the activity. If the accrual type is 'End of Activity', the entire expense costs are accrued at the finish date of the activity. If the accrual type is 'Uniform over Activity', the expense costs are accrued uniformly over the duration of the activity.
CostAccountObjectIdP6ActivityExpenseprojcostacct_idintegerThe unique ID of the cost account associated with the project expense.
ExpenseCategoryObjectIdP6ActivityExpenseprojcostcost_type_idintegerThe unique ID of the expense category for the project expense.
cbsobjectidP6ACTIVITYEXPENSEintegerCBS ID
PlannedCostP6ActivityExpenseprojcosttarget_costdoubleThe planned cost for the project expense. This field is named BudgetedCost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
ActualCostP6ActivityExpenseprojcostact_costdoubleThe actual cost for the project expense.
RemainingCostP6ActivityExpenseprojcostremain_costdoubleThe remaining cost for the project expense. Before actual expenses are made, remaining cost should be the same as planned cost. While the activity is in progress, the remaining cost should be updated to reflect the estimated remaining cost required for the expense. After the expense is completed, the remaining cost should be zero.
UnitOfMeasureP6ActivityExpenseprojcostqty_namestringThe unit of measure for the project expense.
PlannedUnitsP6ActivityExpenseprojcosttarget_qtydoubleThe planned number of units for the project expense. This number is multiplied by the price per unit to compute the planned cost. This field is named BudgetedUnits in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PricePerUnitP6ActivityExpenseprojcostcost_per_qtydoubleThe planned price per unit for the project expense. This number is multiplied by the planned number of units to compute the planned cost.
DocumentNumberP6ActivityExpenseprojcostpo_numberstringThe document number for the expense. Use this for the purchase order number, invoice number, requisition number, or similar, as needed.
VendorP6ActivityExpenseprojcostvendor_namestringThe name of the vendor providing the product or service associated with the expense.
ExpenseItemP6ActivityExpenseprojcostcost_namestringThe name of the project expense.
ExpenseDescriptionP6ActivityExpenseprojcostcost_descrclobThe description of the expense.
ActivityIdP6ActivityExpensetasktask_codestringThe short ID that uniquely identifies the activity within the project.
ActivityNameP6ActivityExpensetasktask_namestringThe name of the activity. The activity name does not have to be unique.
ActualUnitsP6ActivityExpensenumberThe actual units for the project expense.
AtCompletionCostP6ActivityExpensenumberThe sum of the actual plus remaining costs for the project expense. Computed as actual cost + remaining cost.
AtCompletionUnitsP6ActivityExpensenumberThe at completion units for the project expense.
CostAccountIdP6ActivityExpenseaccountacct_short_namestringThe id of associated cost account.
CostAccountNameP6ActivityExpenseaccountacct_namestringThe name of the associated cost account.
CBSCodeP6ActivityExpensestringCBS Code.
cbsnameP6ACTIVITYEXPENSEstringDESCRIPTION
ExpenseCategoryNameP6ActivityExpensecosttypecost_typestringThe name of the expense category.
ExpensePercentCompleteP6ActivityExpensenumberThe percent complete of the project expense.
OverBudgetP6ActivityExpensestringThe indicator that reflects whether the project expense is over budget. An expense is over budget when the actual cost + remaining cost exceeds the planned cost.
ProjectIdP6ActivityExpenseprojectproj_short_namestringThe short code that uniquely identifies the project.
RemainingUnitsP6ActivityExpensenumberThe remaining units for the project expense.
WBSObjectIdP6ActivityExpensetaskwbs_idintegerThe unique ID of the WBS for the activity.
IsBaselineP6ActivityExpensestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivityExpensestringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6ACTIVITYEXPENSEstringLast Update User
lastupdatedateP6ACTIVITYEXPENSEdateLast Update Date
createuserP6ACTIVITYEXPENSEstringCreate User
createdateP6ACTIVITYEXPENSEdateCreate Date
SKeyP6ACTIVITYEXPENSEintSKey generated key on ActivityExpense
P6ACTIVITYNOTETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ActivityNotetaskmemomemo_idintegerThe unique ID generated by the system.
ActivityObjectIdP6ActivityNotetaskmemotask_idintegerThe unique ID of the activity to which the activity note is assigned.
NotebookTopicObjectIdP6ActivityNotetaskmemomemo_type_idintegerThe unique ID of the associated notebook topic.
ProjectObjectIdP6ActivityNotetaskmemoproj_idintegerThe unique ID of the associated project.
NoteP6ActivityNotetaskmemotask_memoclobThe information that is associated with the notebook topic.
IsBaselineP6ActivityNotestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivityNotestringThe boolean value indicating if this business object is related to a template Project.
ActivityIdP6ActivityNotetasktask_codestringThe short ID that uniquely identifies the activity to which the activity note is assigned.
ActivityNameP6ActivityNotetasktask_namestringThe name of the activity to which the activity note is assigned.
NotebookTopicNameP6ActivityNotememotypememo_typestringThe name of the associated notebook topic.
ProjectIdP6ActivityNoteprojectproj_short_namestringThe short code that uniquely identifies the associated project.
RawTextNoteP6ActivityNoteclobThe information that is associated with the notebook topic, without any HTML.
WBSObjectIdP6ActivityNotetaskwbs_idintegerThe unique ID of the WBS for the activity.
lastupdateuserP6ACTIVITYNOTEstringLast Update User
lastupdatedateP6ACTIVITYNOTEdateLast Update Date
createuserP6ACTIVITYNOTEstringCreate User
createdateP6ACTIVITYNOTEdateCreate Date
SKeyP6ACTIVITYNOTEintSKey generated key on ActivityNote
P6ACTIVITYPERIODACTUALTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
FinancialPeriodObjectIdP6ActivityPeriodActualtaskfinfin_dates_idintegerThe unique ID of the associated financial period.
startdateP6ACTIVITYPERIODACTUALdatestart Date
enddateP6ACTIVITYPERIODACTUALdateend Date
ActivityObjectIdP6ActivityPeriodActualtaskfintask_idintegerThe unique ID of the associated activity.
ProjectObjectIdP6ActivityPeriodActualtaskfinproj_idintegerThe unique ID of the associated project.
ActualLaborUnitsP6ActivityPeriodActualtaskfinact_work_qtydoubleThe actual labor units on this activity during a financial period.
ActualLaborCostP6ActivityPeriodActualtaskfinact_work_costdoubleThe actual labor cost on this activity during a financial period.
ActualNonLaborUnitsP6ActivityPeriodActualtaskfinact_equip_qtydoubleThe actual nonlabor units on this activity during a financial period.
ActualNonLaborCostP6ActivityPeriodActualtaskfinact_equip_costdoubleThe actual nonlabor cost on this activity during a financial period.
ActualMaterialCostP6ActivityPeriodActualtaskfinact_mat_costdoubleThe actual material cost on this activity during a financial period.
ActualExpenseCostP6ActivityPeriodActualtaskfinact_expense_costdoubleThe actual expense cost on this activity during a financial period.
EarnedValueCostP6ActivityPeriodActualtaskfinbcwpdoubleThe earned value cost on this activity during a financial period.
PlannedValueLaborUnitsP6ActivityPeriodActualtaskfinsched_work_qtydoubleThe planned value labor units on this activity during a financial period.
PlannedValueCostP6ActivityPeriodActualtaskfinbcwsdoubleThe planned value cost on this activity during a financial period.
EarnedValueLaborUnitsP6ActivityPeriodActualtaskfinperfm_work_qtydoubleThe earned value labor units on this activity during a financial period.
IsBaselineP6ActivityPeriodActualstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivityPeriodActualstringThe boolean value indicating if this business object is related to a template Project.
WBSObjectIdP6ActivityPeriodActualtaskwbs_idintegerThe unique ID of the WBS for the activity.
lastupdateuserP6ACTIVITYPERIODACTUALstringLast Update User
lastupdatedateP6ACTIVITYPERIODACTUALdateLast Update Date
createuserP6ACTIVITYPERIODACTUALstringCreate User
createdateP6ACTIVITYPERIODACTUALdateCreate Date
SKeyP6ACTIVITYPERIODACTUALintSKey generated key on ActivityPeriodActual
P6ACTIVITYRISKTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ActivityObjectIdP6ActivityRisktaskrisktask_idintegerThe unique ID of the activity to which the risk is assigned.
ProjectObjectIdP6ActivityRisktaskriskproj_idintegerThe unique ID of the associated project.
RiskObjectIdP6ActivityRisktaskriskrisk_idintegerThe unique ID of the associated risk.
ProjectIdP6ActivityRiskprojectproj_short_namestringThe short code of the associated project.
ProjectNameP6ActivityRiskprojwbswbs_namestringThe name of the associated project.
ActivityIdP6ActivityRisktasktask_codestringThe id of an activity impacted by the Risk.
ActivityNameP6ActivityRisktasktask_namestringThe name of an activity impacted by the Risk. The activity name does not have to be unique.
RiskNameP6ActivityRiskrisknamestringThe name of the Risk. Does not need to be unique.
lastupdateuserP6ACTIVITYRISKstringLast Update User
lastupdatedateP6ACTIVITYRISKdateLast Update Date
createuserP6ACTIVITYRISKstringCreate User
createdateP6ACTIVITYRISKdateCreate Date
SKeyP6ACTIVITYRISKintSKey generated key on Risk
P6ACTIVITYSTEPTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ActivitySteptaskprocproc_idintegerThe unique ID generated by the system.
ActivityObjectIdP6ActivitySteptaskproctask_idintegerThe unique ID of the activity to which the steps are assigned.
SequenceNumberP6ActivitySteptaskprocseq_numintegerThe sequence number for sorting.
ProjectObjectIdP6ActivitySteptaskprocproj_idintegerThe unique ID of the associated project.
IsCompletedP6ActivitySteptaskproccomplete_flagstringThe flag that indicates whether the step has been completed.
NameP6ActivitySteptaskprocproc_namestringThe name of the activity step.
WeightP6ActivitySteptaskprocproc_wtdoubleThe weight that is assigned to the step. This is a user defined field that is used to calculate the physical percent complete when the project option is set.
PercentCompleteP6ActivitySteptaskproccomplete_pctdoubleThe percent complete for the step.
DescriptionP6ActivitySteptaskprocproc_descrclobThe description of the activity step.
IsBaselineP6ActivityStepstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ActivityStepstringThe boolean value indicating if this business object is related to a template Project.
ActivityIdP6ActivitySteptasktask_codestringThe short ID that uniquely identifies the activity within the project.
ActivityNameP6ActivitySteptasktask_namestringThe name of the activity. The activity name does not have to be unique.
ProjectIdP6ActivityStepprojectproj_short_namestringThe short code that uniquely identifies the project.
WBSObjectIdP6ActivitySteptaskwbs_idintegerThe unique ID of the WBS for the activity.
WeightPercentP6ActivityStepnumberThe non-editable field that displays the percentage amount that corresponds to the step. It is calculated by taking the weight of the step and dividing it by the total of all weights for the activity.
lastupdateuserP6ACTIVITYSTEPstringLast Update User
lastupdatedateP6ACTIVITYSTEPdateLast Update Date
createuserP6ACTIVITYSTEPstringCreate User
createdateP6ACTIVITYSTEPdateCreate Date
SKeyP6ACTIVITYSTEPintSKey generated key on ActivityStep
P6BASELINETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6BaselineTypebasetypebase_type_idintegerThe unique ID generated by the system.
SequenceNumberP6BaselineTypebasetypebase_type_seq_numintegerThe sequence number for sorting.
NameP6BaselineTypebasetypebase_typestringThe name of this baseline type.
lastupdateuserP6BASELINETYPEstringLast Update User
lastupdatedateP6BASELINETYPEdateLast Update Date
createuserP6BASELINETYPEstringCreate User
createdateP6BASELINETYPEdateCreate Date
SKeyP6BASELINETYPEintSKey generated key on BaselineType
P6CALENDARTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Calendarcalendarclndr_idintegerThe unique ID generated by the system.
IsDefaultP6Calendarcalendardefault_flagstringThe flag that identifies the default global calendar (applies to global calendars only).
NameP6Calendarcalendarclndr_namestringThe name of the calendar.
ProjectObjectIdP6Calendarcalendarproj_idintegerThe unique ID of the associated project.
BaseCalendarObjectIdP6Calendarcalendarbase_clndr_idintegerThe unique ID of the global calendar to which this calendar is linked. Any changes to the global calendar are automatically propagated to this calendar.
lastchangedateP6CALENDARdateCalendar - lastchangedate maps to PSTG_CALENDARFULL.lastchangedate
TypeP6Calendarcalendarclndr_typestringThe calendar type - either 'Global', 'Resource', or 'Project'. 'Global' calendars can be assigned to projects and resources. 'Resource' calendars can be assigned only to resources. 'Project' calendars are specific to projects.
daydateP6CALENDARdateCalendar - daydate maps to PSTG_CALENDARFULL.daydate
WeekdayNumberP6CALENDARintegerCalendar - WeekdayNumber maps to PSTG_CALENDARFULL.WeekdayNumber
WorkDayFlagP6CALENDARstring
TotalWorkHoursP6CALENDARdouble
WorkHoursByHalfHourP6CALENDARstring
WorkDayStartTimeP6CALENDARdateCalendar - WorkDayStartTime maps to PSTG_CALENDARFULL.WorkDayStartTime
WorkDayFinishTimeP6CALENDARdateCalendar - WorkDayFinishTime maps to PSTG_CALENDARFULL.WorkDayFinishTime
IsBaselineP6CalendarstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6CalendarstringThe boolean value indicating if this business object is related to a template Project.
lastupdatedateP6CALENDARdateLast Update Date
SKeyP6CALENDARidentitySKey generated key on Calendar
P6CHANGESETTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ChangeSetchgheadtransaction_idintegerThe unique ID generated by the system.
changedateP6CHANGESETdateCHANGESET - transactiondate maps to CHANGESET.transaction_date
RequestUserNameP6ChangeSetchgheadrequest_user_namestringThe name of the user requesting this change
RequestUserObjectIdP6ChangeSetchgheadrequest_user_idintegerThe unique ID of the user modifying the activities, assignments or steps.
lastupdateuserP6CHANGESETstringLast Update User
lastupdatedateP6CHANGESETdateLast Update Date
createuserP6CHANGESETstringCreate User
createdateP6CHANGESETdateCreate Date
P6ACTIVITYUPDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ChangeSetObjectIdP6ActivityUpdatechgtasktransaction_idintegerthe unique ID of the associated Changeset.
ActivityObjectIdP6ActivityUpdatechgtasktask_idintegerThe unique ID of the Activity associated to the ActivityUpdate.
ProjectObjectIdP6ActivityUpdatechgtaskproj_idintegerThe unique ID of the Project associated to the ActivityUpdate.
changedateP6ACTIVITYUPDATEdateACTIVITYUPDATE - date maps to CHGTASK.transaction_date
StatusP6ActivityUpdatechgtaskstatus_codestringThe status of the requested activity changes: 'Pending', 'Approved' or 'Held'.
ResubmittedDateP6ActivityUpdatechgtaskresubmitted_datedateThe date the new changes were marked Resubmitted.
RejectedDateP6ActivityUpdatechgtaskrejected_datedateThe date the new changes were marked rejected.
PendingActualStartDateP6ActivityUpdatechgtasknew_act_start_datedateThe new actual start date for the activity pending approval if required.
OverrideActualStartDateP6ActivityUpdatechgtaskovr_act_start_datedateThe overridden new actual start date for the activity.
PendingActualFinishDateP6ActivityUpdatechgtasknew_act_end_datedateThe new actual finish date for the activity pending approval if required.
OverrideActualFinishDateP6ActivityUpdatechgtaskovr_act_end_datedateThe overridden new actual finish date for the activity.
PendingRemainingDurationP6ActivityUpdatechgtasknew_remain_drtndoubleThe new remaining duration of the activity pending approval if required.
OverrideRemainingDurationP6ActivityUpdatechgtaskovr_remain_drtndoubleThe overridden new remaining duration of the activity.
PendingPercentCompleteP6ActivityUpdatechgtasknew_complete_pctintegerThe new percent complete pending approval if required.
OverridePercentCompleteP6ActivityUpdatechgtaskovr_complete_pctintegerThe overridden new percent complete.
OverrideActualLaborUnitsP6ActivityUpdatechgtaskovr_act_work_qtydoubleThe overridden new actual units for all labor resources assigned to the activity.
PendingActualLaborUnitsP6ActivityUpdatechgtasknew_act_work_qtydoubleThe new actual units for all labor resources assigned to the activity pending approval if required.
PendingActualNonLaborUnitsP6ActivityUpdatechgtasknew_act_equip_qtydoubleThe new actual units for all nonlabor resources assigned to the activity pending approval if required.
OverrideActualNonLaborUnitsP6ActivityUpdatechgtaskovr_act_equip_qtydoubleThe overridden new actual units for all nonlabor resources assigned to the activity.
OverrideRemainingLaborUnitsP6ActivityUpdatechgtaskovr_remain_work_qtydoubleThe overridden remaining units for all labor resources assigned to the activity.
PendingRemainingLaborUnitsP6ActivityUpdatechgtasknew_remain_work_qtydoubleThe new remaining units for all labor resources assigned to the activity pending approval if required.
OverrideRemainingNonLaborUnitsP6ActivityUpdatechgtaskovr_remain_equip_qtydoubleThe overridden remaining units for all nonlabor resources assigned to the activity.
PendingRemainingNonLaborUnitsP6ActivityUpdatechgtasknew_remain_equip_qtydoubleThe new remaining units for all nonlabor resources assigned to the activity pending approval if required.
PendingExpectedFinishDateP6ActivityUpdatechgtasknew_exp_end_datedateThe new date the activity is expected to be finished pending approval if required.
OverrideExpectedFinishDateP6ActivityUpdatechgtaskovr_exp_end_datedateThe overridden new date the activity is expected to be finished.
ApprovalDateP6ActivityUpdatechgtaskapproval_datedateThe date the new activity changes were approved.
ApprovalUserNameP6ActivityUpdatechgtaskapproval_user_namestringThe name of the user approving the changes.
ApprovalUserObjectIdP6ActivityUpdatechgtaskapproval_user_idintegerThe unique ID of the user approving the activity changes.
HeldDateP6ActivityUpdatechgtaskheld_datedateThe date the new changes were marked held.
requestusernameP6ACTIVITYUPDATEstringCHANGESET - requestusername maps to CHANGESET.request_user_name
RequestUserObjectIdP6ActivityUpdatechgheadrequest_user_idintegerThe unique ID of the user modifying the task, assignment or step.
P6ACTIVITYSTEPUPDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ChangeSetObjectIdP6ActivityStepUpdatechgtaskproctransaction_idintegerThe unique ID of the associated change set.
ActivityStepObjectIdP6ActivityStepUpdatechgtaskprocproc_idintegerThe unique ID of the associated step.
StatusP6ActivityStepUpdatechgtaskprocstatus_codestringThe status of the requested activity step changes: 'Pending', 'Approved' or 'Held'.
ResubmittedDateP6ActivityStepUpdatechgtaskprocresubmitted_datedateThe date the new changes were marked Resubmitted.
RejectedDateP6ActivityStepUpdatechgtaskprocrejected_datedateThe date the new changes were marked rejected.
changedateP6ACTIVITYSTEPUPDATEdateACTIVITYSTEPUPDATE - date maps to CHGTASKPROC.transaction_date
ProjectObjectIdP6ActivityStepUpdatechgtaskprocproj_idintegerThe unique ID of the associated project.
ActivityObjectIdP6ActivityStepUpdatechgtaskproctask_idintegerThe unique ID of the activity to which the associated step is assigned.
PendingPercentCompleteP6ActivityStepUpdatechgtaskprocnew_complete_pctintegerThe new percent complete for the step pending approval if required.
OverridePercentCompleteP6ActivityStepUpdatechgtaskprocovr_complete_pctintegerThe overridden new percent complete for the step.
ApprovalDateP6ActivityStepUpdatechgtaskprocapproval_datedateThe date the changes were approved.
ApprovalUserNameP6ActivityStepUpdatechgtaskprocapproval_user_namestringThe name of the user approving this change.
ApprovalUserObjectIdP6ActivityStepUpdatechgtaskprocapproval_user_idintegerThe unique ID of the user approving this change.
HeldDateP6ActivityStepUpdatechgtaskprocheld_datedateThe date the changes were marked held.
requestusernameP6ACTIVITYSTEPUPDATEstringACTIVITYSTEPUPDATE - requestusername maps to CHGTASKPROC.request_user_name
RequestUserObjectIdP6ActivityStepUpdatechgheadrequest_user_idintegerThe unique ID of the user requesting this change.
PendingStepNameP6ActivityStepUpdatechgtaskprocproc_namestringThe new step name pending approval if required.
OverrideStepNameP6ActivityStepUpdatechgtaskprocovr_proc_namestringThe overridden new step name for the step.
P6ACTIVITYSTEPCREATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ActivityStepObjectIdP6ActivityStepCreateaddtaskprocproc_idintegerThe unique ID of the associated step.
ChangeSetObjectIdP6ActivityStepCreateaddtaskproctransaction_idintegerThe unique ID of the associated change set.
ActivityObjectIdP6ActivityStepCreateaddtaskproctask_idintegerThe unique ID of the activity to which the associated step is assigned.
projectobjectidP6ACTIVITYSTEPCREATEintegerACTIVITYSTEPCREATE projectobjectid maps to ADDTASKPROC.proj_id
statusP6ACTIVITYSTEPCREATEstringACTIVITYSTEPCREATE - transactionstatuscode maps to ADDTASKPROC.status_code
changedateP6ACTIVITYSTEPCREATEdateACTIVITYSTEPCREATE - date maps to ADDTASKPROC.transaction_date
ActivityStepNameP6ActivityStepCreateaddtaskprocproc_namestringThe step name for this Activity step.
StepPercentCompleteP6ActivityStepCreateaddtaskproccomplete_pctintegerThe step percent complete for this Activity step.
StepWeightP6ActivityStepCreateaddtaskprocproc_wtdoubleThe weight that is assigned to the step.
P6ACTIVITYSTEPDELTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
activitystepobjectidP6ACTIVITYSTEPDELintegerACTIVITYSTEPDEL primary key maps to DELTASKPROC.proc_id
changesetobjectidP6ACTIVITYSTEPDELintegerACTIVITYSTEPDEL foreign key maps to DELTASKPROC.transaction_id
activityobjectidP6ACTIVITYSTEPDELintegerACTIVITYSTEPDEL activityobjectid maps to DELTASKPROC.task_id
projectobjectidP6ACTIVITYSTEPDELintegerACTIVITYSTEPDEL projectobjectid maps to DELTASKPROC.proj_id
changedateP6ACTIVITYSTEPDELdateACTIVITYSTEPDEL - date maps to DELTASKPROC.transaction_date
activitystepnameP6ACTIVITYSTEPDELstringACTIVITYSTEPDEL - activitystepname maps to DELTASKPROC.proc_name
P6ACTIVITYCOMMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
commentidP6ACTIVITYCOMMENTintegerACTIVITYCOMMENT primary key maps to DISCUSSION.discussion_id
ActivityObjectIdP6ActivityCommentdiscussiontask_idintegerThe unique ID of the activity to which this comment is added.
UserObjectIdP6ActivityCommentdiscussionuser_idintegerThe unique ID of the user who added this comment.
CommentDateP6ActivityCommentdiscussiondiscussion_datedateThe date on which this comment was added.
CommentTextP6ActivityCommentdiscussiondiscussion_valuestringThe comment.
P6ACTIVITYCODEUPDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ChangeSetObjectIdP6ActivityCodeUpdatechgtaskactvtransaction_idintegerThe unique ID of the associated Changeset.
ActivityObjectIdP6ActivityCodeUpdatechgtaskactvtask_idintegerThe unique ID of the activity to which the associated code is assigned.
ActivityCodeTypeObjectIdP6ActivityCodeUpdatechgtaskactvactv_code_type_idintegerThe unique ID of the activity code type.
ProjectObjectIdP6ActivityCodeUpdatechgtaskactvproj_idintegerThe unique ID of the Project associated to the ActivityCodeUpdate.
ApprovalUserObjectIdP6ActivityCodeUpdatechgtaskactvapproval_user_idintegerThe unique ID of the user approving the changes.
changedateP6ACTIVITYCODEUPDATEdateACTIVITYCODEUPDATE - date maps to CHGTASKACTV.transaction_date
StatusP6ActivityCodeUpdatechgtaskactvstatus_codestringThe status of the requested activity code assignment changes: 'Pending', 'Approved' or 'Held'.
ResubmittedDateP6ActivityCodeUpdatechgtaskactvresubmitted_datedateThe date the new changes were marked Resubmitted.
RejectedDateP6ActivityCodeUpdatechgtaskactvrejected_datedateThe date the new changes were marked rejected.
OverrideActivityCodeIdP6ActivityCodeUpdatechgtaskactvovr_actv_code_idintegerThe overridden new activity code id for this activity.
PendingActivityCodeIdP6ActivityCodeUpdatechgtaskactvnew_actv_code_idintegerThe new activity code id for this activity, pending approval if required.
RequestUserObjectIdP6ActivityCodeUpdatechgheadrequest_user_idintegerThe unique ID of the user modifying the task, assignment, step, code or UDF.
ApprovalUserNameP6ActivityCodeUpdatechgtaskactvapproval_user_namestringThe name of the user approving the changes.
ApprovalDateP6ActivityCodeUpdatechgtaskactvapproval_datedateThe date the new activity changes were approved.
HeldDateP6ActivityCodeUpdatechgtaskactvheld_datedateThe date the new changes were marked held.
P6ACTIVITYNOTEUPDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ChangeSetObjectIdP6ActivityNoteUpdatechgtaskmemotransaction_idintegerThe unique ID of the associated change set.
ActivityObjectIdP6ActivityNoteUpdatechgtaskmemotask_idintegerThe unique ID of the activity to which the associated note is assigned.
ActivityNoteObjectIdP6ActivityNoteUpdatechgtaskmemomemo_idintegerThe unique ID of the associated note.
changedateP6ACTIVITYNOTEUPDATEdateACTIVITYNOTEUPDATE - date maps to CHGTASKMEMO.transaction_date
statusP6ACTIVITYNOTEUPDATEstringACTIVITYNOTEUPDATE - transactionstatuscode maps to CHGTASKMEMO.status_code
requestusernameP6ACTIVITYNOTEUPDATEstringCHANGESET - requestusername maps to CHANGESET.request_user_name
RequestUserObjectIdP6ActivityNoteUpdatechgheadrequest_user_idintegerThe unique ID of the user requesting this change.
P6USERDEFINEDVALUEUPDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ChangeSetObjectIdP6UserDefinedValueUpdatechgudfvaluetransaction_idintegerThe unique ID of the associated Changeset.
UDFTypeObjectIdP6UserDefinedValueUpdatechgudfvalueudf_type_idintegerThe unique ID of the associated UDF type.
ForeignObjectIdP6UserDefinedValueUpdatechgudfvaluefk_idintegerThe unique ID of the business object to which the UDF is assigned: ProjectObjectId, ActivityObjectId, ResourceObjectId, etc.
changedateP6USERDEFINEDVALUEUPDATEdateUSERDEFINEDVALUEUPDATE - date maps to CHGUDFVALUE.transaction_date
ProjectObjectIdP6UserDefinedValueUpdatechgudfvalueproj_idintegerThe unique ID of the Project associated to the UDF.
StatusP6UserDefinedValueUpdatechgudfvaluestatus_codestringThe status of the requested activity code assignment changes: 'Pending', 'Approved' or 'Held'.
ResubmittedDateP6UserDefinedValueUpdatechgudfvalueresubmitted_datedateThe date the new changes were marked Resubmitted.
RejectedDateP6UserDefinedValueUpdatechgudfvaluerejected_datedateThe date the new changes were marked rejected.
OverrideUdfTextP6UserDefinedValueUpdatechgudfvalueovr_udf_textstringThe overridden new udf text value for this activity.
PendingUdfTextP6UserDefinedValueUpdatechgudfvaluenew_udf_textstringThe new udf text value for this activity, pending approval if required.
OverrideUdfStartDateP6UserDefinedValueUpdatechgudfvalueovr_udf_datedateThe overridden new udf start date value for this activity.
PendingUdfStartDateP6UserDefinedValueUpdatechgudfvaluenew_udf_datedateThe new udf start date value for this activity, pending approval if required.
OverrideUdfEndDateP6UserDefinedValueUpdatechgudfvalueovr_udf_datedateThe overridden new udf end date value for this activity.
PendingUdfEndDateP6UserDefinedValueUpdatechgudfvaluenew_udf_datedateThe new udf end date value for this activity, pending approval if required.
OverrideUdfCodeIdP6UserDefinedValueUpdatechgudfvalueovr_udf_code_idintegerThe overridden new udf code id for this activity.
PendingUdfCodeIdP6UserDefinedValueUpdatechgudfvaluenew_udf_code_idintegerThe new udf code id for this activity, pending approval if required.
OverrideUdfNumberP6UserDefinedValueUpdatechgudfvalueovr_udf_numbernumberThe overridden new udf number value for this activity.
PendingUdfNumberP6UserDefinedValueUpdatechgudfvaluenew_udf_numbernumberThe new udf number value for this activity, pending approval if required.
OverrideUdfIntegerP6UserDefinedValueUpdatechgudfvalueovr_udf_numbernumberThe overridden new udf integer value for this activity.
PendingUdfIntegerP6UserDefinedValueUpdatechgudfvaluenew_udf_numbernumberThe new udf integer value for this activity, pending approval if required.
OverrideUdfCostP6UserDefinedValueUpdatechgudfvalueovr_udf_numbernumberThe overridden new udf cost value for this activity.
PendingUdfCostP6UserDefinedValueUpdatechgudfvaluenew_udf_numbernumberThe new udf cost value for this activity, pending approval if required.
RequestUserObjectIdP6UserDefinedValueUpdatechgheadrequest_user_idintegerThe unique ID of the user modifying the task, assignment, step, code or UDF.
ApprovalUserObjectIdP6UserDefinedValueUpdatechgudfvalueapproval_user_idintegerThe unique ID of the user approving the changes.
ApprovalUserNameP6UserDefinedValueUpdatechgudfvalueapproval_user_namestringThe name of the user approving the changes.
ApprovalDateP6UserDefinedValueUpdatechgudfvalueapproval_datedateThe date the new activity changes were approved.
HeldDateP6UserDefinedValueUpdatechgudfvalueheld_datedateThe date the new changes were marked held.
P6RESOURCEASSIGNMENTUPDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ChangeSetObjectIdP6ResourceAssignmentUpdatechgtrsrctransaction_idintegerThe unique ID of the associated Changeset.
ResourceAssignmentObjectIdP6ResourceAssignmentUpdatechgtrsrctaskrsrc_idintegerThe unique ID of the ResourceAssignment associated to the AssignmentUpdate.
ActivityObjectIdP6ResourceAssignmentUpdatechgtrsrctask_idintegerThe unique ID of the activity to which the associated assignment is assigned.
changedateP6RESOURCEASSIGNMENTUPDATEdateRESOURCEASSIGNMENTUPDATE - date maps to CHGTRSRC.transaction_date
StatusP6ResourceAssignmentUpdatechgtrsrcstatus_codestringThe status of the requested resource assignment changes: 'Pending', 'Approved' or 'Held'.
ResubmittedDateP6ResourceAssignmentUpdatechgtrsrcresubmitted_datedateThe date the new changes were marked Resubmitted.
RejectedDateP6ResourceAssignmentUpdatechgtrsrcrejected_datedateThe date the new changes were marked rejected.
ProjectObjectIdP6ResourceAssignmentUpdatechgtrsrcproj_idintegerThe unique ID of the Project associated to the AssignmentUpdate.
PendingActualStartDateP6ResourceAssignmentUpdatechgtrsrcnew_act_start_datedateThe new date the resource actually started working on the activity pending approval if required.
OverrideActualStartDateP6ResourceAssignmentUpdatechgtrsrcovr_act_start_datedateThe overridden new date the resource actually started working on the activity.
PendingActualFinishDateP6ResourceAssignmentUpdatechgtrsrcnew_act_end_datedateThe new date the resource actually finished working on the activity pending approval if required.
OverrideActualFinishDateP6ResourceAssignmentUpdatechgtrsrcovr_act_end_datedateThe overridden date the resource actually finished working on the activity.
OverrideActualUnitsP6ResourceAssignmentUpdatechgtrsrcovr_act_reg_qtydoubleThe overridden new actual units worked by the resource on this activity.
PendingActualUnitsP6ResourceAssignmentUpdatechgtrsrcnew_act_reg_qtydoubleThe new actual units worked by the resource on this activity pending approval if required.
OverrideRemainingUnitsP6ResourceAssignmentUpdatechgtrsrcovr_remain_qtydoubleThe overridden new remaining units of work to be performed by this resource on this activity.
PendingRemainingUnitsP6ResourceAssignmentUpdatechgtrsrcnew_remain_qtydoubleThe new remaining units of work to be performed by this resource on this activity, pending approval if required.
PendingRemainingDurationP6ResourceAssignmentUpdatechgtrsrcnew_remain_drtndoubleThe new remaining duration of the resource assignment pending approval if required.
OverrideRemainingDurationP6ResourceAssignmentUpdatechgtrsrcovr_remain_drtndoubleThe overridden new remaining duration of the resource assignment.
ApprovalDateP6ResourceAssignmentUpdatechgtrsrcapproval_datedateThe date the new activity changes were approved.
ApprovalUserNameP6ResourceAssignmentUpdatechgtrsrcapproval_user_namestringThe name of the user approving the changes.
ApprovalUserObjectIdP6ResourceAssignmentUpdatechgtrsrcapproval_user_idintegerThe unique ID of the user approving the changes.
HeldDateP6ResourceAssignmentUpdatechgtrsrcheld_datedateThe date the new changes were marked held.
PendingRemainingFinishDateP6ResourceAssignmentUpdatechgtrsrcnew_reend_datedateThe new remaining finish date for the resource working on the activity pending approval if required.
OverrideRemainingFinishDateP6ResourceAssignmentUpdatechgtrsrcovr_reend_datedateThe overridden new remaining finish date for the resource working on the activity.
requestusernameP6RESOURCEASSIGNMENTUPDATEstringCHANGESET - requestusername maps to CHANGESET.request_user_name
RequestUserObjectIdP6ResourceAssignmentUpdatechgheadrequest_user_idintegerThe unique ID of the user modifying the task, assignment or step.
P6COSTACCOUNTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6CostAccountaccountacct_idintegerThe unique ID generated by the system.
SequenceNumberP6CostAccountaccountacct_seq_numintegerThe sequence number for sorting.
IdP6CostAccountaccountacct_short_namestringThe short ID assigned to each cost account for identification. Each cost account is uniquely identified by concatenating its own ID together with its parents' IDs.
NameP6CostAccountaccountacct_namestringThe name of the cost account.
ParentObjectIdP6CostAccountaccountparent_acct_idintegerThe unique ID of the parent cost account of this cost account in the hierarchy.
DescriptionP6CostAccountaccountacct_descrclobThe description of the cost account.
lastupdateuserP6COSTACCOUNTstringLast Update User
lastupdatedateP6COSTACCOUNTdateLast Update Date
createuserP6COSTACCOUNTstringCreate User
createdateP6COSTACCOUNTdateCreate Date
SKeyP6COSTACCOUNTintSKey generated key on CostAccount
P6COSTACCOUNTHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ParentObjectIdP6COSTACCOUNTHIERARCHYinteger
ParentSequenceNumberP6COSTACCOUNTHIERARCHYinteger
ParentNameP6COSTACCOUNTHIERARCHYstring
ParentIdP6COSTACCOUNTHIERARCHYstring
ChildObjectIdP6COSTACCOUNTHIERARCHYinteger
ChildSequenceNumberP6COSTACCOUNTHIERARCHYinteger
ChildNameP6COSTACCOUNTHIERARCHYstring
ChildIdP6COSTACCOUNTHIERARCHYstring
ParentLevelsBelowRootP6COSTACCOUNTHIERARCHYinteger
ChildLevelsBelowRootP6COSTACCOUNTHIERARCHYinteger
LevelsBetweenP6COSTACCOUNTHIERARCHYinteger
ChildHasChildrenP6COSTACCOUNTHIERARCHYstring
FullPathNameP6COSTACCOUNTHIERARCHYstring
SKeyP6COSTACCOUNTHIERARCHYint
P6COSTSECURITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RDBMSUSERIDP6COSTSECURITYinteger
PROJECTOBJECTIDP6COSTSECURITYinteger
WHOLEPROJECTFLAGP6COSTSECURITYcharacter
P6CURRENCYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Currencycurrtypecurr_idintegerThe unique ID generated by the system.
DecimalPlacesP6Currencycurrtypedecimal_digit_cntdoubleThe number of decimal places displayed.
SymbolP6Currencycurrtypecurr_symbolstringThe currency symbol displayed.
DecimalSymbolP6Currencycurrtypedecimal_symbolstringThe decimal symbol displayed.
DigitGroupingSymbolP6Currencycurrtypedigit_group_symbolstringThe symbol used to group the numbers.
PositiveSymbolP6Currencycurrtypepos_curr_fmt_typestringThe symbol used to display a positive currency.
NegativeSymbolP6Currencycurrtypeneg_curr_fmt_typestringThe symbol used to display a negative currency.
NameP6Currencycurrtypecurr_typestringThe name of the currency.
IdP6Currencycurrtypecurr_short_namestringThe unique currency abbreviation for each currency.
ExchangeRateP6Currencycurrtypebase_exch_ratedoubleThe exchange rate against the base currency.
IsBaseCurrencyP6CurrencystringThe currency used to store cost in the Project Management database. The exchange rate for the base currency is always 1.0. The base currency ID, name, and symbol default to U.S. dollars and can be edited but never deleted.
lastupdateuserP6CURRENCYstringLast Update User
lastupdatedateP6CURRENCYdateLast Update Date
createuserP6CURRENCYstringCreate User
createdateP6CURRENCYdateCreate Date
SKeyP6CURRENCYintSKey generated key on Currency
P6DOCUMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Documentdocumentdoc_idintegerThe unique ID generated by the system.
SequenceNumberP6Documentdocumentdoc_seq_numintegerThe sequence number for sorting.
DeliverableP6Documentdocumentdeliv_flagstringThe flag that indicates that the work product or document is a project deliverable.
TitleP6Documentdocumentdoc_namestringThe title or name of a project work product or document.
ParentObjectIdP6Documentdocumentparent_doc_idintegerThe unique ID of the parent document of this document in the hierarchy.
ProjectObjectIdP6Documentdocumentproj_idintegerThe unique ID of the associated project.
DocumentStatusCodeObjectIdP6Documentdocumentdoc_status_idintegerThe unique ID of the associated document status code.
DocumentCategoryObjectIdP6Documentdocumentdoc_catg_idintegerThe unique ID of the associated document category.
RevisionDateP6Documentdocumentdoc_datedateThe date of the work product or document's last update.
VersionP6Documentdocumentversion_namestringThe work product or document's version number.
ReferenceNumberP6Documentdocumentdoc_short_namestringThe work product or document's reference or catalog number.
AuthorP6Documentdocumentauthor_namestringThe person who created the work product or document.
PrivateLocationP6Documentdocumentprivate_locstringThe work product or document's private file location.
PublicLocationP6Documentdocumentpublic_locstringThe work product or document's publicly-accessible file location.
ResourceObjectIdP6Documentdocumentrsrc_idintegerThe unique ID of the associated resource.
DocumentTypeP6Documentdocumentdoc_mgmt_typestringThe type of document: 'Non-Collaboration' or 'Collaboration'.
DocumentCategoryNameP6Documentdoccatgdoc_catg_namestringThe name of the associated document category.
DocumentStatusCodeNameP6Documentdocstatdoc_status_codestringThe name of the associated document status code.
ProjectIdP6Documentprojectproj_short_namestringThe short code that uniquely identifies the project.
ResourceIdP6Documentrsrcrsrc_short_namestringThe short code that uniquely identifies the associated resource.
ResourceNameP6Documentrsrcrsrc_namestringThe name of the associated resource.
IsBaselineP6DocumentstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6DocumentstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6DOCUMENTstringLast Update User
lastupdatedateP6DOCUMENTdateLast Update Date
createuserP6DOCUMENTstringCreate User
createdateP6DOCUMENTdateCreate Date
SKeyP6DOCUMENTintSKey generated key on Document
P6DOCUMENTCATEGORYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6DocumentCategorydoccatgdoc_catg_idintegerThe unique ID generated by the system.
SequenceNumberP6DocumentCategorydoccatgseq_numintegerThe sequence number for sorting.
NameP6DocumentCategorydoccatgdoc_catg_namestringThe name of the document category.
lastupdateuserP6DOCUMENTCATEGORYstringLast Update User
lastupdatedateP6DOCUMENTCATEGORYdateLast Update Date
createuserP6DOCUMENTCATEGORYstringCreate User
createdateP6DOCUMENTCATEGORYdateCreate Date
SKeyP6DOCUMENTCATEGORYintSKey generated key on DocumentCategory
P6DOCUMENTSTATUSCODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6DocumentStatusCodedocstatdoc_status_idintegerThe unique ID generated by the system.
SequenceNumberP6DocumentStatusCodedocstatseq_numintegerThe sequence number for sorting.
NameP6DocumentStatusCodedocstatdoc_status_codestringThe name of the document status code.
lastupdateuserP6DOCUMENTSTATUSCODEstringLast Update User
lastupdatedateP6DOCUMENTSTATUSCODEdateLast Update Date
createuserP6DOCUMENTSTATUSCODEstringCreate User
createdateP6DOCUMENTSTATUSCODEdateCreate Date
SKeyP6DOCUMENTSTATUSCODEintSKey generated key on DocumentStatusCode
P6EPSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6EPSprojwbswbs_idintegerThe unique ID generated by the system.
ProjectObjectIdP6EPSprojwbsproj_idintegerThe internal Project ID of the EPS. This ID cannot be used to load a Project object directly.
OBSObjectIdP6EPSprojwbsobs_idintegerThe unique ID of the project manager from the project's OBS tree who is responsible for the EPS.
SequenceNumberP6EPSprojwbsseq_numintegerThe sequence number for sorting.
NameP6EPSprojwbswbs_namestringThe name of the EPS element.
ParentObjectIdP6EPSprojwbsparent_wbs_idintegerThe unique ID of the parent EPS of this EPS in the hierarchy.
OriginalBudgetP6EPSprojwbsorig_costdoubleThe original budget for the project.
IndependentETCTotalCostP6EPSprojwbsindep_remain_total_costdoubleThe user-entered ETC total cost.
IndependentETCLaborUnitsP6EPSprojwbsindep_remain_work_qtydoubleThe user-entered ETC total labor.
AnticipatedStartDateP6EPSprojwbsanticip_start_datedateThe anticipated start date of the EPS. User-entered - not dependent upon any other fields. If there are no children, the anticipated start date will be the start date displayed in the columns.
AnticipatedFinishDateP6EPSprojwbsanticip_end_datedateThe anticipated finish date of the EPS. User-entered - not dependent upon any other fields. If there are no children, the anticipated finish date will be the finish date displayed in the columns.
CurrentBudgetP6EPSnumberThe sum of the original budget plus the approved and pending budgets from the budget change log.
CurrentVarianceP6EPSnumberThe difference between the current budget and the total spending plan. Calculated as current budget - total spending plan. Not rolled up
DistributedCurrentBudgetP6EPSnumberThe current budget values from one level lower.
FinishDateP6EPSdateThe finish date of the EPS.
fullnameP6EPSstringEPS - Full name
IdP6EPSprojectproj_short_namestringThe short code assigned to each EPS element for identification.
LastSummarizedDateP6EPSprojectlast_tasksum_datedateThe date the project was last summarized.
OBSNameP6EPSobsobs_namestringThe name of the person/role in the organization, sometimes referred to as the "responsible manager".
PlannedStartDateP6EPSprojectplan_start_datedateThe planned start date of the project. Used by the project scheduler.
ProposedBudgetP6EPSnumberThe Proposed Budget, which is the sum of the original budget plus the approved and pending budgets from the budget change log.
StartDateP6EPSdateThe start date of the EPS.
sumplannedstartdateP6EPSdateEPS - SumPlannedStartDate maps to eps.SumPlannedStartDate
sumplannedfinishdateP6EPSdateEPS - SumPlannedFinishDate maps to eps.SumPlannedFinishDate
sumplanneddurationP6EPSnumberEPS - SumPlannedDuration maps to eps.SumPlannedDuration
sumplannedlaborunitsP6EPSnumberEPS - SumPlannedLaborUnits maps to eps.SumPlannedLaborUnits
sumplannednonlaborunitsP6EPSnumberEPS - SumPlannedNonLaborUnits maps to eps.SumPlannedNonLaborUnits
sumplannedexpensecostP6EPSnumberEPS - SumPlannedExpenseCost maps to eps.SumPlannedExpenseCost
sumplannedlaborcostP6EPSnumberEPS - SumPlannedLaborCost maps to eps.SumPlannedLaborCost
sumplannedmaterialcostP6EPSnumberEPS - SumPlannedMaterialCost maps to eps.SumPlannedMaterialCost
sumplannednonlaborcostP6EPSnumberEPS - SumPlannedNonLaborCost maps to eps.SumPlannedNonLaborCost
sumplannedtotalcostP6EPSnumberEPS - SumPlannedTotalCost maps to eps.SumPlannedTotalCost
sumaccountingvarbylaborunitsP6EPSnumberEPS - SumAccountingVarByLaborUnits maps to projwbs.SumAccountingVarByLaborUnits
sumaccountingvariancebycostP6EPSnumberEPS - SumAccountingVarianceByCost maps to projwbs.SumAccountingVarianceByCost
sumactthisperiodmaterialcostP6EPSnumberEPS - SumActThisPeriodMaterialCost maps to projwbs.SumActThisPeriodMaterialCost
sumactthisperiodnonlaborcostP6EPSnumberEPS - SumActThisPeriodNonLaborCost maps to projwbs.SumActThisPeriodNonLaborCost
sumactthisperiodnonlaborunitsP6EPSnumberEPS - SumActThisPeriodNonLaborUnits maps to projwbs.SumActThisPeriodNonLaborUnits
sumactualthisperiodlaborcostP6EPSnumberEPS - SumActualThisPeriodLaborCost maps to projwbs.SumActualThisPeriodLaborCost
sumactualthisperiodlaborunitsP6EPSnumberEPS - SumActualThisPeriodLaborUnits maps to projwbs.SumActualThisPeriodLaborUnits
sumatcompletionmaterialcostP6EPSnumberEPS - SumAtCompletionMaterialCost maps to projwbs.SumAtCompletionMaterialCost
sumatcompletionnonlaborcostP6EPSnumberEPS - SumAtCompletionNonLaborCost maps to projwbs.SumAtCompletionNonLaborCost
sumatcompletionnonlaborunitsP6EPSnumberEPS - SumAtCompletionNonLaborUnits maps to projwbs.SumAtCompletionNonLaborUnits
sumatcompletiontotalcostvarP6EPSnumberEPS - SumAtCompletionTotalCostVar maps to projwbs.SumAtCompletionTotalCostVar
sumbaselinecompactivitycountP6EPSnumberEPS - SumBaselineCompActivityCount maps to projwbs.SumBaselineCompActivityCount
sumbaselinenotstartedactcntP6EPSnumberEPS - SumBaselineNotStartedActCnt maps to projwbs.SumBaselineNotStartedActCnt
sumblinprogressactivitycountP6EPSnumberEPS - SumBLInProgressActivityCount maps to projwbs.SumBLInProgressActivityCount
sumbudgetatcmpbylaborunitsP6EPSnumberEPS - SumBudgetAtCmpByLaborUnits maps to projwbs.SumBudgetAtCmpByLaborUnits
sumbudgetatcompletionbycostP6EPSnumberEPS - SumBudgetAtCompletionByCost maps to projwbs.SumBudgetAtCompletionByCost
sumcostperfindexbycostP6EPSnumberEPS - SumCostPerfIndexByCost maps to projwbs.SumCostPerfIndexByCost
sumcostperfindexbylaborunitsP6EPSnumberEPS - SumCostPerfIndexByLaborUnits maps to projwbs.SumCostPerfIndexByLaborUnits
sumcostvariancebylaborunitsP6EPSnumberEPS - SumCostVarianceByLaborUnits maps to projwbs.SumCostVarianceByLaborUnits
sumcostvarindexbylaborunitsP6EPSnumberEPS - SumCostVarIndexByLaborUnits maps to projwbs.SumCostVarIndexByLaborUnits
sumdurationpercentofplannedP6EPSnumberEPS - SumDurationPercentOfPlanned maps to projwbs.SumDurationPercentOfPlanned
sumeacbycostP6EPSnumberEPS - SumEACByCost maps to projwbs.SumEACByCost
sumeacbylaborunitsP6EPSnumberEPS - SumEACByLaborUnits maps to projwbs.SumEACByLaborUnits
sumeachighpctbylaborunitsP6EPSnumberEPS - SumEACHighPctByLaborUnits maps to projwbs.SumEACHighPctByLaborUnits
sumeaclowpctbylaborunitsP6EPSnumberEPS - SumEACLowPctByLaborUnits maps to projwbs.SumEACLowPctByLaborUnits
sumetcbycostP6EPSnumberEPS - SumETCByCost maps to projwbs.SumETCByCost
sumetcbylaborunitsP6EPSnumberEPS - SumETCByLaborUnits maps to projwbs.SumETCByLaborUnits
sumexpensecostpctcompleteP6EPSnumberEPS - SumExpenseCostPctComplete maps to projwbs.SumExpenseCostPctComplete
sumlaborcostpercentcompleteP6EPSnumberEPS - SumLaborCostPercentComplete maps to projwbs.SumLaborCostPercentComplete
sumlaborunitspercentcompleteP6EPSnumberEPS - SumLaborUnitsPercentComplete maps to projwbs.SumLaborUnitsPercentComplete
sumactivitycountP6EPSnumberEPS - SumActivityCount maps to projwbs.SumActivityCount
sumactualdurationP6EPSnumberEPS - SumActualDuration maps to projwbs.SumActualDuration
sumactualexpensecostP6EPSnumberEPS - SumActualExpenseCost maps to projwbs.SumActualExpenseCost
sumactualfinishdateP6EPSdateEPS - SumActualFinishDate maps to projwbs.SumActualFinishDate
sumactuallaborcostP6EPSnumberEPS - SumActualLaborCost maps to projwbs.SumActualLaborCost
sumactuallaborunitsP6EPSnumberEPS - SumActualLaborUnits maps to projwbs.SumActualLaborUnits
sumactualmaterialcostP6EPSnumberEPS - SumActualMaterialCost maps to projwbs.SumActualMaterialCost
sumactualnonlaborcostP6EPSnumberEPS - SumActualNonLaborCost maps to projwbs.SumActualNonLaborCost
sumactualnonlaborunitsP6EPSnumberEPS - SumActualNonLaborUnits maps to projwbs.SumActualNonLaborUnits
sumactualstartdateP6EPSdateEPS - SumActualStartDate maps to projwbs.SumActualStartDate
sumactualthisperiodcostP6EPSnumberEPS - SumActualThisPeriodCost maps to projwbs.SumActualThisPeriodCost
sumactualtotalcostP6EPSnumberEPS - SumActualTotalCost maps to projwbs.SumActualTotalCost
sumactualvaluebycostP6EPSnumberEPS - SumActualValueByCost maps to projwbs.SumActualValueByCost
sumactualvaluebylaborunitsP6EPSnumberEPS - SumActualValueByLaborUnits maps to projwbs.SumActualValueByLaborUnits
sumatcompletiondurationP6EPSnumberEPS - SumAtCompletionDuration maps to projwbs.SumAtCompletionDuration
sumatcompletionexpensecostP6EPSnumberEPS - SumAtCompletionExpenseCost maps to projwbs.SumAtCompletionExpenseCost
sumatcompletionlaborcostP6EPSnumberEPS - SumAtCompletionLaborCost maps to projwbs.SumAtCompletionLaborCost
sumatcompletionlaborunitsP6EPSnumberEPS - SumAtCompletionLaborUnits maps to projwbs.SumAtCompletionLaborUnits
sumatcompletiontotalcostP6EPSnumberEPS - SumAtCompletionTotalCost maps to projwbs.SumAtCompletionTotalCost
sumbaselinedurationP6EPSnumberEPS - SumBaselineDuration maps to projwbs.SumBaselineDuration
sumbaselineexpensecostP6EPSnumberEPS - SumBaselineExpenseCost maps to projwbs.SumBaselineExpenseCost
sumbaselinefinishdateP6EPSdateEPS - SumBaselineFinishDate maps to projwbs.SumBaselineFinishDate
sumbaselinelaborcostP6EPSnumberEPS - SumBaselineLaborCost maps to projwbs.SumBaselineLaborCost
sumbaselinelaborunitsP6EPSnumberEPS - SumBaselineLaborUnits maps to projwbs.SumBaselineLaborUnits
sumbaselinematerialcostP6EPSnumberEPS - SumBaselineMaterialCost maps to projwbs.SumBaselineMaterialCost
sumbaselinenonlaborcostP6EPSnumberEPS - SumBaselineNonLaborCost maps to projwbs.SumBaselineNonLaborCost
sumbaselinenonlaborunitsP6EPSnumberEPS - SumBaselineNonLaborUnits maps to projwbs.SumBaselineNonLaborUnits
sumbaselinestartdateP6EPSdateEPS - SumBaselineStartDate maps to projwbs.SumBaselineStartDate
sumbaselinetotalcostP6EPSnumberEPS - SumBaselineTotalCost maps to projwbs.SumBaselineTotalCost
sumcompletedactivitycountP6EPSnumberEPS - SumCompletedActivityCount maps to projwbs.SumCompletedActivityCount
sumcostpercentcompleteP6EPSnumberEPS - SumCostPercentComplete maps to projwbs.SumCostPercentComplete
sumcostpercentofplannedP6EPSnumberEPS - SumCostPercentOfPlanned maps to projwbs.SumCostPercentOfPlanned
sumcostvariancebycostP6EPSnumberEPS - SumCostVarianceByCost maps to projwbs.SumCostVarianceByCost
sumcostvarianceindexP6EPSnumberEPS - SumCostVarianceIndex maps to projwbs.SumCostVarianceIndex
sumcostvarianceindexbycostP6EPSnumberEPS - SumCostVarianceIndexByCost maps to projwbs.SumCostVarianceIndexByCost
sumdurationpercentcompleteP6EPSnumberEPS - SumDurationPercentComplete maps to projwbs.SumDurationPercentComplete
sumdurationvarianceP6EPSnumberEPS - SumDurationVariance maps to projwbs.SumDurationVariance
sumearnedvaluebycostP6EPSnumberEPS - SumEarnedValueByCost maps to projwbs.SumEarnedValueByCost
sumearnedvaluebylaborunitsP6EPSnumberEPS - SumEarnedValueByLaborUnits maps to projwbs.SumEarnedValueByLaborUnits
sumexpensecostvarianceP6EPSnumberEPS - SumExpenseCostVariance maps to projwbs.SumExpenseCostVariance
sumfinishdatevarianceP6EPSnumberEPS - SumFinishDateVariance maps to projwbs.SumFinishDateVariance
suminprogressactivitycountP6EPSnumberEPS - SumInProgressActivityCount maps to projwbs.SumInProgressActivityCount
sumlaborcostvarianceP6EPSnumberEPS - SumLaborCostVariance maps to projwbs.SumLaborCostVariance
sumlaborunitsvarianceP6EPSnumberEPS - SumLaborUnitsVariance maps to projwbs.SumLaborUnitsVariance
summaterialcostvarianceP6EPSnumberEPS - SumMaterialCostVariance maps to projwbs.SumMaterialCostVariance
sumnonlaborcostvarianceP6EPSnumberEPS - SumNonLaborCostVariance maps to projwbs.SumNonLaborCostVariance
sumnonlaborunitsvarianceP6EPSnumberEPS - SumNonLaborUnitsVariance maps to projwbs.SumNonLaborUnitsVariance
sumnotstartedactivitycountP6EPSnumberEPS - SumNotStartedActivityCount maps to projwbs.SumNotStartedActivityCount
sumplannedvaluebycostP6EPSnumberEPS - SumPlannedValueByCost maps to projwbs.SumPlannedValueByCost
sumprogressfinishdateP6EPSdateEPS - SumProgressFinishDate maps to projwbs.SumProgressFinishDate
sumremainingdurationP6EPSnumberEPS - SumRemainingDuration maps to projwbs.SumRemainingDuration
sumremainingexpensecostP6EPSnumberEPS - SumRemainingExpenseCost maps to projwbs.SumRemainingExpenseCost
sumremainingfinishdateP6EPSdateEPS - SumRemainingFinishDate maps to projwbs.SumRemainingFinishDate
sumremaininglaborcostP6EPSnumberEPS - SumRemainingLaborCost maps to projwbs.SumRemainingLaborCost
sumremaininglaborunitsP6EPSnumberEPS - SumRemainingLaborUnits maps to projwbs.SumRemainingLaborUnits
sumremainingmaterialcostP6EPSnumberEPS - SumRemainingMaterialCost maps to projwbs.SumRemainingMaterialCost
sumremainingnonlaborcostP6EPSnumberEPS - SumRemainingNonLaborCost maps to projwbs.SumRemainingNonLaborCost
sumremainingnonlaborunitsP6EPSnumberEPS - SumRemainingNonLaborUnits maps to projwbs.SumRemainingNonLaborUnits
sumremainingstartdateP6EPSdateEPS - SumRemainingStartDate maps to projwbs.SumRemainingStartDate
sumremainingtotalcostP6EPSnumberEPS - SumRemainingTotalCost maps to projwbs.SumRemainingTotalCost
sumschedulepercentcompleteP6EPSnumberEPS - SumSchedulePercentComplete maps to projwbs.SumSchedulePercentComplete
sumperformancepercentcompleteP6EPSnumberEPS - SumPerformancePercentComplete maps to project.SumPerformancePercentComplete
sumschedulevariancebycostP6EPSnumberEPS - SumScheduleVarianceByCost maps to projwbs.SumScheduleVarianceByCost
sumschedulevarianceindexP6EPSnumberEPS - SumScheduleVarianceIndex maps to projwbs.SumScheduleVarianceIndex
sumstartdatevarianceP6EPSnumberEPS - SumStartDateVariance maps to projwbs.SumStartDateVariance
sumtotalcostvarianceP6EPSnumberEPS - SumTotalCostVariance maps to projwbs.SumTotalCostVariance
sumtotalfloatP6EPSnumberEPS - SumTotalFloat maps to projwbs.SumTotalFloat
sumunitspercentcompleteP6EPSnumberEPS - SumUnitsPercentComplete maps to projwbs.SumUnitsPercentComplete
summaterialcostpctcompleteP6EPSnumberEPS - SumMaterialCostPctComplete maps to projwbs.SumMaterialCostPctComplete
sumnonlaborcostpctcompleteP6EPSnumberEPS - SumNonLaborCostPctComplete maps to projwbs.SumNonLaborCostPctComplete
sumnonlaborunitspctcompleteP6EPSnumberEPS - SumNonLaborUnitsPctComplete maps to projwbs.SumNonLaborUnitsPctComplete
sumperfpctcmpbylaborunitsP6EPSnumberEPS - SumPerfPctCmpByLaborUnits maps to projwbs.SumPerfPctCmpByLaborUnits
sumplannedvaluebylaborunitsP6EPSnumberEPS - SumPlannedValueByLaborUnits maps to projwbs.SumPlannedValueByLaborUnits
sumschdpctcmpbylaborunitsP6EPSnumberEPS - SumSchdPctCmpByLaborUnits maps to projwbs.SumSchdPctCmpByLaborUnits
sumschdperfindexbylaborunitsP6EPSnumberEPS - SumSchdPerfIndexByLaborUnits maps to projwbs.SumSchdPerfIndexByLaborUnits
sumschdvariancebylaborunitsP6EPSnumberEPS - SumSchdVarianceByLaborUnits maps to projwbs.SumSchdVarianceByLaborUnits
sumschdvarianceindexbycostP6EPSnumberEPS - SumSchdVarianceIndexByCost maps to projwbs.SumSchdVarianceIndexByCost
sumschdvarindexbylaborunitsP6EPSnumberEPS - SumSchdVarIndexByLaborUnits maps to projwbs.SumSchdVarIndexByLaborUnits
sumscheduleperfindexbycostP6EPSnumberEPS - SumSchedulePerfIndexByCost maps to projwbs.SumSchedulePerfIndexByCost
sumtocompleteperfindexbycostP6EPSnumberEPS - SumToCompletePerfIndexByCost maps to projwbs.SumToCompletePerfIndexByCost
sumvaratcmpbylaborunitsP6EPSnumberEPS - SumVarAtCmpByLaborUnits maps to projwbs.SumVarAtCmpByLaborUnits
TotalBenefitPlanP6EPSnumberThe sum of the monthly benefit plan.
TotalBenefitPlanTallyP6EPSnumberThe sum of the monthly benefit plan tally.
TotalFundingP6EPSnumberThe total amount of funding contributed to the project by your funding sources.
TotalSpendingPlanP6EPSnumberThe sum of the monthly spending plan.
TotalSpendingPlanTallyP6EPSnumberThe sum of the monthly spending plan tally.
UnallocatedBudgetP6EPSnumberThe total current budget minus the distributed current budget.
UndistributedCurrentVarianceP6EPSnumberThe total spending plan minus the total spending plan tally.
lastupdateuserP6EPSstringLast Update User
lastupdatedateP6EPSdateLast Update Date
createuserP6EPSstringCreate User
createdateP6EPSdateCreate Date
lastupdatedatexP6EPSdateProjwbsX Update Date
SKeyP6EPSintSKey generated key on EPS
P6EPSBUDGETCHANGELOGTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6EPSBudgetChangeLogbudgchngbudg_chng_idintegerThe unique ID generated by the system.
projectobjectidP6EPSBUDGETCHANGELOGintegerEPSBudgetChangeLog - ProjectObjectId maps to PROJWBS.proj_id
EPSObjectIdP6EPSBudgetChangeLogbudgchngwbs_idintegerThe unique ID of the EPS element to which the budget change log applies.
epsbudgetchangelogdateP6EPSBUDGETCHANGELOGdateEPSBudgetChangeLog - BudgetChangeLogDate maps to BUDGCHNG.chng_date
ChangeNumberP6EPSBudgetChangeLogbudgchngchng_short_namestringThe change number that is automatically incremented according to when changes are added. This can be changed to any number.
AmountP6EPSBudgetChangeLogbudgchngchng_costdoubleThe amount of budget change.
ResponsibleP6EPSBudgetChangeLogbudgchngchng_by_namestringThe person responsible for the change.
StatusP6EPSBudgetChangeLogbudgchngstatus_codestringThe status of this budget change request.
ReasonP6EPSBudgetChangeLogbudgchngchng_descrstringThe description of the reason for the budget change request.
EPSIdP6EPSBudgetChangeLogprojectproj_short_namestringThe short code assigned to the associated EPS.
EPSNameP6EPSBudgetChangeLogprojwbswbs_namestringThe name of the EPS element associated with this budget change log.
lastupdateuserP6EPSBUDGETCHANGELOGstringLast Update User
lastupdatedateP6EPSBUDGETCHANGELOGdateLast Update Date
createuserP6EPSBUDGETCHANGELOGstringCreate User
createdateP6EPSBUDGETCHANGELOGdateCreate Date
SKeyP6EPSBUDGETCHANGELOGintSKey generated key on EPSBudgetChangeLog
P6EPSFUNDINGTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6EPSFundingprojfundproj_fund_idintegerThe unique ID generated by the system.
FundingSourceObjectIdP6EPSFundingprojfundfund_idintegerThe unique ID of the associated funding source for this EPS funding.
projectobjectidP6EPSFUNDINGintegerEPSFunding - ProjectObjectId maps to PROJWBS.proj_id
AmountP6EPSFundingprojfundfund_costdoubleThe amount of a funding source that is allocated to the EPS.
FundShareP6EPSFundingprojfundfund_wtdoubleThe percentage of the total fund that is allocated to the EPS.
EPSIdP6EPSFundingprojectproj_short_namestringThe short code assigned to the associated EPS.
EPSNameP6EPSFundingprojwbswbs_namestringThe name of the EPS element associated with this funding.
EPSObjectIdP6EPSFundingprojwbswbs_idintegerThe unique ID of the associated EPS for this EPS funding.
lastupdateuserP6EPSFUNDINGstringLast Update User
lastupdatedateP6EPSFUNDINGdateLast Update Date
createuserP6EPSFUNDINGstringCreate User
createdateP6EPSFUNDINGdateCreate Date
SKeyP6EPSFUNDINGintSKey generated key on EPSFunding
P6EPSHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ParentObjectIdP6EPSHIERARCHYinteger
ParentProjectIdP6EPSHIERARCHYinteger
ParentSequenceNumberP6EPSHIERARCHYinteger
ParentNameP6EPSHIERARCHYstring
ParentIdP6EPSHIERARCHYstring
ChildObjectIdP6EPSHIERARCHYinteger
ChildProjectIdP6EPSHIERARCHYinteger
ChildSequenceNumberP6EPSHIERARCHYinteger
ChildNameP6EPSHIERARCHYstring
ChildIdP6EPSHIERARCHYstring
ParentLevelsBelowRootP6EPSHIERARCHYinteger
ChildLevelsBelowRootP6EPSHIERARCHYinteger
LevelsBetweenP6EPSHIERARCHYinteger
ChildHasChildrenP6EPSHIERARCHYstring
FullPathNameP6EPSHIERARCHYstring
lastupdatedateP6EPSHIERARCHYdateLast Update Date
SKeyP6EPSHIERARCHYint
P6WBSHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ParentObjectIdP6WBSHIERARCHYinteger
ParentProjectIdP6WBSHIERARCHYinteger
ParentSequenceNumberP6WBSHIERARCHYinteger
ParentNameP6WBSHIERARCHYstring
ParentIdP6WBSHIERARCHYstring
ChildObjectIdP6WBSHIERARCHYinteger
ChildProjectIdP6WBSHIERARCHYinteger
ChildSequenceNumberP6WBSHIERARCHYinteger
ChildNameP6WBSHIERARCHYstring
ChildIdP6WBSHIERARCHYstring
ParentLevelsBelowRootP6WBSHIERARCHYinteger
ChildLevelsBelowRootP6WBSHIERARCHYinteger
LevelsBetweenP6WBSHIERARCHYinteger
ChildHasChildrenP6WBSHIERARCHYstring
FullPathNameP6WBSHIERARCHYstring
lastupdatedateP6WBSHIERARCHYdateLast Update Date
SKeyP6WBSHIERARCHYint
P6EPSNOTETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6EPSNotewbsmemowbs_memo_idintegerThe unique ID generated by the system.
projectobjectidP6EPSNOTEintegerEPSNote - ProjectObjectId maps to PROJWBS.proj_id
NotebookTopicObjectIdP6EPSNotewbsmemomemo_type_idintegerThe unique ID of the associated notebook topic.
NoteP6EPSNotewbsmemowbs_memoclobThe information that is associated with the notebook topic.
EPSIdP6EPSNoteprojectproj_short_namestringThe short code assigned to the associated EPS.
EPSNameP6EPSNoteprojwbswbs_namestringThe name of the EPS element associated with this note.
EPSObjectIdP6EPSNotewbsmemowbs_idintegerThe unique ID of the associated EPS.
NotebookTopicNameP6EPSNotememotypememo_typestringThe name of the associated notebook topic.
RawTextNoteP6EPSNoteclobThe information that is associated with the notebook topic, without any HTML.
lastupdateuserP6EPSNOTEstringLast Update User
lastupdatedateP6EPSNOTEdateLast Update Date
createuserP6EPSNOTEstringCreate User
createdateP6EPSNOTEdateCreate Date
SKeyP6EPSNOTEintSKey generated key on EPSNote
P6EPSSPENDINGPLANTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6EPSSpendingPlanwbsbudgwbs_budg_idintegerThe unique ID generated by the system.
projectobjectidP6EPSSPENDINGPLANintegerEPSSpendingPlan - ProjectObjectId maps to PROJWBS.proj_id
SpendingPlanP6EPSSpendingPlanwbsbudgspend_costdoubleThe editable total monthly expenditure for the EPS.
BenefitPlanP6EPSSpendingPlanwbsbudgbenefit_costdoubleThe editable monthly profit portion for each month for the EPS.
spendingplandateP6EPSSPENDINGPLANdateEPSSpendingPlan - SpendingPlanDate maps to wbsbudg.wbsbudgDate
EPSIdP6EPSSpendingPlanprojectproj_short_namestringThe short code assigned to the associated EPS.
EPSNameP6EPSSpendingPlanprojwbswbs_namestringThe name of the EPS element associated with this spending plan.
EPSObjectIdP6EPSSpendingPlanwbsbudgwbs_idintegerThe unique ID of the associated EPS for this EPS spending plan.
lastupdateuserP6EPSSPENDINGPLANstringLast Update User
lastupdatedateP6EPSSPENDINGPLANdateLast Update Date
createuserP6EPSSPENDINGPLANstringCreate User
createdateP6EPSSPENDINGPLANdateCreate Date
SKeyP6EPSSPENDINGPLANintSKey generated key on EPSSpendingPlan
P6EPSSPREADTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6EPSSPREADinteger
IdP6EPSSPREADstring
NameP6EPSSPREADstring
ParentObjectIdP6EPSSPREADinteger
projectobjectidP6EPSSPREADinteger
ObsObjectIdP6EPSSPREADinteger
ObsNameP6EPSSPREADstring
StartDateP6EPSSPREADdate
EndDateP6EPSSPREADdate
ActualLaborUnitsP6EPSSPREADdouble
ActualNonlaborUnitsP6EPSSPREADdouble
AtCompletionLaborUnitsP6EPSSPREADdouble
AtCompletionNonlaborUnitsP6EPSSPREADdouble
BaselinePlannedLaborUnitsP6EPSSPREADdouble
BaselinePlannedNonlaborUnitsP6EPSSPREADdouble
EarnedValueLaborUnitsP6EPSSPREADdouble
EstimateAtCompletionLaborUnitsP6EPSSPREADdouble
EstimateToCompleteLaborUnitsP6EPSSPREADdouble
PlannedValueLaborUnitsP6EPSSPREADdouble
RemainingLaborUnitsP6EPSSPREADdouble
RemainingNonlaborUnitsP6EPSSPREADdouble
ActualCostP6EPSSPREADdouble
ActualExpenseCostP6EPSSPREADdouble
ActualLaborCostP6EPSSPREADdouble
ActualMaterialCostP6EPSSPREADdouble
ActualNonlaborCostP6EPSSPREADdouble
ActualTotalCostP6EPSSPREADdouble
AtCompletionExpenseCostP6EPSSPREADdouble
AtCompletionLaborCostP6EPSSPREADdouble
AtCompletionMaterialCostP6EPSSPREADdouble
AtCompletionNonlaborCostP6EPSSPREADdouble
AtCompletionTotalCostP6EPSSPREADdouble
BaselinePlannedExpenseCostP6EPSSPREADdouble
BaselinePlannedLaborCostP6EPSSPREADdouble
BaselinePlannedMaterialCostP6EPSSPREADdouble
BaselinePlannedNonlaborCostP6EPSSPREADdouble
BaselinePlannedTotalCostP6EPSSPREADdouble
EarnedValueCostP6EPSSPREADdouble
EstimateAtCompletionCostP6EPSSPREADdouble
EstimateToCompleteCostP6EPSSPREADdouble
PlannedValueCostP6EPSSPREADdouble
RemainingExpenseCostP6EPSSPREADdouble
RemainingLaborCostP6EPSSPREADdouble
RemainingMaterialCostP6EPSSPREADdouble
RemainingNonlaborCostP6EPSSPREADdouble
RemainingTotalCostP6EPSSPREADdouble
SKeyP6EPSSPREADnumber
P6EXPENSECATEGORYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ExpenseCategorycosttypecost_type_idintegerThe unique ID generated by the system.
SequenceNumberP6ExpenseCategorycosttypeseq_numintegerThe sequence number for sorting.
NameP6ExpenseCategorycosttypecost_typestringThe name of the expense category.
lastupdateuserP6EXPENSECATEGORYstringLast Update User
lastupdatedateP6EXPENSECATEGORYdateLast Update Date
createuserP6EXPENSECATEGORYstringCreate User
createdateP6EXPENSECATEGORYdateCreate Date
SKeyP6EXPENSECATEGORYintSKey generated key on ExpenseCategory
P6FINANCIALPERIODTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6FinancialPeriodfindatesfin_dates_idintegerThe unique ID generated by the system.
NameP6FinancialPeriodfindatesfin_dates_namestringThe name of the financial period.
StartDateP6FinancialPeriodfindatesstart_datedateThe start date of the period
EndDateP6FinancialPeriodfindatesend_datedateThe end date of the period
lastupdateuserP6FINANCIALPERIODstringLast Update User
lastupdatedateP6FINANCIALPERIODdateLast Update Date
createuserP6FINANCIALPERIODstringCreate User
createdateP6FINANCIALPERIODdateCreate Date
SKeyP6FINANCIALPERIODintSKey generated key on FinancialPeriod
P6FUNDINGSOURCETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6FundingSourcefundsrcfund_idintegerThe unique ID generated by the system.
SequenceNumberP6FundingSourcefundsrcseq_numintegerThe sequence number for sorting.
NameP6FundingSourcefundsrcfund_namestringThe name of the funding source.
ParentObjectIdP6FundingSourcefundsrcparent_fund_idintegerThe unique ID of the parent funding source of this funding source in the hierarchy.
DescriptionP6FundingSourcefundsrcfund_descrclobThe description of the funding source.
lastupdateuserP6FUNDINGSOURCEstringLast Update User
lastupdatedateP6FUNDINGSOURCEdateLast Update Date
createuserP6FUNDINGSOURCEstringCreate User
createdateP6FUNDINGSOURCEdateCreate Date
SKeyP6FUNDINGSOURCEintSKey generated key on FundingSource
P6GLOBALPROFILETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6GlobalProfileprofileprof_idintegerThe unique ID generated by the system.
IsDefaultP6GlobalProfileprofiledefault_flagstringThe flag that indicates this security profile is assigned to new users by default. When a GlobalProfile object is deleted from the database, all users assigned to that profile are reassigned to the default profile. You cannot not delete the default profile.
IsSuperUserP6GlobalProfileprofilesuperuser_flagstringThe flag that identifies the superuser profile. Superuser profiles are automatically granted all privileges.
NameP6GlobalProfileprofileprof_namestringthe privileges that are turned on.
lastupdateuserP6GLOBALPROFILEstringLast Update User
lastupdatedateP6GLOBALPROFILEdateLast Update Date
createuserP6GLOBALPROFILEstringCreate User
createdateP6GLOBALPROFILEdateCreate Date
SKeyP6GLOBALPROFILEintSKey generated key on GlobalProfile
P6GLOBALSECURITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RDBMSUSERIDP6GLOBALSECURITYinteger
SECURECODEFLAGP6GLOBALSECURITYstring
RESOURCECOSTFLAGP6GLOBALSECURITYstring
PROFICIENCYFLAGP6GLOBALSECURITYstring
AUDITDATAFLAGP6GLOBALSECURITYstring
P6ISSUEHISTORYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ProjectIssueObjectIdP6IssueHistoryissuhistissue_idintegerThe unique ID of the associated project issue for this issue history.
ProjectObjectIdP6IssueHistoryissuhistproj_idintegerThe unique ID of the associated project for this issue history.
NotesP6IssueHistoryissuhistissue_historyclobThe notes associated with the issue history.
IsBaselineP6IssueHistorystringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6IssueHistorystringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6ISSUEHISTORYstringLast Update User
lastupdatedateP6ISSUEHISTORYdateLast Update Date
createuserP6ISSUEHISTORYstringCreate User
createdateP6ISSUEHISTORYdateCreate Date
SKeyP6ISSUEHISTORYintSKey generated key on IssueHistory
P6ITERATIONTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6ITERATIONintegerITERATION primary key maps to ITERATION.iteration_id
nameP6ITERATIONstringITERATION - name maps to ITERATION.ITERATION_name
startdateP6ITERATIONdateITERATION - startdate maps to ITERATION.start_date
enddateP6ITERATIONdateITERATION - enddate maps to ITERATION.end_date
lastupdateuserP6ITERATIONstringLast Update User
lastupdatedateP6ITERATIONdateLast Update Date
createuserP6ITERATIONstringCreate User
createdateP6ITERATIONdateCreate Date
P6ITERATIONACTIVITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
iterationobjectidP6ITERATIONACTIVITYintegerITERTASK primary key maps to ITERTASK.iteration_id
activityobjectidP6ITERATIONACTIVITYintegerITERTASK primary key maps to ITERTASK.task_id
lastupdateuserP6ITERATIONACTIVITYstringLast Update User
lastupdatedateP6ITERATIONACTIVITYdateLast Update Date
createuserP6ITERATIONACTIVITYstringCreate User
createdateP6ITERATIONACTIVITYdateCreate Date
P6ITERATIONTEAMTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
iterationobjectidP6ITERATIONTEAMintegerITERTEAM primary key maps to ITERTEAM.iteration_id
resourceteamobjectidP6ITERATIONTEAMintegerITERTEAM primary key maps to ITERTEAM.rfolio_id
lastupdateuserP6ITERATIONTEAMstringLast Update User
lastupdatedateP6ITERATIONTEAMdateLast Update Date
createuserP6ITERATIONTEAMstringCreate User
createdateP6ITERATIONTEAMdateCreate Date
P6LOCATIONTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Locationlocationlocation_idintegerThe unique ID of the location.
locationnameP6LOCATIONstringLOCATION - name maps to LOCATION.location_name
locationtypeP6LOCATIONstringLOCATION - type maps to LOCATION.location_type
AddressLine1P6LocationLOCATIONstringThe first line of the address with street number and street name.
AddressLine2P6LocationLOCATIONstringThe second line of the address with street number and street name.
addressline3P6LOCATIONstringLOCATION - address3 maps to LOCATION.address_line3
CityP6Locationlocationcity_namestringThe city name of the address.
MunicipalityP6Locationlocationmunicipality_namestringThe municipality name of the address.
StateP6Locationlocationstate_namestringThe state name of the address.
StateCodeP6Locationlocationstate_codestringThe state abbreviation of the address.
CountryP6Locationlocationcountry_namestringThe country of the address.
CountryCodeP6Locationlocationcountry_codestringThe country code of the address.
PostalCodeP6Locationlocationpostal_codestringThe postal code of the address.
LongitudeP6LocationlocationlongitudenumberThe longitude of the location.
LatitudeP6LocationlocationlatitudenumberThe latitude of the location.
geolocationP6LOCATIONgeometryLOCATION - geolocation maps to LOCATION.geo_location
lastupdateuserP6LOCATIONstringLast Update User
lastupdatedateP6LOCATIONdateLast Update Date
createuserP6LOCATIONstringCreate User
createdateP6LOCATIONdateCreate Date
P6NOTEBOOKTOPICTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6NotebookTopicmemotypememo_type_idintegerThe unique ID generated by the system.
SequenceNumberP6NotebookTopicmemotypeseq_numintegerThe sequence number for sorting.
AvailableForEPSP6NotebookTopicmemotypeeps_flagstringThe flag indicating that the topic will be available to assign to EPS.
AvailableForProjectP6NotebookTopicmemotypeproj_flagstringThe flag indicating that the topic will be available to assign to projects.
AvailableForWBSP6NotebookTopicmemotypewbs_flagstringThe flag indicating that the topic will be available to assign to WBS.
AvailableForActivityP6NotebookTopicmemotypetask_flagstringThe flag indicating that the topic will be available to assign to activities.
NameP6NotebookTopicmemotypememo_typestringThe name of the notebook topic.
lastupdateuserP6NOTEBOOKTOPICstringLast Update User
lastupdatedateP6NOTEBOOKTOPICdateLast Update Date
createuserP6NOTEBOOKTOPICstringCreate User
createdateP6NOTEBOOKTOPICdateCreate Date
SKeyP6NOTEBOOKTOPICintSKey generated key on NotebookTopic
P6OBSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6OBSobsobs_idintegerThe unique ID generated by the system.
SequenceNumberP6OBSobsseq_numintegerThe sequence number for sorting.
NameP6OBSobsobs_namestringThe name of the person/role in the organization, sometimes referred to elsewhere as the "responsible manager".
ParentObjectIdP6OBSobsparent_obs_idintegerThe unique ID of the parent OBS of this OBS in the hierarchy.
DescriptionP6OBSobsobs_descrclobThe description of the person/role in the organization.
lastupdateuserP6OBSstringLast Update User
lastupdatedateP6OBSdateLast Update Date
createuserP6OBSstringCreate User
createdateP6OBSdateCreate Date
SKeyP6OBSintSKey generated key on OBS
P6OVERHEADCODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6OverheadCodenonworknonwork_type_idintegerThe unique ID generated by the system.
SequenceNumberP6OverheadCodenonworkseq_numintegerThe sequence number for sorting.
NameP6OverheadCodenonworknonwork_codestringThe name of the overhead code.
DescriptionP6OverheadCodenonworknonwork_typestringThe description of the overhead code.
lastupdateuserP6OVERHEADCODEstringLast Update User
lastupdatedateP6OVERHEADCODEdateLast Update Date
createuserP6OVERHEADCODEstringCreate User
createdateP6OVERHEADCODEdateCreate Date
SKeyP6OVERHEADCODEintSKey generated key on OverheadCode
P6PROJECTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Projectprojwbsproj_idintegerThe unique ID generated by the system.
IdP6Projectprojectproj_short_namestringThe short code assigned to each Project element for identification. Each Project element is uniquely identified by this short code.
FiscalYearStartMonthP6Projectprojectfy_start_month_numintegerThe month that marks the beginning of the fiscal year for the project.
resourcescaneditasgnmtpctcmpP6PROJECTstringProject - ResourcesCanEditAsgnmtPctCmp maps to PROJECT.chng_eff_cmp_pct_flag
resourcescanselfassigntoactsP6PROJECTstringProject - ResourcesCanSelfAssignToActs maps to PROJECT.rsrc_self_add_flag
primaryrescanmarkactsascmpP6PROJECTstringProject - PrimaryResCanMarkActsAsCmp maps to PROJECT.allow_complete_flag
resourcecanassigntosameactP6PROJECTstringProject - ResourceCanAssignToSameAct maps to PROJECT.rsrc_multi_assign_flag
CheckOutStatusP6Projectprojectcheckout_flagstringThe flag that indicates that the project is currently checked out to an external file or database and is being managed remotely.
activitypctcmpbasedonstepsP6PROJECTstringProject - ActivityPctCmpBasedOnSteps maps to PROJECT.step_complete_flag
CostQuantityRecalculateFlagP6Projectprojectcost_qty_recalc_flagstringThe flag that, when costs and quantities are linked, indicates whether the quantities should be updated when costs are updated,
containssummarydataonlyP6PROJECTstringProject - ContainsSummaryDataOnly maps to PROJECT.sum_only_flag
EnableSummarizationP6Projectprojectbatch_sum_flagstringThe option which, when true, directs the Summarizer service to automatically summarize the project. If this is false, the project will be skipped during the summary run.
WBSCodeSeparatorP6Projectprojectname_sep_charstringThe character used to separate the concatenated code fields for the project's WBS tree.
activitydefaultpctcmptypeP6PROJECTstringProject - ActivityDefaultPctCmpType maps to PROJECT.def_complete_pct_type
activitydefcostacctobjectidP6PROJECTintegerProject - ActivityDefCostAcctObjectId maps to PROJECT.acct_id
activitydefcalendarobjectidP6PROJECTintegerProject - ActivityDefCalendarObjectId maps to PROJECT.clndr_id
CurrentBaselineProjectObjectIdP6Projectprojectsum_base_proj_idintegerThe unique ID of the project's baseline to use for computing summaries.
ActivityIdSuffixP6Projectprojecttask_code_baseintegerThe suffix used for auto-numbering of activity IDs. When a new activity is created, the activity ID is automatically generated using auto-numbering. Activity ID auto-numbering concatenates the prefix and the suffix, with the suffix incremented to make the code unique. Example: 'A', '1000', '10' yields activity IDs of 'A1010', 'A1020', 'A1030', etc.
ActivityIdIncrementP6Projectprojecttask_code_stepintegerThe increment used for auto-numbering of activity IDs. When a new activity is created, the activity ID is automatically generated using auto-numbering. Activity ID auto-numbering concatenates the prefix and the suffix, with the suffix incremented to make the code unique. Example: 'A', '1000', '10' yields activity IDs of 'A1010', 'A1020', 'A1030', etc.
LevelingPriorityP6Projectprojectpriority_numintegerThe priority for scheduling.
SummarizeToWBSLevelP6Projectprojectwbs_max_sum_levelintegerThe maximum level within the project's WBS to perform summarization - default to 2.
StrategicPriorityP6Projectprojectstrgy_priority_numintegerThe project's priority. The range is from 1 to 10,000.
CriticalActivityFloatLimitP6Projectprojectcritical_drtn_hr_cntdoubleThe duration used to determine if an activity is critical. When an activity has total float that is less than or equal to this duration, the activity is marked as critical.
ActivityDefaultPricePerUnitP6Projectprojectdef_cost_per_qtydoubleThe price used to estimate resource costs for activities that have planned, actual, or remaining units, but no resource assignments. This price is also used to compute costs for activities in cases where resources are assigned but the resources have no prices. Resource cost is computed as the resource units multiplied by the price per time.
PlannedStartDateP6Projectprojectplan_start_datedateThe planned start date of the project. Used by the project scheduler.
MustFinishByDateP6Projectprojectplan_end_datedateThe date by which all project activities must finish. If entered, it is used as the project late finish date by the project scheduler.
ScheduledFinishDateP6Projectprojectscd_end_datedateThe early finish date of the latest activity in the project, as computed by the project scheduler.
DateAddedP6Projectprojectadd_datedateThe date on which the project was added to the Project Management database.
SummarizedDataDateP6Projectprojectsum_data_datedateThe data date of the project when it was last summarized-only updated by summarizer.
LastSummarizedDateP6Projectprojectlast_tasksum_datedateThe date the project was last summarized.
ProjectForecastStartDateP6Projectprojectfcst_start_datedateThe alternate start date to be optionally used by the scheduler. The user sets the alternate start date by dragging the project bar in the Gantt Chart around while manually leveling the resource profile in a resource analysis layout.
ActivityDefaultDurationTypeP6Projectprojectdef_duration_typestringThe duration type assigned to new activities by default. Valid values are 'Fixed Units/Time', 'Fixed Duration and Units/Time', 'Fixed Units', or 'Fixed Duration and Units'.
ActivityIdPrefixP6Projectprojecttask_code_prefixstringThe prefix used for auto-numbering of activity IDs. When a new activity is created, the activity ID is automatically generated using auto-numbering. Activity ID auto-numbering concatenates the prefix and the suffix, with the suffix incremented to make the code unique. Example: 'A', '1000', '10' yields activity IDs of 'A1010', 'A1020', 'A1030', etc.
DefaultPriceTimeUnitsP6Projectprojectdef_qty_typestringThe time units associated with the project's default price per time. Valid values are 'Hour', 'Day', 'Week', 'Month', and 'Year'.
AddedByP6Projectprojectadd_by_namestringThe name of the user who added the project to the database.
WebSiteRootDirectoryP6Projectprojectweb_local_root_pathstringThe root directory for storing project Web site files before they are published to the Web server.
WebSiteURLP6Projectprojectproj_urlstringThe project Web site URL, which is the Web address of the project's website.
AssignmentDefaultRateTypeP6Projectprojectdef_rate_typestringThe default rate type when adding resource assignments to a project. Valid values are 'Price / Unit', 'Price / Unit2', 'Price / Unit3', 'Price / Unit4', and 'Price / Unit5'.
LinkActualToActualThisPeriodP6Projectprojectact_this_per_link_flagstringThe flag that indicates whether actual units and costs are linked to actual-this-period units and costs. Setting this field to true asynchronously causes all actual-this-period values to be recalculated for the project via a job service. Default = 'true'.
ActivityDefaultActivityTypeP6Projectprojectdef_task_typestringThe default type for activities. Possible values are 'Task Dependent', 'Resource Dependent', 'Level of Effort', or 'Milestone'. A 'Task Dependent' activity is scheduled using the activity's calendar rather than the calendars of the assigned resources. A 'Resource Dependent' activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A 'Milestone' is a zero-duration activity without resources, marking a significant project event. A 'Level of Effort' activity has a duration that is determined by its dependent activities. Administration-type activities are typically 'Level of Effort'.
LinkPercentCompleteWithActualP6Projectprojectact_pct_link_flagstringThe flag that indicates whether actual units and cost should be recalculated when percent complete changes. Default = 'false'
AddActualToRemainingP6Projectprojectadd_act_remain_flagstringThe flag that indicates whether to add actual to remaining or to subtract actual from at complete when actual units and costs are updated. Default = 'true'
CriticalActivityPathTypeP6Projectprojectcritical_path_typestringThe critical path type, which indicates how critical path activities are identified for the project, based on either 'Critical Float' or 'Longest Path'.
activityidbasedonselactivityP6PROJECTstringProject - ActivityIdBasedOnSelActivity maps to PROJECT.task_code_prefix_flag
AssignmentDefaultDrivingFlagP6Projectprojectdef_rollup_dates_flagstringThe default flag assigned to new assignments, to indicate whether assignments will drive activity dates.
LinkPlannedAndAtCompletionFlagP6Projectprojectrem_target_link_flagstringThe flag that indicates whether the At Completion Cost/Units should be linked to Planned Cost/Units for not-started activities. Default = 'true'
ResetPlannedToRemainingFlagP6Projectprojectreset_planned_flagstringThe flag that indicates whether to reset Planned Duration and Units to Remaining Duration and Units, or to reset Remaining Duration and Units to Planned Duration and Units when the Activity Status is or becomes not started. Default = 'true'
AllowNegativeActualUnitsFlagP6Projectprojectallow_neg_act_flagstringThe flag that indicates whether the project can allow the negative valus for the actual units.
OwnerResourceObjectIdP6Projectprojectrsrc_idintegerThe unique ID of the Owner Resource of this project.
CheckOutDateP6Projectprojectcheckout_datedateThe date on which the project was checked out of the Project Management database.
CheckOutUserObjectIdP6Projectprojectcheckout_user_idintegerThe unique ID of the User that checked out this project.
LastFinancialPeriodObjectIdP6Projectprojectlast_fin_dates_idintegerThe unique ID of the last closed financial period for the project.
useprojectblforearnedvalueP6PROJECTstringProject - UseProjectBLForEarnedValue maps to PROJECT.use_project_baseline_flag
AnnualDiscountRateP6Projectprojwbsann_dscnt_rate_pctnumberThe user-defined number field that identifies the discount rate for the project.
AnticipatedFinishDateP6Projectprojwbsanticip_end_datedateThe anticipated finish date of Project element. User-entered - not dependent upon any other fields. If there are no children, the anticipated finish date will be the finish date displayed in the columns.
AnticipatedStartDateP6Projectprojwbsanticip_start_datedateThe anticipated start date of Project element. User-entered - not dependent upon any other fields. If there are no children, the anticipated start date will be the start date displayed in the columns.
ContainsSummaryDataP6Projectprojwbssum_data_flagstringThe flag that indicates that the Project has been summarized.
CurrentBudgetP6ProjectnumberThe sum of the original budget plus the approved and pending budgets from the budget change log.
CurrentVarianceP6ProjectnumberThe difference between the current budget and the total spending plan. Calculated as current budget - total spending plan. Not rolled up
DataDateP6ProjectdateThe current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied.
DiscountApplicationPeriodP6Projectprojwbsdscnt_period_typestringthe timescale for entering ROI spending and benefit plan. Valid values are 'Month', 'Quarter', or 'Year'.
DistributedCurrentBudgetP6ProjectnumberThe current budget values from one level lower.
EarnedValueComputeTypeP6Projectprojwbsev_compute_typestringThe technique used for computing earned-value percent complete for activities within the Project. Valid values are 'Activity Percent Complete', '0 / 100', '50 / 50', 'Custom Percent Complete', 'WBS Milestones Percent Complete', and 'Activity Percent Complete Using Resource Curves'.
EarnedValueETCComputeTypeP6Projectprojwbsev_etc_compute_typestringThe technique for computing earned-value estimate-to-complete for activities within the Project. Valid values are 'ETC = Remaining Cost for Activity', 'Performance Factor = 1', 'Performance Factor = Custom Value', 'Performance Factor = 1 / Cost Performance Index', and 'Performance Factor = 1 / (Cost Performance Index * Schedule Performance Index)'.
EarnedValueETCUserValueP6Projectprojwbsev_etc_user_valuenumberThe user-defined performance factor, PF, for computing earned-value estimate-to-complete. ETC is computed as PF * (BAC - earned value).
EarnedValueUserPercentP6Projectprojwbsev_user_pctnumberThe user-defined percent complete for computing earned value for activities within the Project. A value of, say, 25 means that 25% of the planned amount is earned when the activity is started and the remainder is earned when the activity is completed.
FinishDateP6ProjectdateThe finish date of the project. This is a summary method calculated from fields populated by the Summarizer job service.
ForecastFinishDateP6ProjectdateThe alternate end date to be optionally used by the scheduler. The user sets the alternate end date by dragging the project bar in the Gantt Chart while manually leveling the resource profile in a resource analysis layout.
ForecastStartDateP6ProjectdateThe alternate start date to be optionally used by the scheduler. The user sets the alternate start date by dragging the project bar in the Gantt Chart around while manually leveling the resource profile in a resource analysis layout.
IndependentETCLaborUnitsP6Projectprojwbsindep_remain_work_qtynumberThe user-entered ETC total labor.
IndependentETCTotalCostP6Projectprojwbsindep_remain_total_costnumberThe user-entered ETC total cost.
NameP6Projectprojwbswbs_namestringThe name of the Project element.
OBSNameP6Projectobsobs_namestringThe name of the person/role in the organization, sometimes referred to as the "responsible manager".
OBSObjectIdP6Projectprojwbsobs_idintegerThe unique ID of the project manager from the project's OBS tree who is responsible for the Project.
OriginalBudgetP6Projectprojwbsorig_costnumberThe original budget for the project.
OverallProjectScoreP6ProjectnumberThe project score calculated based on all project code types assigned to this project.
ParentEPSObjectIdP6Projectprojwbsparent_wbs_idintegerThe unique ID of the parent EPS of this project.
ProposedBudgetP6ProjectnumberThe Proposed Budget, which is the sum of the original budget plus the approved and pending budgets from the budget change log.
RiskLevelP6ProjectstringThe risk level assigned to the project: 'Very High', 'High', 'Medium', 'Low', and 'Very Low'.
RiskScoreP6ProjectintegerThe calculated risk score for the project.
RiskExposureP6ProjectnumberThe calculated exposure value for the project.
StartDateP6ProjectdateThe start date of the project. This is a summary method calculated from fields populated by the Summarizer job service.
StatusP6Projectprojwbsstatus_codestringThe project status: 'Planned', 'Active', 'Inactive', 'What-If', 'Requested', or 'Template'.
originalprojectobjectidP6PROJECTintegerProject - OriginalProjectObjectId maps to project.OriginalProjectObjectId
riskscorematrixobjectidP6PROJECTintegerProject - RiskMatrixObjectId maps to project.RiskScoreMatrixObjectId
isbaselineP6PROJECTstringProject - IsBaseline maps to PROJECT.IsBaseline
IsTemplateP6ProjectstringThe boolean value indicating if this Project is a template Project.
sumplannedstartdateP6PROJECTdateProject - SumPlannedStartDate maps to project.SumPlannedStartDate
sumplannedfinishdateP6PROJECTdateProject - SumPlannedFinishDate maps to project.SumPlannedFinishDate
sumplanneddurationP6PROJECTnumberProject - SumPlannedDuration maps to project.SumPlannedDuration
sumplannedlaborunitsP6PROJECTnumberProject - SumPlannedLaborUnits maps to project.SumPlannedLaborUnits
sumplannednonlaborunitsP6PROJECTnumberProject - SumPlannedNonLaborUnits maps to project.SumPlannedNonLaborUnits
sumplannedexpensecostP6PROJECTnumberProject - SumPlannedExpenseCost maps to project.SumPlannedExpenseCost
sumplannedlaborcostP6PROJECTnumberProject - SumPlannedLaborCost maps to project.SumPlannedLaborCost
sumplannedmaterialcostP6PROJECTnumberProject - SumPlannedMaterialCost maps to project.SumPlannedMaterialCost
sumplannednonlaborcostP6PROJECTnumberProject - SumPlannedNonLaborCost maps to project.SumPlannedNonLaborCost
sumplannedtotalcostP6PROJECTnumberProject - SumPlannedTotalCost maps to project.SumPlannedTotalCost
sumaccountingvarbylaborunitsP6PROJECTnumberProject - SumAccountingVarByLaborUnits maps to project.SumAccountingVarByLaborUnits
sumaccountingvariancebycostP6PROJECTnumberProject - SumAccountingVarianceByCost maps to project.SumAccountingVarianceByCost
sumactthisperiodmaterialcostP6PROJECTnumberProject - SumActThisPeriodMaterialCost maps to project.SumActThisPeriodMaterialCost
sumactthisperiodnonlaborcostP6PROJECTnumberProject - SumActThisPeriodNonLaborCost maps to project.SumActThisPeriodNonLaborCost
sumactthisperiodnonlaborunitsP6PROJECTnumberProject - SumActThisPeriodNonLaborUnits maps to project.SumActThisPeriodNonLaborUnits
sumactualthisperiodlaborcostP6PROJECTnumberProject - SumActualThisPeriodLaborCost maps to project.SumActualThisPeriodLaborCost
sumactualthisperiodlaborunitsP6PROJECTnumberProject - SumActualThisPeriodLaborUnits maps to project.SumActualThisPeriodLaborUnits
sumatcompletionmaterialcostP6PROJECTnumberProject - SumAtCompletionMaterialCost maps to project.SumAtCompletionMaterialCost
sumatcompletionnonlaborcostP6PROJECTnumberProject - SumAtCompletionNonLaborCost maps to project.SumAtCompletionNonLaborCost
sumatcompletionnonlaborunitsP6PROJECTnumberProject - SumAtCompletionNonLaborUnits maps to project.SumAtCompletionNonLaborUnits
sumatcompletiontotalcostvarP6PROJECTnumberProject - SumAtCompletionTotalCostVar maps to project.SumAtCompletionTotalCostVar
sumbaselinecompactivitycountP6PROJECTnumberProject - SumBaselineCompActivityCount maps to project.SumBaselineCompActivityCount
sumbaselinenotstartedactcntP6PROJECTnumberProject - SumBaselineNotStartedActCnt maps to project.SumBaselineNotStartedActCnt
sumblinprogressactivitycountP6PROJECTnumberProject - SumBLInProgressActivityCount maps to project.SumBLInProgressActivityCount
sumbudgetatcmpbylaborunitsP6PROJECTnumberProject - SumBudgetAtCmpByLaborUnits maps to project.SumBudgetAtCmpByLaborUnits
sumbudgetatcompletionbycostP6PROJECTnumberProject - SumBudgetAtCompletionByCost maps to project.SumBudgetAtCompletionByCost
sumcostperfindexbycostP6PROJECTnumberProject - SumCostPerfIndexByCost maps to project.SumCostPerfIndexByCost
sumcostperfindexbylaborunitsP6PROJECTnumberProject - SumCostPerfIndexByLaborUnits maps to project.SumCostPerfIndexByLaborUnits
sumcostvariancebylaborunitsP6PROJECTnumberProject - SumCostVarianceByLaborUnits maps to project.SumCostVarianceByLaborUnits
sumcostvarindexbylaborunitsP6PROJECTnumberProject - SumCostVarIndexByLaborUnits maps to project.SumCostVarIndexByLaborUnits
sumdurationpercentofplannedP6PROJECTnumberProject - SumDurationPercentOfPlanned maps to project.SumDurationPercentOfPlanned
sumeacbycostP6PROJECTnumberProject - SumEACByCost maps to project.SumEACByCost
sumeacbylaborunitsP6PROJECTnumberProject - SumEACByLaborUnits maps to project.SumEACByLaborUnits
sumeachighpctbylaborunitsP6PROJECTnumberProject - SumEACHighPctByLaborUnits maps to project.SumEACHighPctByLaborUnits
sumeaclowpctbylaborunitsP6PROJECTnumberProject - SumEACLowPctByLaborUnits maps to project.SumEACLowPctByLaborUnits
sumetcbycostP6PROJECTnumberProject - SumETCByCost maps to project.SumETCByCost
sumetcbylaborunitsP6PROJECTnumberProject - SumETCByLaborUnits maps to project.SumETCByLaborUnits
sumexpensecostpctcompleteP6PROJECTnumberProject - SumExpenseCostPctComplete maps to project.SumExpenseCostPctComplete
sumlaborcostpercentcompleteP6PROJECTnumberProject - SumLaborCostPercentComplete maps to project.SumLaborCostPercentComplete
sumlaborunitspercentcompleteP6PROJECTnumberProject - SumLaborUnitsPercentComplete maps to project.SumLaborUnitsPercentComplete
sumactivitycountP6PROJECTnumberProject - SumActivityCount maps to project.SumActivityCount
sumactualdurationP6PROJECTnumberProject - SumActualDuration maps to project.SumActualDuration
sumactualexpensecostP6PROJECTnumberProject - SumActualExpenseCost maps to project.SumActualExpenseCost
sumactualfinishdateP6PROJECTdateProject - SumActualFinishDate maps to project.SumActualFinishDate
summaxactualfinishdateP6PROJECTdateProject - SumMaxActualFinishDate
summaxrestartdateP6PROJECTdateProject - SumMaxRestartDate
sumactuallaborcostP6PROJECTnumberProject - SumActualLaborCost maps to project.SumActualLaborCost
sumactuallaborunitsP6PROJECTnumberProject - SumActualLaborUnits maps to project.SumActualLaborUnits
sumactualmaterialcostP6PROJECTnumberProject - SumActualMaterialCost maps to project.SumActualMaterialCost
sumactualnonlaborcostP6PROJECTnumberProject - SumActualNonLaborCost maps to project.SumActualNonLaborCost
sumactualnonlaborunitsP6PROJECTnumberProject - SumActualNonLaborUnits maps to project.SumActualNonLaborUnits
sumactualstartdateP6PROJECTdateProject - SumActualStartDate maps to project.SumActualStartDate
sumactualthisperiodcostP6PROJECTnumberProject - SumActualThisPeriodCost maps to project.SumActualThisPeriodCost
sumactualtotalcostP6PROJECTnumberProject - SumActualTotalCost maps to project.SumActualTotalCost
sumactualvaluebycostP6PROJECTnumberProject - SumActualValueByCost maps to project.SumActualValueByCost
sumactualvaluebylaborunitsP6PROJECTnumberProject - SumActualValueByLaborUnits maps to project.SumActualValueByLaborUnits
sumatcompletiondurationP6PROJECTnumberProject - SumAtCompletionDuration maps to project.SumAtCompletionDuration
sumatcompletionexpensecostP6PROJECTnumberProject - SumAtCompletionExpenseCost maps to project.SumAtCompletionExpenseCost
sumatcompletionlaborcostP6PROJECTnumberProject - SumAtCompletionLaborCost maps to project.SumAtCompletionLaborCost
sumatcompletionlaborunitsP6PROJECTnumberProject - SumAtCompletionLaborUnits maps to project.SumAtCompletionLaborUnits
sumatcompletiontotalcostP6PROJECTnumberProject - SumAtCompletionTotalCost maps to project.SumAtCompletionTotalCost
sumbaselinedurationP6PROJECTnumberProject - SumBaselineDuration maps to project.SumBaselineDuration
sumbaselineexpensecostP6PROJECTnumberProject - SumBaselineExpenseCost maps to project.SumBaselineExpenseCost
sumbaselinefinishdateP6PROJECTdateProject - SumBaselineFinishDate maps to project.SumBaselineFinishDate
sumbaselinelaborcostP6PROJECTnumberProject - SumBaselineLaborCost maps to project.SumBaselineLaborCost
sumbaselinelaborunitsP6PROJECTnumberProject - SumBaselineLaborUnits maps to project.SumBaselineLaborUnits
sumbaselinematerialcostP6PROJECTnumberProject - SumBaselineMaterialCost maps to project.SumBaselineMaterialCost
sumbaselinenonlaborcostP6PROJECTnumberProject - SumBaselineNonLaborCost maps to project.SumBaselineNonLaborCost
sumbaselinenonlaborunitsP6PROJECTnumberProject - SumBaselineNonLaborUnits maps to project.SumBaselineNonLaborUnits
sumbaselinestartdateP6PROJECTdateProject - SumBaselineStartDate maps to project.SumBaselineStartDate
sumbaselinetotalcostP6PROJECTnumberProject - SumBaselineTotalCost maps to project.SumBaselineTotalCost
sumcompletedactivitycountP6PROJECTnumberProject - SumCompletedActivityCount maps to project.SumCompletedActivityCount
sumcostpercentcompleteP6PROJECTnumberProject - SumCostPercentComplete maps to project.SumCostPercentComplete
sumcostpercentofplannedP6PROJECTnumberProject - SumCostPercentOfPlanned maps to project.SumCostPercentOfPlanned
sumcostvariancebycostP6PROJECTnumberProject - SumCostVarianceByCost maps to project.SumCostVarianceByCost
sumcostvarianceindexP6PROJECTnumberProject - SumCostVarianceIndex maps to project.SumCostVarianceIndex
sumcostvarianceindexbycostP6PROJECTnumberProject - SumCostVarianceIndexByCost maps to project.SumCostVarianceIndexByCost
sumdurationpercentcompleteP6PROJECTnumberProject - SumDurationPercentComplete maps to project.SumDurationPercentComplete
sumdurationvarianceP6PROJECTnumberProject - SumDurationVariance maps to project.SumDurationVariance
sumearnedvaluebycostP6PROJECTnumberProject - SumEarnedValueByCost maps to project.SumEarnedValueByCost
sumearnedvaluebylaborunitsP6PROJECTnumberProject - SumEarnedValueByLaborUnits maps to project.SumEarnedValueByLaborUnits
sumexpensecostvarianceP6PROJECTnumberProject - SumExpenseCostVariance maps to project.SumExpenseCostVariance
sumfinishdatevarianceP6PROJECTnumberProject - SumFinishDateVariance maps to project.SumFinishDateVariance
suminprogressactivitycountP6PROJECTnumberProject - SumInProgressActivityCount maps to project.SumInProgressActivityCount
sumlaborcostvarianceP6PROJECTnumberProject - SumLaborCostVariance maps to project.SumLaborCostVariance
sumlaborunitsvarianceP6PROJECTnumberProject - SumLaborUnitsVariance maps to project.SumLaborUnitsVariance
summaterialcostvarianceP6PROJECTnumberProject - SumMaterialCostVariance maps to project.SumMaterialCostVariance
sumnonlaborcostvarianceP6PROJECTnumberProject - SumNonLaborCostVariance maps to project.SumNonLaborCostVariance
sumnonlaborunitsvarianceP6PROJECTnumberProject - SumNonLaborUnitsVariance maps to project.SumNonLaborUnitsVariance
sumnotstartedactivitycountP6PROJECTnumberProject - SumNotStartedActivityCount maps to project.SumNotStartedActivityCount
sumplannedvaluebycostP6PROJECTnumberProject - SumPlannedValueByCost maps to project.SumPlannedValueByCost
sumprogressfinishdateP6PROJECTdateProject - SumProgressFinishDate maps to project.SumProgressFinishDate
sumremainingdurationP6PROJECTnumberProject - SumRemainingDuration maps to project.SumRemainingDuration
sumremainingexpensecostP6PROJECTnumberProject - SumRemainingExpenseCost maps to project.SumRemainingExpenseCost
sumremainingfinishdateP6PROJECTdateProject - SumRemainingFinishDate maps to project.SumRemainingFinishDate
sumremaininglaborcostP6PROJECTnumberProject - SumRemainingLaborCost maps to project.SumRemainingLaborCost
sumremaininglaborunitsP6PROJECTnumberProject - SumRemainingLaborUnits maps to project.SumRemainingLaborUnits
sumremainingmaterialcostP6PROJECTnumberProject - SumRemainingMaterialCost maps to project.SumRemainingMaterialCost
sumremainingnonlaborcostP6PROJECTnumberProject - SumRemainingNonLaborCost maps to project.SumRemainingNonLaborCost
sumremainingnonlaborunitsP6PROJECTnumberProject - SumRemainingNonLaborUnits maps to project.SumRemainingNonLaborUnits
sumremainingstartdateP6PROJECTdateProject - SumRemainingStartDate maps to project.SumRemainingStartDate
sumremainingtotalcostP6PROJECTnumberProject - SumRemainingTotalCost maps to project.SumRemainingTotalCost
sumschedulepercentcompleteP6PROJECTnumberProject - SumSchedulePercentComplete maps to project.SumSchedulePercentComplete
sumperformancepercentcompleteP6PROJECTnumberProject - SumPerformancePercentComplete maps to project.SumPerformancePercentComplete
sumschedulevariancebycostP6PROJECTnumberProject - SumScheduleVarianceByCost maps to project.SumScheduleVarianceByCost
sumschedulevarianceindexP6PROJECTnumberProject - SumScheduleVarianceIndex maps to project.SumScheduleVarianceIndex
sumstartdatevarianceP6PROJECTnumberProject - SumStartDateVariance maps to project.SumStartDateVariance
sumtotalcostvarianceP6PROJECTnumberProject - SumTotalCostVariance maps to project.SumTotalCostVariance
sumtotalfloatP6PROJECTnumberProject - SumTotalFloat maps to project.SumTotalFloat
sumunitspercentcompleteP6PROJECTnumberProject - SumUnitsPercentComplete maps to project.SumUnitsPercentComplete
summaterialcostpctcompleteP6PROJECTnumberProject - SumMaterialCostPctComplete maps to project.SumMaterialCostPctComplete
sumnonlaborcostpctcompleteP6PROJECTnumberProject - SumNonLaborCostPctComplete maps to project.SumNonLaborCostPctComplete
sumnonlaborunitspctcompleteP6PROJECTnumberProject - SumNonLaborUnitsPctComplete maps to project.SumNonLaborUnitsPctComplete
sumperfpctcmpbylaborunitsP6PROJECTnumberProject - SumPerfPctCmpByLaborUnits maps to project.SumPerfPctCmpByLaborUnits
sumplannedvaluebylaborunitsP6PROJECTnumberProject - SumPlannedValueByLaborUnits maps to project.SumPlannedValueByLaborUnits
sumschdpctcmpbylaborunitsP6PROJECTnumberProject - SumSchdPctCmpByLaborUnits maps to project.SumSchdPctCmpByLaborUnits
sumschdperfindexbylaborunitsP6PROJECTnumberProject - SumSchdPerfIndexByLaborUnits maps to project.SumSchdPerfIndexByLaborUnits
sumschdvariancebylaborunitsP6PROJECTnumberProject - SumSchdVarianceByLaborUnits maps to project.SumSchdVarianceByLaborUnits
sumschdvarianceindexbycostP6PROJECTnumberProject - SumSchdVarianceIndexByCost maps to project.SumSchdVarianceIndexByCost
sumschdvarindexbylaborunitsP6PROJECTnumberProject - SumSchdVarIndexByLaborUnits maps to project.SumSchdVarIndexByLaborUnits
sumscheduleperfindexbycostP6PROJECTnumberProject - SumSchedulePerfIndexByCost maps to project.SumSchedulePerfIndexByCost
sumtocompleteperfindexbycostP6PROJECTnumberProject - SumToCompletePerfIndexByCost maps to project.SumToCompletePerfIndexByCost
sumvaratcmpbylaborunitsP6PROJECTnumberProject - SumVarAtCmpByLaborUnits maps to project.SumVarAtCmpByLaborUnits
sumearlystartdateP6PROJECTdateProject - SumEarlyStartDate
sumearlyenddateP6PROJECTdateProject - SumEarlyEndDate
sumlatestartdateP6PROJECTdateProject - SumLateStartDate
sumlateenddateP6PROJECTdateProject - SumLateEndDate
summaxcalendaridP6PROJECTnumberProject - SumMaxCalendarId maps to project.SumMaxCalendarId
summincalendaridP6PROJECTnumberProject - SumMinCalendarId maps to project.SumMinCalendarId
TotalBenefitPlanP6ProjectnumberThe sum of the monthly benefit plan.
TotalBenefitPlanTallyP6ProjectnumberThe sum of the monthly benefit plan tally.
TotalFundingP6ProjectnumberThe total amount of funding contributed to the project by your funding sources.
TotalSpendingPlanP6ProjectnumberThe sum of the monthly spending plan.
TotalSpendingPlanTallyP6ProjectnumberThe sum of the monthly spending plan tally.
UnallocatedBudgetP6ProjectnumberThe total current budget minus the distributed current budget.
NetPresentValueP6ProjectnumberThe estimated net value, at the present time for the project
ReturnOnInvestmentP6ProjectnumberThe estimated return on investment for the project
PaybackPeriodP6ProjectintegerThe PaybackPeriod for the project
UndistributedCurrentVarianceP6ProjectnumberThe total spending plan minus the total spending plan tally.
projectdescriptionP6PROJECTstringProject - ProjectDescription maps to PROJECT.description
baselinetypeobjectidP6PROJECTintegerProject - BaselineTypeObjectId maps to project.BaselineTypeObjectId
EnablePublicationP6Projectprojectpx_enable_publication_flagstringEnables the project to be processed by the Project Arbiter service.
nextpublicationdateP6PROJECTdateProject - NextPublicationDate maps to project.px_next_datae
LastPublishedOnP6Projectprojectpx_last_update_datedateThe date the project was last published.
PublicationPriorityP6Projectprojectpx_priorityintA priority value the Project Arbiter service uses to determine the order in which projects are submitted to the service queue, where 1 is highest priority and 100 is lowest priority.
LocationObjectIdP6Projectprojectlocation_idintegerThe unique ID of the location assigned to the project.
HistoryIntervalP6ProjectprojectHIST_INTERVALstringThe time interval for how historical project data is stored for use in P6 Analytics, could be 'Month', 'Week', 'Quarter', 'Year' and 'Financial Period'.
HistoryLevelP6ProjectprojectHIST_LEVELstringThe level of historical project data that is stored for use in P6 Analytics, cab be 'None', 'Project', 'WBS' and 'Activity'.
LocationNameP6Projectlocationlocation_namestringThe name of the location assigned to the project.
AllowStatusReviewP6Projectprojectcontrol_updates_flagstringThe indicator that determines whether status updates to activities in a project are eligible for manual approval before commiting changes.
lastupdateuserP6PROJECTstringLast Update User
lastupdatedateP6PROJECTdateLast Update Date
createuserP6PROJECTstringCreate User
EtlIntervalP6Projectprojectetl_intervalintegerThe time interval for ETL for use in P6 Analytics, could be 'None', 'Scheduled', 'Immediate'.
etlhourP6PROJECTintegeretl hour
createdateP6PROJECTdateCreate Date
lastupdatedatexP6PROJECTdateProjectX Update Date
SKeyP6PROJECTintSKey generated key on Project
P6PROJECTBUDGETCHANGELOGTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectBudgetChangeLogbudgchngbudg_chng_idintegerThe unique ID generated by the system.
ProjectObjectIdP6ProjectBudgetChangeLogbudgchngproj_idintegerThe unique ID of the associated project.
WBSObjectIdP6ProjectBudgetChangeLogbudgchngwbs_idintegerThe unique ID of the WBS element to which the budget change log applies.
projectbudgetchangelogdateP6PROJECTBUDGETCHANGELOGdateProjectBudgetChangeLog - BudgetChangeLogDate maps to BUDGCHNG.chng_date
ChangeNumberP6ProjectBudgetChangeLogbudgchngchng_short_namestringThe change number that is automatically incremented according to when changes are added. This can be changed to any number.
AmountP6ProjectBudgetChangeLogbudgchngchng_costdoubleThe amount of budget change.
ResponsibleP6ProjectBudgetChangeLogbudgchngchng_by_namestringThe person responsible for the change.
StatusP6ProjectBudgetChangeLogbudgchngstatus_codestringThe status of this budget change request. Possible values are 'Pending', 'Approved', and 'Not Approved'.
ReasonP6ProjectBudgetChangeLogbudgchngchng_descrstringThe description of the reason for the budget change request.
ProjectIdP6ProjectBudgetChangeLogprojectproj_short_namestringThe short code that uniquely identifies the project.
WBSCodeP6ProjectBudgetChangeLogprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
WBSNameP6ProjectBudgetChangeLogprojwbswbs_namestringThe name of the WBS element.
IsBaselineP6ProjectBudgetChangeLogstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectBudgetChangeLogstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6PROJECTBUDGETCHANGELOGstringLast Update User
lastupdatedateP6PROJECTBUDGETCHANGELOGdateLast Update Date
createuserP6PROJECTBUDGETCHANGELOGstringCreate User
createdateP6PROJECTBUDGETCHANGELOGdateCreate Date
SKeyP6PROJECTBUDGETCHANGELOGintSKey generated key on ProjectBudgetChangeLog
P6PROJECTCODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectCodepcatvalproj_catg_idintegerThe unique ID generated by the system.
CodeTypeObjectIdP6ProjectCodepcatvalproj_catg_type_idintegerThe unique ID of the parent project code type.
SequenceNumberP6ProjectCodepcatvalseq_numintegerThe sequence number for sorting.
CodeValueP6ProjectCodepcatvalproj_catg_short_namestringThe value of the project code.
ParentObjectIdP6ProjectCodepcatvalparent_proj_catg_idintegerThe unique ID of the parent project code of this project code in the hierarchy.
DescriptionP6ProjectCodepcatvalproj_catg_namestringThe description of the project code.
WeightP6ProjectCodepcatvalproj_catg_wtdoubleThe weight for this code value.
CodeTypeNameP6ProjectCodepcattypeproj_catg_typestringThe name of the parent code type for this code.
issecurecodeP6PROJECTCODEstringProjectCode - IsSecureCode maps to ACTVTYPE.super_flag
lastupdateuserP6PROJECTCODEstringLast Update User
lastupdatedateP6PROJECTCODEdateLast Update Date
createuserP6PROJECTCODEstringCreate User
createdateP6PROJECTCODEdateCreate Date
SKeyP6PROJECTCODEintSKey generated key on ProjectCode
P6PROJECTCODEASSIGNMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ProjectObjectIdP6ProjectCodeAssignmentprojpcatproj_idintegerThe unique ID of the project to which the project code is assigned.
ProjectCodeTypeObjectIdP6ProjectCodeAssignmentprojpcatproj_catg_type_idintegerThe unique ID of the parent project code type.
ProjectCodeObjectIdP6ProjectCodeAssignmentprojpcatproj_catg_idintegerThe unique ID of the associated project code.
IsBaselineP6ProjectCodeAssignmentstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectCodeAssignmentstringThe boolean value indicating if this business object is related to a template Project.
ProjectCodeDescriptionP6ProjectCodeAssignmentpcatvalproj_catg_namestringThe description of the associated project code.
ProjectCodeTypeNameP6ProjectCodeAssignmentpcattypeproj_catg_typestringThe name of the parent project code type.
ProjectCodeValueP6ProjectCodeAssignmentpcatvalproj_catg_short_namestringThe value of the associated project code.
ProjectNameP6ProjectCodeAssignmentprojwbswbs_namestringThe name of the project to which the project code is assigned.
issecurecodeP6PROJECTCODEASSIGNMENTstringProjectCodeAssignment - IsSecureCode maps to ACTVTYPE.super_flag
lastupdateuserP6PROJECTCODEASSIGNMENTstringLast Update User
lastupdatedateP6PROJECTCODEASSIGNMENTdateLast Update Date
createuserP6PROJECTCODEASSIGNMENTstringCreate User
createdateP6PROJECTCODEASSIGNMENTdateCreate Date
SKeyP6PROJECTCODEASSIGNMENTintSKey generated key on ProjectCodeAssignment
P6PROJECTCODEHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
CodeTypeObjectIdP6PROJECTCODEHIERARCHYinteger
CodeTypeNameP6PROJECTCODEHIERARCHYstring
CodeTypeSequenceNumberP6PROJECTCODEHIERARCHYinteger
CodeTypeIsSecureP6PROJECTCODEHIERARCHYstring
ParentCodeValueObjectIdP6PROJECTCODEHIERARCHYinteger
ParentCodeValueNameP6PROJECTCODEHIERARCHYstring
ParentCodeValueShortNameP6PROJECTCODEHIERARCHYstring
ParentCodeValueSequenceNumberP6PROJECTCODEHIERARCHYinteger
ChildCodeValueObjectIdP6PROJECTCODEHIERARCHYinteger
ChildCodeValueNameP6PROJECTCODEHIERARCHYstring
ChildCodeValueShortNameP6PROJECTCODEHIERARCHYstring
ChildCodeValueSequenceNumberP6PROJECTCODEHIERARCHYinteger
ParentLevelsBelowRootP6PROJECTCODEHIERARCHYinteger
ChildLevelsBelowRootP6PROJECTCODEHIERARCHYinteger
LevelsBetweenP6PROJECTCODEHIERARCHYinteger
ChildHasChildrenP6PROJECTCODEHIERARCHYstring
FullPathNameP6PROJECTCODEHIERARCHYstring
CodeTypeWeightP6PROJECTCODEHIERARCHYdouble
MaxCodeValueWeightP6PROJECTCODEHIERARCHYdouble
ParentCodeValueWeightP6PROJECTCODEHIERARCHYdouble
ChildCodeValueWeightP6PROJECTCODEHIERARCHYdouble
SKeyP6PROJECTCODEHIERARCHYint
P6PROJECTCODETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectCodeTypepcattypeproj_catg_type_idintegerThe unique ID generated by the system.
SequenceNumberP6ProjectCodeTypepcattypeseq_numintegerThe sequence number for sorting.
LengthP6ProjectCodeTypepcattypeproj_catg_short_lenintegerThe maximum number of characters allowed for values of this project code.
NameP6ProjectCodeTypepcattypeproj_catg_typestringThe name of the project code type.
IsSecureCodeP6ProjectCodeTypepcattypesuper_flagstringthe flag indicating whether this is a secure Project Code Type.
WeightP6ProjectCodeTypepcattypeproj_catg_type_wtdoubleThe weight for this project code type.
MaxCodeValueWeightP6ProjectCodeTypepcattypemax_proj_catg_wtdoubleThe maximum weight of the code values for this project code type.
lastupdateuserP6PROJECTCODETYPEstringLast Update User
lastupdatedateP6PROJECTCODETYPEdateLast Update Date
createuserP6PROJECTCODETYPEstringCreate User
createdateP6PROJECTCODETYPEdateCreate Date
SKeyP6PROJECTCODETYPEintSKey generated key on ProjectCodeType
P6PROJECTCODEUSERTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
codeobjectidP6PROJECTCODEUSERintegerProjectCodeUser - CodeObjectId maps to PCATUSER.proj_catg_id
userobjectidP6PROJECTCODEUSERintegerProjectCodeUser - UserObjectId maps to PCATUSER.user_id
codetypeobjectidP6PROJECTCODEUSERintegerProjectCodeUser - CodeTypeObjectId maps to pcatuser.CodeTypeObjectId
codevalueP6PROJECTCODEUSERstringProjectCodeUser - CodeValue maps to pcatuser.CodeValue
usernameP6PROJECTCODEUSERstringProjectCodeUser - UserName maps to pcatuser.UserName
lastupdateuserP6PROJECTCODEUSERstringLast Update User
lastupdatedateP6PROJECTCODEUSERdateLast Update Date
createuserP6PROJECTCODEUSERstringCreate User
createdateP6PROJECTCODEUSERdateCreate Date
SKeyP6PROJECTCODEUSERintSKey generated key on ProjectCodeUser
P6PROJECTDOCUMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectDocumenttaskdoctaskdoc_idintegerThe unique ID generated by the system.
DocumentObjectIdP6ProjectDocumenttaskdocdoc_idintegerThe unique ID of the document to which the activity document applies.
ProjectObjectIdP6ProjectDocumenttaskdocproj_idintegerThe unique ID of the project to which the activity document applies.
WBSObjectIdP6ProjectDocumenttaskdocwbs_idintegerThe unique ID of the WBS to which the activity document applies.
IsWorkProductP6ProjectDocumenttaskdocwp_flagstringThe flag that indicates whether the document is a work product.
ActivityObjectIdP6ProjectDocumenttaskdoctask_idintegerThe unique ID of the activity to which the activity document applies.
IsBaselineP6ProjectDocumentstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectDocumentstringThe boolean value indicating if this business object is related to a template Project.
ActivityIdP6ProjectDocumenttasktask_codestringThe short ID that uniquely identifies the activity within the project.
ActivityNameP6ProjectDocumenttasktask_namestringThe name of the activity. The activity name does not have to be unique.
DocumentTitleP6ProjectDocumentdocumentdoc_namestringThe title or name of a document assigned to a WBS or activity within a project.
ProjectIdP6ProjectDocumentprojectproj_short_namestringThe short code that uniquely identifies the project.
WBSCodeP6ProjectDocumentprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
WBSNameP6ProjectDocumentprojwbswbs_namestringThe name of the WBS element.
lastupdateuserP6PROJECTDOCUMENTstringLast Update User
lastupdatedateP6PROJECTDOCUMENTdateLast Update Date
createuserP6PROJECTDOCUMENTstringCreate User
createdateP6PROJECTDOCUMENTdateCreate Date
SKeyP6PROJECTDOCUMENTintSKey generated key on ProjectDocument
P6PROJECTFUNDINGTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectFundingprojfundproj_fund_idintegerThe unique ID generated by the system.
FundingSourceObjectIdP6ProjectFundingprojfundfund_idintegerThe unique ID of the associated funding source for this project funding.
ProjectObjectIdP6ProjectFundingprojfundproj_idintegerThe unique ID of the associated project source for this project funding.
AmountP6ProjectFundingprojfundfund_costdoubleThe amount of a funding source that is allocated to the project.
FundShareP6ProjectFundingprojfundfund_wtdoubleThe percentage of the total fund that is allocated to the project.
IsBaselineP6ProjectFundingstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectFundingstringThe boolean value indicating if this business object is related to a template Project.
ProjectIdP6ProjectFundingprojectproj_short_namestringThe short code that uniquely identifies the associated project.
lastupdateuserP6PROJECTFUNDINGstringLast Update User
lastupdatedateP6PROJECTFUNDINGdateLast Update Date
createuserP6PROJECTFUNDINGstringCreate User
createdateP6PROJECTFUNDINGdateCreate Date
SKeyP6PROJECTFUNDINGintSKey generated key on ProjectFunding
P6PROJECTISSUETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectIssueprojissuissue_idintegerThe unique ID generated by the system.
ProjectObjectIdP6ProjectIssueprojissuproj_idintegerThe unique ID of the associated project.
OBSObjectIdP6ProjectIssueprojissuobs_idintegerThe unique ID of the project manager from the project's OBS tree who is responsible for the project issue.
PriorityP6ProjectIssueprojissupriority_typestringThe priority of the project issue. Valid values are 'Top', 'High', 'Normal', 'Low', and 'Lowest'.
StatusP6ProjectIssueprojissustatus_codestringThe current status of the project issue. Valid values are 'Open', 'On Hold', and 'Closed'.
NameP6ProjectIssueprojissuissue_namestringThe name of the project issue. Issues which are automatically generated by the threshold monitor are named after the threshold parameter that triggered the project issue.
ProjectThresholdObjectIdP6ProjectIssueprojissuthresh_idintegerThe unique ID of the associated project threshold for the project issue.
WBSObjectIdP6ProjectIssueprojissuwbs_idintegerThe unique ID of the WBS to which the project issue applies. If a parent WBS is selected, the project issue applies to all child elements as well. If the top WBS is selected, the project issue applies to the entire project.
ActivityObjectIdP6ProjectIssueprojissutask_idintegerThe unique ID of the activity to which the project issue applies.
ResourceObjectIdP6ProjectIssueprojissursrc_idintegerThe unique ID of the associated resource for this project issue. If a parent resource is selected, the issue applies to all child resources as well.
ThresholdParameterObjectIdP6ProjectIssueprojissuthresh_parm_idintegerThe unique ID of the associated threshold parameter for the project issue.
ActualValueP6ProjectIssueprojissuissue_valuedoubleThe actual value of the threshold parameter for the project issue. Issues are automatically generated by the threshold monitor when actual values of threshold parameters exceed target values.
LowerThresholdP6ProjectIssueprojissulo_parm_valuedoubleThe lower value of the threshold parameter that triggered the project issue. Issues are triggered when the actual/observed parameters values are less than or equal to the lower threshold.
UpperThresholdP6ProjectIssueprojissuhi_parm_valuedoubleThe upper value of the threshold parameter which triggered the project issue. Issues are triggered when the actual/observed parameters values are greater than or equal to the upper threshold.
IdentifiedByP6ProjectIssueprojissuadd_by_namestringThe identifier of the project issue. This may be the name of the user who created the project issue or Monitor, if the project issue was automatically generated by the threshold monitor.
ResolutionDateP6ProjectIssueprojissuresolv_datedateThe date the project issue was resolved.
DateIdentifiedP6ProjectIssueprojissuadd_datedateThe date the project issue was identified.
NotesP6ProjectIssueprojissuissue_notesclobThe notes associated with the project issue.
IsBaselineP6ProjectIssuestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectIssuestringThe boolean value indicating if this business object is related to a template Project.
ActivityIdP6ProjectIssuetasktask_codestringThe short ID that uniquely identifies the activity within the project.
ActivityNameP6ProjectIssuetasktask_namestringThe name of the activity. The activity name does not have to be unique.
OBSNameP6ProjectIssueobsobs_namestringThe name of the person/role in the organization, sometimes referred to as the "responsible manager".
ProjectIdP6ProjectIssueprojectproj_short_namestringThe short code that uniquely identifies the project.
RawTextNoteP6ProjectIssueclobThe notes associated with the project issue.
ResourceIdP6ProjectIssuersrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6ProjectIssuersrcrsrc_namestringThe name of the resource.
WBSCodeP6ProjectIssueprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
WBSNameP6ProjectIssueprojwbswbs_namestringThe name of the WBS element.
lastupdateuserP6PROJECTISSUEstringLast Update User
lastupdatedateP6PROJECTISSUEdateLast Update Date
createuserP6PROJECTISSUEstringCreate User
createdateP6PROJECTISSUEdateCreate Date
SKeyP6PROJECTISSUEintSKey generated key on ProjectIssue
P6PROJECTNOTETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectNotewbsmemowbs_memo_idintegerThe unique ID generated by the system.
ProjectObjectIdP6ProjectNotewbsmemoproj_idintegerThe unique ID of the associated project.
WBSObjectIdP6ProjectNotewbsmemowbs_idintegerThe unique ID of the associated WBS.
NotebookTopicObjectIdP6ProjectNotewbsmemomemo_type_idintegerThe unique ID of the associated notebook topic.
NoteP6ProjectNotewbsmemowbs_memoclobThe information that is associated with the notebook topic.
IsBaselineP6ProjectNotestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectNotestringThe boolean value indicating if this business object is related to a template Project.
NotebookTopicNameP6ProjectNotememotypememo_typestringThe name of the associated notebook topic.
ProjectIdP6ProjectNoteprojectproj_short_namestringThe short code that uniquely identifies the project associated with this note.
RawTextNoteP6ProjectNoteclobThe information that is associated with the notebook topic, without any HTML.
WBSCodeP6ProjectNoteprojwbswbs_short_namestringThe short code assigned to each WBS element for identification.
WBSNameP6ProjectNoteprojwbswbs_namestringThe name of the WBS element associated with this note.
lastupdateuserP6PROJECTNOTEstringLast Update User
lastupdatedateP6PROJECTNOTEdateLast Update Date
createuserP6PROJECTNOTEstringCreate User
createdateP6PROJECTNOTEdateCreate Date
SKeyP6PROJECTNOTEintSKey generated key on ProjectNote
P6PROJECTPORTFOLIOTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectPortfoliopfoliopfolio_idintegerThe unique ID generated by the system.
IncludeClosedProjectsP6ProjectPortfoliopfolioclosed_proj_flagstringThe flag that indicates whether closed projects are included in the portfolio.
IncludeWhatIfProjectsP6ProjectPortfoliopfoliowhatif_proj_flagstringThe flag that indicates whether what-if projects are included in the portfolio.
TypeP6ProjectPortfoliopfoliopfolio_typestringThe type of the project portfolio: "Manual", "Auto-Maintained", or "Filtered".
NameP6ProjectPortfoliopfoliopfolio_namestringThe name of the project portfolio.
UserObjectIdP6ProjectPortfoliopfoliouser_idintegerThe unique ID of a specific user who has access to the selected project portfolio.
DescriptionP6ProjectPortfoliopfoliopfolio_descrstringThe description of the project portfolio.
UserNameP6ProjectPortfoliousersuser_namestringThe user's login name.
lastupdateuserP6PROJECTPORTFOLIOstringLast Update User
lastupdatedateP6PROJECTPORTFOLIOdateLast Update Date
createuserP6PROJECTPORTFOLIOstringCreate User
createdateP6PROJECTPORTFOLIOdateCreate Date
SKeyP6PROJECTPORTFOLIOintSKey generated key on ProjectPortfolio
P6PROJECTPROFILETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectProfileprofileprof_idintegerThe unique ID generated by the system.
IsDefaultP6ProjectProfileprofiledefault_flagstringThe flag that indicates this security profile is the default profile assigned to UserOBS objects. When a ProjectProfile object is deleted from the database, all UserOBS objects assigned to that profile are reassigned to the default profile. You cannot not delete the default profile.
IsSuperUserP6ProjectProfileprofilesuperuser_flagstringThe flag that indicates this is the project superuser profile, which gives a user read/write privileges for all project and OBS specific information and features
NameP6ProjectProfileprofileprof_namestringThe unique name of this project profile
lastupdateuserP6PROJECTPROFILEstringLast Update User
lastupdatedateP6PROJECTPROFILEdateLast Update Date
createuserP6PROJECTPROFILEstringCreate User
createdateP6PROJECTPROFILEdateCreate Date
SKeyP6PROJECTPROFILEintSKey generated key on ProjectProfile
P6PROJECTPROJECTPORTFOLIOTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
projectportfolioobjectidP6PROJECTPROJECTPORTFOLIOintegerProjectProjectPortfolio - ProjectPortfolioObjectId maps to PRPFOLIO.pfolio_id
projectobjectidP6PROJECTPROJECTPORTFOLIOintegerProjectProjectPortfolio - ProjectObjectId maps to PRPFOLIO.wbs_id
lastupdateuserP6PROJECTPROJECTPORTFOLIOstringLast Update User
lastupdatedateP6PROJECTPROJECTPORTFOLIOdateLast Update Date
createuserP6PROJECTPROJECTPORTFOLIOstringCreate User
createdateP6PROJECTPROJECTPORTFOLIOdateCreate Date
SKeyP6PROJECTPROJECTPORTFOLIOintSKey generated key on ProjectProjectPortfolio
P6PROJECTRESOURCETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectResourcewbsrsrcwbsrsrc_idintegerThe unique ID generated by the system.
WBSObjectIdP6ProjectResourcewbsrsrcwbs_idintegerThe unique ID of the associated WBS.
ResourceObjectIdP6ProjectResourcewbsrsrcrsrc_idintegerThe unique ID of the associated resource.
ProjectObjectIdP6ProjectResourcewbsrsrcproj_idintegerThe unique ID of the associated project.
CommittedFlagP6ProjectResourcewbsrsrccommitted_flagstringThe Boolean value that determines whether a resource is committed, and so, the resource assignment is stable and unlikely to change. When calculating availability, Primavera considers only assignments that are marked as committed.
StartDateP6ProjectResourcewbsrsrcstart_datedateThe start date of the assignment. By default, it is set to the Planned Start date of the project. If LifeOfProjectFlag is set to true, this date is set to the Project Planned Start date. If associated ProjectResourceQuantities exist, this field is set to the beginning of the week of the earliest ProjectResourceQuantity.
FinishDateP6ProjectResourcewbsrsrcend_datedateThe finish date of the assignment. By default, it is set to the Planned Start date of the project + 1 day, finishing at 5:00pm. For example, if the planned start date is January 1, 8:00am, the finish date is set to January 2, 5:00pm. If LifeOfProjectFlag is set to true during creation, this date is set to the Project Scheduled Finish date. If associated ProjectResourceQuantities exist, this field is set to the end of the week of the latest ProjectResourceQuantity.
LifeOfProjectFlagP6ProjectResourcewbsrsrcauto_compute_dates_flagstringThe Boolean value that determines whether a resource that is assigned to a project at Project or WBS level, has that assignment for the duration of the project.
IsBaselineP6ProjectResourcestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectResourcestringThe boolean value indicating if this business object is related to a template Project.
ProjectIdP6ProjectResourceprojectproj_short_namestringThe short code that uniquely identifies the associated project.
ResourceNameP6ProjectResourcersrcrsrc_namestringThe name of the associated resource.
RoleNameP6ProjectResourcerolesrole_namestringThe name of the associated role.
RoleObjectIdP6ProjectResourcewbsrsrcrole_idintegerThe unique ID of the associated role.
StatusP6ProjectResourceprojwbsstatus_codestringThe project or WBS status: 'Planned', 'Active', 'Inactive', 'What-If', or 'Requested'.
WBSCodeP6ProjectResourceprojwbswbs_short_namestringThe short code assigned to the associated WBS element for identification.
lastupdateuserP6PROJECTRESOURCEstringLast Update User
lastupdatedateP6PROJECTRESOURCEdateLast Update Date
createuserP6PROJECTRESOURCEstringCreate User
createdateP6PROJECTRESOURCEdateCreate Date
SKeyP6PROJECTRESOURCEintSKey generated key on ProjectResource
P6PROJECTRESOURCEQUANTITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ProjectResourceObjectIdP6ProjectResourceQuantitywbsrsrc_qtywbsrsrc_idintegerThe unique ID of the associated project resource.
WeekStartDateP6ProjectResourceQuantitywbsrsrc_qtyweek_startdateThe date value that represents the first day of the week.
MonthStartDateP6ProjectResourceQuantitywbsrsrc_qtymonth_startdateThe date value that represents the first day of the month. If the week contains days from two different months, two objects will exist. The first ProjectResourceQuantity object's MonthStartDate is the first day of the month for the first week fragment. The second ProjectResourceQuantity object's MonthStartDate is the first day of the month for the second week fragment.
QuantityP6ProjectResourceQuantitywbsrsrc_qtyqtydoubleThe value that represents the resource allocation hours per week for this project resource quantity. If the week contains days from two different months, two ProjectResourceQuantity business objects will exist. The first business object's Quantity field represents the hours of the first week fragment (WeekStartDate and MonthStartDate have the same month value). The second business object's Quantity field represents the second week fragment (WeekStartDate and MonthStartDate have different month values).
IsBaselineP6ProjectResourceQuantitystringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectResourceQuantitystringThe boolean value indicating if this business object is related to a template Project.
CommittedFlagP6ProjectResourceQuantitywbsrsrccommitted_flagstringThe Boolean value that determines whether a resource is committed, and so, the resource assignment is stable and unlikely to change. When calculating availability, Primavera considers only assignments that are marked as committed.
ProjectObjectIdP6ProjectResourceQuantitywbsrsrcproj_idintegerThe unique ID of the associated project.
ResourceObjectIdP6ProjectResourceQuantitywbsrsrcrsrc_idintegerThe unique ID of the associated resource.
WBSObjectIdP6ProjectResourceQuantitywbsrsrcwbs_idintegerThe unique ID of the associated WBS.
lastupdateuserP6PROJECTRESOURCEQUANTITYstringLast Update User
lastupdatedateP6PROJECTRESOURCEQUANTITYdateLast Update Date
createuserP6PROJECTRESOURCEQUANTITYstringCreate User
createdateP6PROJECTRESOURCEQUANTITYdateCreate Date
SKeyP6PROJECTRESOURCEQUANTITYintSKey generated key on ProjectResourceQuantity
P6RISKTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Riskriskrisk_idintegerThe unique ID generated by the system.
ProjectObjectIdP6Riskriskproj_idintegerThe unique ID of the associated project.
IdP6RiskriskidstringThe ID of the Risk. Must be unique within a project.
NameP6RiskrisknamestringThe name of the Risk. Does not need to be unique.
totalcostP6RISKdoubleRisk - TotalCost maps to RISK.total_cost
ResourceObjectIdP6Riskriskrsrc_idintegerThe unique ID of the associated resource.
RiskCategoryObjectIdP6Riskriskcategory_idintegerThe unique ID of the category to which the Risk is assigned. e.g. Weather, Health, Legal etc. A Risk can only be associated with a single category.
risktypeP6RISKstringRisk - RiskType maps to RISK.type
riskstatusP6RISKstringRisk - RiskStatus maps to RISK.status
DescriptionP6RiskriskdescriptionstringThe description of the Risk.
EffectP6RiskriskeffectstringThe description of the risks effect on the project.
CauseP6RiskriskcausestringThe description of the cause of the Risk.
NoteP6RiskrisknotestringThe comments associated with the Risk.
ScoreP6RiskintegerThe calculated score value of the impact values assigned to the risk.
ScoreTextP6RiskstringThe calculated score text value of the impact values assigned to the risk.
ScoreColorP6RiskstringThe color of the tolerance threshold for the score value.
ExposureP6RiskdoubleThe calculated exposure value for the risk.
IdentifiedByResourceObjectIdP6Riskriskidentified_by_idintegerThe unique ID of the resource that identified the risk.
IdentifiedByResourceIdP6Riskalias_rsrcrsrc_short_namestringThe short code of the resource that identified the risk.
IdentifiedByResourceNameP6Riskalias_rsrcrsrc_namestringThe name of the resource that identified the risk.
IdentifiedDateP6Riskriskidentified_datedateThe date this risk was identified.
ExposureStartDateP6RiskdateThe calculated date the exposure starts for the risk.
ExposureFinishDateP6RiskdateThe calculated date the exposure finishes for the risk.
IsBaselineP6RiskstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6RiskstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6RISKstringLast Update User
lastupdatedateP6RISKdateLast Update Date
createuserP6RISKstringCreate User
createdateP6RISKdateCreate Date
SKeyP6RISKintSKey generated key on Risk
P6RISKIMPACTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RiskObjectIdP6RiskImpactriskimpactrisk_idintegerThe unique ID of the associated risk.
ProjectObjectIdP6RiskImpactriskimpactproj_idintegerThe unique ID of the associated project.
RiskThresholdObjectIdP6RiskImpactriskimpactscoretype_idintegerThe unique ID of the associated Risk Threshold Type.
RiskThresholdLevelObjectIdP6RiskImpactriskimpactthreshold_idintegerThe unique ID of the associated Risk Threshold.
IsBaselineP6RiskImpactstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6RiskImpactstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6RISKIMPACTstringLast Update User
lastupdatedateP6RISKIMPACTdateLast Update Date
createuserP6RISKIMPACTstringCreate User
createdateP6RISKIMPACTdateCreate Date
SKeyP6RISKIMPACTintSKey generated key on RiskImpact
P6RISKRESPONSEACTIONTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RiskResponseActionriskmitmitigation_idintegerThe unique ID of the associated risk.
RiskResponsePlanObjectIdP6RiskResponseActionriskmitresponse_idintegerThe unique ID of the associated risk response plan.
ResourceObjectIdP6RiskResponseActionriskmitrsrc_idintegerThe unique ID of the associated resource.
ProjectObjectIdP6RiskResponseActionriskmitproj_idintegerThe unique ID of the associated project.
ActivityObjectIdP6RiskResponseActionriskmittask_idintegerThe unique ID of the associated activity.
IdP6RiskResponseActionriskmitidstringThe unique Id of the risk response action.
NameP6RiskResponseActionriskmitnamestringThe name of the risk response action.
riskresponseactionstatusP6RISKRESPONSEACTIONstringRISKRESPONSEACTION - Status maps to RISKMIT.status
ActualCostP6RiskResponseActiondoubleThe actual cost.
RemainingCostP6RiskResponseActiondoubleThe remaining cost associated with the risk response action.
PlannedCostP6RiskResponseActiondoubleThe planned cost.
PhysicalStartDateP6RISKRESPONSEACTIONdateRISKRESPONSEACTION - PhysicalStartDate maps to RISKRESPONSEACTION .StartDate
PhysicalFinishDateP6RISKRESPONSEACTIONdateRISKRESPONSEACTION - PhysicalFinishDate maps to RISKRESPONSEACTION .FinishDate
PhysicalBaseStartDateP6RISKRESPONSEACTIONdateRISKRESPONSEACTION - PhysicalBaseStartDate maps to RISKRESPONSEACTION .PlannedStartDate
PhysicalBaseFinishDateP6RISKRESPONSEACTIONdateRISKRESPONSEACTION - PhysicalBaseFinishtDate maps to RISKRESPONSEACTION .PlannedFinishDate
ScoreP6RiskResponseActionintegerThe risk score from the numeric PID after the response action has been completed.
ScoreTextP6RiskResponseActionstringThe risk score from the alphanumeric PID after the response action has been completed.
ScoreColorP6RiskResponseActionstringThe color of the tolerance threshold for the score value.
IsBaselineP6RiskResponseActionstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6RiskResponseActionstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6RISKRESPONSEACTIONstringLast Update User
lastupdatedateP6RISKRESPONSEACTIONdateLast Update Date
createuserP6RISKRESPONSEACTIONstringCreate User
createdateP6RISKRESPONSEACTIONdateCreate Date
SKeyP6RISKRESPONSEACTIONintSKey generated key on RiskMitigation
P6RISKRESPONSEACTIONIMPACTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RiskResponseActionObjectIdP6RiskResponseActionImpactriskmitimpmitigation_idintegerThe unique id of the associated risk response action.
ProjectObjectIdP6RiskResponseActionImpactriskmitimpproj_idintegerThe unique ID of the associated project.
RiskThresholdObjectIdP6RiskResponseActionImpactriskmitimpscoretype_idintegerThe unique ID of the associated Risk Threshold.
RiskThresholdLevelObjectIdP6RiskResponseActionImpactriskmitimpthreshold_idintegerThe unique ID of the associated Risk Threshold Level.
IsBaselineP6RiskResponseActionImpactstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6RiskResponseActionImpactstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6RISKRESPONSEACTIONIMPACTstringLast Update User
lastupdatedateP6RISKRESPONSEACTIONIMPACTdateLast Update Date
createuserP6RISKRESPONSEACTIONIMPACTstringCreate User
createdateP6RISKRESPONSEACTIONIMPACTdateCreate Date
SKeyP6RISKRESPONSEACTIONIMPACTintSKey generated key on RiskMitigationImpact
P6RISKRESPONSEPLANTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RiskResponsePlanriskrspplnresponse_idintegerThe unique ID generated by the system.
RiskObjectIdP6RiskResponsePlanriskrspplnrisk_idintegerThe unique ID of the associated risk.
ProjectObjectIdP6RiskResponsePlanriskrspplnproj_idintegerThe unique ID of the associated project.
IdP6RiskResponsePlanriskrspplnidstringThe ID of the risk response plan. This must be unique within the assigned risk.
NameP6RiskResponsePlanriskrspplnnamestringThe name of the risk response plan.
IsActiveP6RiskResponsePlanriskrspplnusedstringThe indication of whether the response plan is currently active for the associated risk. Only one response plan can be active at a given time for a risk.
ResponseTypeP6RiskResponsePlanriskrspplntypestringThe risk response plan type. If the risk is a threat, the valid types are 'Avoid', 'Transfer', 'Reduce', and 'Accept'. If the risk is a opportunity, the valid types are 'Exploit', 'Facilitate', 'Enhance', and 'Reject'.
ActualCostP6RiskResponsePlandoubleThe actual cost.
RemainingCostP6RiskResponsePlandoubleThe remaining cost associated with the risk response action.
PlannedCostP6RiskResponsePlandoubleThe planned cost.
StartDateP6RiskResponsePlandateThe start date of the risk response action. If an activity is assigned, the risk response action uses the activity start date.
FinishDateP6RiskResponsePlandateThe finish date of the risk response action. If an activity is assigned, the risk response action uses the activity finish date.
PlannedStartDateP6RiskResponsePlandateThe planned start date.
PlannedFinishDateP6RiskResponsePlandateThe planned finish date.
ScoreP6RiskResponsePlaninteger The risk score from the numeric PID after all response actions of the response plan have been completed. The post response plan score is set from the response action with the latest finish date and the lowest score when more than one response action has the same date.
ScoreTextP6RiskResponsePlanstring The risk score from the alphanumeric PID after all response actions of the response plan have been completed. The post response plan score is set from the response action with the latest finish date and the lowest score when more than one response action has the same date.
ScoreColorP6RiskResponsePlanstringThe color of the tolerance threshold for the score value.
IsBaselineP6RiskResponsePlanstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6RiskResponsePlanstringThe boolean value indicating if this business object is related to a template Project.
lastupdateuserP6RISKRESPONSEPLANstringLast Update User
lastupdatedateP6RISKRESPONSEPLANdateLast Update Date
createuserP6RISKRESPONSEPLANstringCreate User
createdateP6RISKRESPONSEPLANdateCreate Date
SKeyP6RISKRESPONSEPLANintSKey generated key on RiskResponsePlan
P6RISKMATRIXSCORETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
matrixidP6RISKMATRIXSCORETYPEintegerRISKMATRIXSCORETYPE -MatrixId maps to MTXSCRTYP.matrix_id
scoretypeidP6RISKMATRIXSCORETYPEintegerRISKMATRIXSCORETYPE- ScoreTypeId maps to MTXSCRTYP.scoretype_id
lastupdateuserP6RISKMATRIXSCORETYPEstringLast Update User
lastupdatedateP6RISKMATRIXSCORETYPEdateLast Update Date
createuserP6RISKMATRIXSCORETYPEstringCreate User
createdateP6RISKMATRIXSCORETYPEdateCreate Date
SKeyP6RISKMATRIXSCORETYPEintSKey generated key on RiskMatrixScoreType
P6RISKSCORETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
scoretypeidP6RISKSCORETYPEintegerRISKSCORETYPE- ScoreTypeId maps to RISKSCRTYP.scoretype_id
nameP6RISKSCORETYPEstringRISKSCORETYPE - Name maps to RISKSCRTYP.name
scoretypeP6RISKSCORETYPEstringRISKSCORETYPE - ScoreType maps to RISKSCRTYP.status
lastupdateuserP6RISKSCORETYPEstringLast Update User
lastupdatedateP6RISKSCORETYPEdateLast Update Date
createuserP6RISKSCORETYPEstringCreate User
createdateP6RISKSCORETYPEdateCreate Date
SKeyP6RISKSCORETYPEintSKey generated key on RiskScoreType
P6RISKMATRIXSCORETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RiskMatrixScoreriskmtxscrscore_idintegerThe unique ID generated by the system.
riskscorematrixobjectidP6RISKMATRIXSCOREintegerRISKMATRIXSCORE - ObjectId maps to RISKMTXSCR.RiskScoreMatrixObjectId
ProbabilityThresholdLevelP6RiskMatrixScoreriskmtxscrprobability_threshold_levelintegerThe level number of the probability threshold. Valid numbers are 1-9.
Severity1P6RiskMatrixScoreRISKMTXSCRintegerThe first severity level of the Risk Matrix Score.
Severity2P6RiskMatrixScoreRISKMTXSCRintegerThe second severity level of the Risk Matrix Score.
Severity3P6RiskMatrixScoreRISKMTXSCRintegerThe third severity level of the Risk Matrix Score.
Severity4P6RiskMatrixScoreRISKMTXSCRintegerThe fourth severity level of the Risk Matrix Score.
Severity5P6RiskMatrixScoreRISKMTXSCRintegerThe fifth severity level of the Risk Matrix Score.
Severity6P6RiskMatrixScoreRISKMTXSCRintegerThe sixth severity level of the Risk Matrix Score.
Severity7P6RiskMatrixScoreRISKMTXSCRintegerThe seventh severity level of the Risk Matrix Score.
Severity8P6RiskMatrixScoreRISKMTXSCRintegerThe eighth severity level of the Risk Matrix Score.
Severity9P6RiskMatrixScoreRISKMTXSCRintegerThe ninth severity level of the Risk Matrix Score.
Severity1LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the first severity level.
Severity2LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the second severity level.
Severity3LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the third severity level.
Severity4LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the forth severity level.
Severity5LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the fith severity level.
Severity6LabelP6RiskMatrixScoreRISKMTXSCRstringThe sixth for the first severity level.
Severity7LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the seventh severity level.
Severity8LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the eighth severity level.
Severity9LabelP6RiskMatrixScoreRISKMTXSCRstringThe label for the ninth severity level.
lastupdateuserP6RISKMATRIXSCOREstringLast Update User
lastupdatedateP6RISKMATRIXSCOREdateLast Update Date
createuserP6RISKMATRIXSCOREstringCreate User
createdateP6RISKMATRIXSCOREdateCreate Date
SKeyP6RISKMATRIXSCOREintSKey generated key on RiskMatrixScore
P6RISKSCOREMATRIXTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6RISKSCOREMATRIXintegerRISKSCOREMATRIX - ObjectId maps to RISKSCRMTX.matrix_id
nameP6RISKSCOREMATRIXstringRISKSCOREMATRIX - Name maps to RISKSCRMTX.name
descriptionP6RISKSCOREMATRIXstringRISKSCOREMATRIX - Description maps to RISKSCRMTX.description
riskscoringmethodP6RISKSCOREMATRIXstringRISKSCOREMATRIX- RiskScoringMethod maps to RISKSCRMTX.method
impact_levelsP6RISKSCOREMATRIXintegerRISKSCOREMATRIX - impact_levels maps to RISKSCRMTX.impact_levels
probability_levelsP6RISKSCOREMATRIXintegerRISKSCOREMATRIX - probability_levels maps to RISKSCRMTX.probability_levels
lastupdateuserP6RISKSCOREMATRIXstringLast Update User
lastupdatedateP6RISKSCOREMATRIXdateLast Update Date
createuserP6RISKSCOREMATRIXstringCreate User
createdateP6RISKSCOREMATRIXdateCreate Date
SKeyP6RISKSCOREMATRIXintSKey generated key on RiskScoreMatrix
P6RISKTHRESHOLDLEVELTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RiskThresholdLevelriskscrthrthreshold_idintegerThe unique ID generated by the system.
RiskThresholdObjectIdP6RiskThresholdLevelriskscrthrscoretype_idintegerThe unique ID of the associated Risk Threshold.
CodeP6RiskThresholdLevelriskscrthrshort_namestringThe 10 character code for the threshold level. Must be unique.
NameP6RiskThresholdLevelriskscrthrfull_namestringThe 40 character name for the threshold level. Does not need to be unique.
ColorP6RiskThresholdLevelriskscrthrcolorstringThe Hex representation for the color e.g. 0xFFFFFF.
riskscorelevelP6RISKTHRESHOLDLEVELintegerRISKTHRESHOLDLEVEL- RiskScoreLevel maps to RISKSCRTHR.lvl
valueP6RISKTHRESHOLDLEVELstringRISKTHRESHOLDLEVEL- Range maps to RISKSCRTHR.value
ToleranceRangeP6RiskThresholdLevelriskscrthrtolerance_valueintegerThe tolerance range of the threshold level.
CostRangeP6RiskThresholdLevelriskscrthrcost_valuedoubleThe cost range of the threshold level.
ScheduleRangeP6RiskThresholdLevelriskscrthrschedule_valuedoubleThe schedule range of the threshold level.
probabiltyrangeP6RISKTHRESHOLDLEVELdoubleRISKTHRESHOLDLEVEL- ProbabilityRange maps to RISKSCRTHR.probability_value
lastupdateuserP6RISKTHRESHOLDLEVELstringLast Update User
lastupdatedateP6RISKTHRESHOLDLEVELdateLast Update Date
createuserP6RISKTHRESHOLDLEVELstringCreate User
createdateP6RISKTHRESHOLDLEVELdateCreate Date
SKeyP6RISKTHRESHOLDLEVELintSKey generated key on RiskThresholdLevel
P6PROJECTSECURITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RDBMSUSERIDP6PROJECTSECURITYinteger
PROJECTOBJECTIDP6PROJECTSECURITYinteger
COSTFLAGP6PROJECTSECURITYstring
lastupdatedateP6PROJECTSECURITYdateLast Update Date
P6PROJECTSPENDINGPLANTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ProjectSpendingPlanwbsbudgwbs_budg_idintegerThe unique ID generated by the system.
ProjectObjectIdP6ProjectSpendingPlanwbsbudgproj_idintegerThe unique ID of the associated project for this project spending plan.
WBSObjectIdP6ProjectSpendingPlanwbsbudgwbs_idintegerThe unique ID of the associated WBS for this project spending plan.
spendingplandateP6PROJECTSPENDINGPLANdateProjectSpendingPlan - SpendingPlanDate maps to WBSBUDG.start_date
SpendingPlanP6ProjectSpendingPlanwbsbudgspend_costdoubleThe editable total monthly expenditure for the project.
BenefitPlanP6ProjectSpendingPlanwbsbudgbenefit_costdoubleThe editable monthly profit portion for each month for the project.
IsBaselineP6ProjectSpendingPlanstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ProjectSpendingPlanstringThe boolean value indicating if this business object is related to a template Project.
ProjectIdP6ProjectSpendingPlanprojectproj_short_namestringThe Project short code that uniquely identifies the project.
WBSCodeP6ProjectSpendingPlanprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
WBSNameP6ProjectSpendingPlanprojwbswbs_namestringThe name of the WBS element.
lastupdateuserP6PROJECTSPENDINGPLANstringLast Update User
lastupdatedateP6PROJECTSPENDINGPLANdateLast Update Date
createuserP6PROJECTSPENDINGPLANstringCreate User
createdateP6PROJECTSPENDINGPLANdateCreate Date
SKeyP6PROJECTSPENDINGPLANintSKey generated key on ProjectSpendingPlan
P6PROJECTSPREADTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6PROJECTSPREADinteger
IdP6PROJECTSPREADstring
NameP6PROJECTSPREADstring
ParentEPSObjectIdP6PROJECTSPREADinteger
ObsObjectIdP6PROJECTSPREADinteger
ObsNameP6PROJECTSPREADstring
StartDateP6PROJECTSPREADdate
EndDateP6PROJECTSPREADdate
ActualLaborUnitsP6PROJECTSPREADdouble
ActualNonlaborUnitsP6PROJECTSPREADdouble
AtCompletionLaborUnitsP6PROJECTSPREADdouble
AtCompletionNonlaborUnitsP6PROJECTSPREADdouble
BaselinePlannedLaborUnitsP6PROJECTSPREADdouble
BaselinePlannedNonlaborUnitsP6PROJECTSPREADdouble
EarnedValueLaborUnitsP6PROJECTSPREADdouble
EstimateAtCompletionLaborUnitsP6PROJECTSPREADdouble
EstimateToCompleteLaborUnitsP6PROJECTSPREADdouble
PlannedLaborUnitsP6PROJECTSPREADdouble
PlannedNonlaborUnitsP6PROJECTSPREADdouble
PlannedValueLaborUnitsP6PROJECTSPREADdouble
RemainingLaborUnitsP6PROJECTSPREADdouble
RemainingNonlaborUnitsP6PROJECTSPREADdouble
ActualCostP6PROJECTSPREADdouble
ActualExpenseCostP6PROJECTSPREADdouble
ActualLaborCostP6PROJECTSPREADdouble
ActualMaterialCostP6PROJECTSPREADdouble
ActualNonlaborCostP6PROJECTSPREADdouble
ActualTotalCostP6PROJECTSPREADdouble
AtCompletionExpenseCostP6PROJECTSPREADdouble
AtCompletionLaborCostP6PROJECTSPREADdouble
AtCompletionMaterialCostP6PROJECTSPREADdouble
AtCompletionNonlaborCostP6PROJECTSPREADdouble
AtCompletionTotalCostP6PROJECTSPREADdouble
BaselinePlannedExpenseCostP6PROJECTSPREADdouble
BaselinePlannedLaborCostP6PROJECTSPREADdouble
BaselinePlannedMaterialCostP6PROJECTSPREADdouble
BaselinePlannedNonlaborCostP6PROJECTSPREADdouble
BaselinePlannedTotalCostP6PROJECTSPREADdouble
EarnedValueCostP6PROJECTSPREADdouble
EstimateAtCompletionCostP6PROJECTSPREADdouble
EstimateToCompleteCostP6PROJECTSPREADdouble
PlannedExpenseCostP6PROJECTSPREADdouble
PlannedLaborCostP6PROJECTSPREADdouble
PlannedMaterialCostP6PROJECTSPREADdouble
PlannedNonlaborCostP6PROJECTSPREADdouble
PlannedTotalCostP6PROJECTSPREADdouble
PlannedValueCostP6PROJECTSPREADdouble
RemainingExpenseCostP6PROJECTSPREADdouble
RemainingLaborCostP6PROJECTSPREADdouble
RemainingMaterialCostP6PROJECTSPREADdouble
RemainingNonlaborCostP6PROJECTSPREADdouble
RemainingTotalCostP6PROJECTSPREADdouble
SKeyP6PROJECTSPREADnumber
P6RELATIONSHIPTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Relationshiptaskpredtask_pred_idintegerThe unique ID generated by the system.
SuccessorActivityObjectIdP6Relationshiptaskpredtask_idintegerThe unique ID of the successor activity.
PredecessorActivityObjectIdP6Relationshiptaskpredpred_task_idintegerThe unique ID of the predecessor activity.
SuccessorProjectObjectIdP6Relationshiptaskpredproj_idintegerThe unique ID of the project that owns the successor activity.
PredecessorProjectObjectIdP6Relationshiptaskpredpred_proj_idintegerThe unique ID of the project that owns the predecessor activity.
TypeP6Relationshiptaskpredpred_typestringThe type of relationship: 'Finish to Start', 'Finish to Finish', 'Start to Start', or 'Start to Finish'.
LagP6Relationshiptaskpredlag_hr_cntdoubleThe time lag of the relationship. This is the time lag between the predecessor activity's start or finish date and the successor activity's start or finish date, depending on the relationship type. The time lag is based on the successor activity's calendar. This value is specified by the project manager and is used by the project scheduler when scheduling activities.
IsPredecessorBaselineP6RelationshipstringThe YesNo value indicating if the predecessor activity is related to a Project or Baseline
IsSuccessorBaselineP6RelationshipstringThe YesNo value indicating if the successor activity is related to a Project or Baseline
IsPredecessorTemplateP6RelationshipstringThe boolean value indicating if this business object is related to a template Project.
IsSuccessorTemplateP6RelationshipstringThe boolean value indicating if this business object is related to a template Project.
PredecessorActivityIdP6Relationshipalias_tasktask_codestringThe activity ID of the predecessor activity.
PredecessorActivityNameP6Relationshipalias_tasktask_namestringThe name of the predecessor activity.
PredecessorProjectIdP6Relationshipalias_projectproj_short_namestringThe project ID of the project that owns the predecessor activity.
SuccessorActivityIdP6Relationshiptasktask_codestringThe activity ID of the successor activity.
SuccessorActivityNameP6Relationshiptasktask_namestringThe name of the successor activity.
SuccessorProjectIdP6Relationshipprojectproj_short_namestringThe project ID of the project that owns the successor activity.
lastupdateuserP6RELATIONSHIPstringLast Update User
lastupdatedateP6RELATIONSHIPdateLast Update Date
createuserP6RELATIONSHIPstringCreate User
createdateP6RELATIONSHIPdateCreate Date
SKeyP6RELATIONSHIPintSKey generated key on Relationship
P6RELEASETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6RELEASEintegerRELEASE primary key maps to RELEASE.release_id
nameP6RELEASEstringRELEASE - name maps to RELEASE.release_name
startdateP6RELEASEdateRELEASE - RELEASEdate maps to RELEASE.start_date
releasethemeP6RELEASEstringRELEASE - maps to RELEASE.release_theme
lastupdateuserP6RELEASEstringLast Update User
lastupdatedateP6RELEASEdateLast Update Date
createuserP6RELEASEstringCreate User
createdateP6RELEASEdateCreate Date
P6RELEASEPROJECTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
releaseobjectidP6RELEASEPROJECTintegerSNAPPROJ primary key maps to RELPROJ.release_id
projectobjectidP6RELEASEPROJECTintegerSNAPPROJ primary key maps to RELPROJ.proj_id
lastupdateuserP6RELEASEPROJECTstringLast Update User
lastupdatedateP6RELEASEPROJECTdateLast Update Date
createuserP6RELEASEPROJECTstringCreate User
createdateP6RELEASEPROJECTdateCreate Date
P6RELEASEITERATIONTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
releaseobjectidP6RELEASEITERATIONintegerRELITER primary key maps to RELITER.release_id
projectobjectidP6RELEASEITERATIONintegerRELITER foreign key maps to RELPROJ.proj_id
iterationobjectidP6RELEASEITERATIONintegerRELITER primary key maps to RELITER.iteration_id
lastupdateuserP6RELEASEITERATIONstringLast Update User
lastupdatedateP6RELEASEITERATIONdateLast Update Date
createuserP6RELEASEITERATIONstringCreate User
createdateP6RELEASEITERATIONdateCreate Date
P6REPORTDATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
DateNameP6REPORTDATEinteger
DayDateP6REPORTDATEdate
DayNameP6REPORTDATEstring
DayOfMonthP6REPORTDATEinteger
DayOfYearP6REPORTDATEinteger
OrdinalDayOfMonthP6REPORTDATEstring
OrdinalDayOfYearP6REPORTDATEstring
WeekBeginDateP6REPORTDATEdate
DayOfWeekP6REPORTDATEinteger
WeekNumberP6REPORTDATEinteger
MonthNumberP6REPORTDATEinteger
MonthNameP6REPORTDATEstring
MonthShortNameP6REPORTDATEstring
MonthEndDateP6REPORTDATEdate
DaysInMonthP6REPORTDATEinteger
YearMonthP6REPORTDATEinteger
QuarterNumberP6REPORTDATEinteger
QuarterNameP6REPORTDATEstring
YearP6REPORTDATEinteger
ETLProcessP6REPORTDATEdate
ETLUserP6REPORTDATEstring
SKeyP6REPORTDATEinteger
P6REPORTTIMETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
CivilianTimeP6REPORTTIMEstring
MilitaryTimeP6REPORTTIMEstring
TwoCharP6REPORTTIMEstring
TimeNameP6REPORTTIMEstring
TimeOfDayP6REPORTTIMEinteger
ETLProcessP6REPORTTIMEdate
ETLUserP6REPORTTIMEstring
SKeyP6REPORTTIMEinteger
P6RESASSIGNMENTPERIODACTUALTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
financialperiodobjectidP6RESASSIGNMENTPERIODACTUALintegerResAssignmentPeriodActual - FinancialPeriodObjectId maps to TRSRCFIN.fin_dates_id
startdateP6RESASSIGNMENTPERIODACTUALdatestart Date
enddateP6RESASSIGNMENTPERIODACTUALdateend Date
resourceassignmentobjectidP6RESASSIGNMENTPERIODACTUALintegerResAssignmentPeriodActual - ResourceAssignmentObjectId maps to TRSRCFIN.taskrsrc_id
activityobjectidP6RESASSIGNMENTPERIODACTUALintegerResAssignmentPeriodActual - ActivityObjectId maps to TRSRCFIN.task_id
projectobjectidP6RESASSIGNMENTPERIODACTUALintegerResAssignmentPeriodActual - ProjectObjectId maps to TRSRCFIN.proj_id
actualunitsP6RESASSIGNMENTPERIODACTUALdoubleResAssignmentPeriodActual - ActualUnits maps to TRSRCFIN.act_qty
actualcostP6RESASSIGNMENTPERIODACTUALdoubleResAssignmentPeriodActual - ActualCost maps to TRSRCFIN.act_cost
isbaselineP6RESASSIGNMENTPERIODACTUALstringResAssignmentPeriodActual - IsBaseline maps to TRSRCFIN.IsBaseline
istemplateP6RESASSIGNMENTPERIODACTUALstringResAssignmentPeriodActual - IsTemplate maps to TRSRCFIN.IsTemplate
resourcetypeP6RESASSIGNMENTPERIODACTUALstringResAssignmentPeriodActual - ResourceType maps to trsrcfin.ResourceType
wbsobjectidP6RESASSIGNMENTPERIODACTUALintegerResAssignmentPeriodActual - WBSObjectId maps to trsrcfin.WBSObjectId
resourceobjectidP6RESASSIGNMENTPERIODACTUALintegerFK to TASKRSRC table - identifies the resource
roleobjectidP6RESASSIGNMENTPERIODACTUALintegerFK to TASKRSRC table - identifies the resource
lastupdateuserP6RESASSIGNMENTPERIODACTUALstringLast Update User
lastupdatedateP6RESASSIGNMENTPERIODACTUALdateLast Update Date
createuserP6RESASSIGNMENTPERIODACTUALstringCreate User
createdateP6RESASSIGNMENTPERIODACTUALdateCreate Date
SKeyP6RESASSIGNMENTPERIODACTUALintSKey generated key on ResAssignmentPeriodActual
P6RESOURCEACCESSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
UserObjectIdP6ResourceAccessrsrcsecuser_idintegerThe unique ID of the associated user.
ResourceObjectIdP6ResourceAccessrsrcsecrsrc_idintegerThe unique ID of the associated resource.
ResourceIdP6ResourceAccessrsrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6ResourceAccessrsrcrsrc_namestringThe name of the resource.
UserNameP6ResourceAccessusersuser_namestringThe user's login name.
lastupdatedateP6RESOURCEACCESSdateLast Update Date
SKeyP6RESOURCEACCESSintSKey generated key on ResourceAccess
P6RESOURCEASSIGNMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceAssignmenttaskrsrctaskrsrc_idintegerThe unique ID generated by the system.
ActivityObjectIdP6ResourceAssignmenttaskrsrctask_idintegerThe unique ID of the activity to which the resource is assigned.
ProjectObjectIdP6ResourceAssignmenttaskrsrcproj_idintegerThe unique ID of the associated project.
ResourceTypeP6ResourceAssignmenttaskrsrcrsrc_typestringThe resource type: "Labor", "Nonlabor", or "Material".
IsCostUnitsLinkedP6ResourceAssignmenttaskrsrccost_qty_link_flagstringThe flag that determines whether or not cost should be calculated based on units.
RoleObjectIdP6ResourceAssignmenttaskrsrcrole_idintegerThe unique ID of the role the resource is performing on this activity. A resource may be assigned to the same activity more than once, performing different roles. The project manager controls whether the same resource can be assigned to an activity more than once.
CostAccountObjectIdP6ResourceAssignmenttaskrsrcacct_idintegerThe unique ID of the cost account associated with this resource assignment.
ResourceObjectIdP6ResourceAssignmenttaskrsrcrsrc_idintegerThe unique ID of the associated resource.
ProficiencyP6ResourceAssignmentstringThe skill level that is associated with the role. The values are 'Master', 'Expert', 'Skilled', 'Proficient', and 'Inexperienced'. If the current user does not have the ViewResourceRoleProficiency global security privilege, this field may not be accessed.
PendingPercentCompleteP6ResourceAssignmenttaskrsrcpend_complete_pctdoubleThe estimate of the percentage of the resource's units of work completed on this activity. The pending percent complete is entered by each resource using Timesheets. This value is used to compute the resource's remaining units for the activity when project actuals are applied. The project manager specifies whether resources update their percent complete or remaining units for each project.
RemainingUnitsP6ResourceAssignmenttaskrsrcremain_qtydoubleThe remaining units of work to be performed by this resource on this activity. Before the activity is started, the remaining units are the same as the planned units. After the activity is completed, the remaining units are zero.
PendingRemainingUnitsP6ResourceAssignmenttaskrsrcpend_remain_qtydoubleThe estimate of the resource's remaining units on this activity. The pending remaining units is entered by each resource using Timesheets. This value is copied to the resource's remaining units for the activity when project actuals are applied. The project manager specifies whether resources update their percent complete or remaining units for each project.
PlannedUnitsP6ResourceAssignmenttaskrsrctarget_qtydoubleThe planned units of work for the resource assignment on the activity. This field is named BudgetedUnits in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
RemainingUnitsPerTimeP6ResourceAssignmenttaskrsrcremain_qty_per_hrdoubleThe units per time at which the resource will be performing work on the remaining portion of this activity. For example, a person assigned full time would perform 8 hours of work per day. A department of five people may perform at 5 days per day.
PendingActualRegularUnitsP6ResourceAssignmenttaskrsrcpend_act_reg_qtydoubleThe actual nonovertime units worked by the resource on this activity. This value is computed from values entered by a user in the Progress Reporter application and is applied to the resource assignment when the Apply Actuals service is invoked.
PlannedLagP6ResourceAssignmenttaskrsrctarget_lag_drtn_hr_cntdoubleThe planned time lag between the activity's planned start date and the resource's planned start date on the activity. If the resource is planned to start work when the activity is planned to start, the planned lag is zero. This field is named BudgetedLag in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PlannedUnitsPerTimeP6ResourceAssignmenttaskrsrctarget_qty_per_hrdoubleThe planned units per time at which the resource is to perform work on this activity. For example, a person assigned full time would perform 8 hours of work per day. A department of five people may perform at 5 days per day. This field is named BudgetedUnitsPerTime in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
ActualOvertimeUnitsP6ResourceAssignmenttaskrsrcact_ot_qtydoubleThe actual overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
PendingActualOvertimeUnitsP6ResourceAssignmenttaskrsrcpend_act_ot_qtydoubleThe actual overtime units worked by the resource on this activity. This value is computed from values entered by a user in the Progress Reporter application and is applied to the resource assignment when the Apply Actuals service is invoked.
ActualRegularUnitsP6ResourceAssignmenttaskrsrcact_reg_qtydoubleThe actual non-overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager.
RemainingLagP6ResourceAssignmentnumberThe time lag between the activity's remaining start date and the resource's remaining start date on the activity. If the resource's remaining work starts on the activity's remaining start date, the lag is zero. Before the activity is started, the remaining lag is the same as the planned lag.
OvertimeFactorP6ResourceAssignmenttaskrsrcot_factordoubleThe overtime factor used to compute the overtime price for the resource assignment on this activity. Overtime price = standard price * overtime factor. When the resource is assigned to the activity, the resource's overtime factor is copied to the assignment. The assignment overtime factor is refreshed from the resource value when resource prices are synchronized for the project.
PlannedCostP6ResourceAssignmenttaskrsrctarget_costdoubleThe planned cost for the resource assignment on the activity. Computed as planned cost = planned units * price per time. This field is named BudgetedCost in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
ActualRegularCostP6ResourceAssignmenttaskrsrcact_reg_costdoubleThe actual non-overtime cost for the resource assignment on the activity. Computed as actual regular cost = actual regular units * cost per time.
ActualOvertimeCostP6ResourceAssignmenttaskrsrcact_ot_costdoubleThe actual overtime cost for the resource assignment on the activity. Computed as actual overtime cost = actual overtime units * cost per time * overtime factor.
RemainingCostP6ResourceAssignmenttaskrsrcremain_costdoubleThe remaining cost for the resource assignment on the activity. Computed as remaining cost = remaining units * cost per time.
ActualStartDateP6ResourceAssignmenttaskrsrcact_start_datedateThe date the resource actually started working on the activity.
ActualFinishDateP6ResourceAssignmenttaskrsrcact_end_datedateThe date the resource actually finished working on the activity.
RemainingStartDateP6ResourceAssignmenttaskrsrcrestart_datedateThe date the resource is scheduled to begin the remaining work for the activity. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date.
RemainingFinishDateP6ResourceAssignmenttaskrsrcreend_datedateThe date the resource is scheduled to finish the remaining work for the activity. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date.
PlannedStartDateP6ResourceAssignmenttaskrsrctarget_start_datedateThe date the resource is scheduled to begin working on the activity. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started. This is the start date that Timesheets users follow and schedule variance is measured against.
PlannedFinishDateP6ResourceAssignmenttaskrsrctarget_end_datedateThe date the resource is scheduled to finish working on the activity. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started. This is the finish date that Timesheets users follow and schedule variance is measured against.
RemainingLateStartDateP6ResourceAssignmenttaskrsrcrem_late_start_datedateThe remaining late start date calculated by the scheduler.
RemainingLateFinishDateP6ResourceAssignmenttaskrsrcrem_late_end_datedateThe remaining late finish date calculated by the scheduler.
RateTypeP6ResourceAssignmenttaskrsrcrate_typestringThe rate type that determines which of the five prices specified for the resource will be used to calculate the cost for the resource assignment. Valid values are 'Price / Unit', 'Price / Unit2', 'Price / Unit3', 'Price / Unit4', 'Price / Unit5', and 'None'.
ActualThisPeriodCostP6ResourceAssignmenttaskrsrcact_this_per_costdoubleThe actual this period cost (will be labor or nonlabor).
ActualThisPeriodUnitsP6ResourceAssignmenttaskrsrcact_this_per_qtydoubleThe actual this period units (hours) (will be labor or nonlabor).
ResourceCurveObjectIdP6ResourceAssignmenttaskrsrccurv_idintegerThe unique ID of the resource curve.
DrivingActivityDatesFlagP6ResourceAssignmenttaskrsrcrollup_dates_flagstringThe flag indicating whether new resource/role assignments drive activity dates, by default.
RateSourceP6ResourceAssignmenttaskrsrccost_per_qty_source_typestringThe value that indicates which price/unit will be used to calculate costs for the assignment, such as 'Resource', 'Role', and 'Override'. When a resource and only a resource is assigned to an activity, the rate source will automatically equal 'Resource'. When a role and only a role is assigned to an activity, the rate source will automatically equal 'Role'. When both a resource and role are assigned to the activity, the rate source can be either 'Resource' or 'Role' determined by the RateSourcePreference. In any case, the 'Override' value allows you to specify any other price/unit.
IsBaselineP6ResourceAssignmentTASKRSRCstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ResourceAssignmentTASKRSRCstringThe boolean value indicating if this business object is related to a template Project.
ActivityIdP6ResourceAssignmenttasktask_codestringThe short ID that uniquely identifies the activity within the project.
ActivityNameP6ResourceAssignmenttasktask_namestringThe name of the activity. The activity name does not have to be unique.
ActualCostP6ResourceAssignmentTASKRSRCnumberThe actual non-overtime plus overtime cost for the resource assignment on the activity. Computed as actual cost = actual regular cost + actual overtime cost.
ActualDurationP6ResourceAssignmentnumberThe actual duration for the resource assignment on the activity.
ActualUnitsP6ResourceAssignmentTASKRSRCnumberThe actual non-overtime plus overtime units worked by the resource on this activity. This value is computed from timesheets when project actuals are applied or may be entered directly by the project manager. Computed as actual units = actual regular units + actual overtime units.
AtCompletionCostP6ResourceAssignmentTASKRSRCnumberThe sum of the actual plus remaining costs for the resource assignment on the activity.
AtCompletionDurationP6ResourceAssignmentnumberthe total working time from the activity's current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activity's calendar.
AtCompletionUnitsP6ResourceAssignmentTASKRSRCnumberThe sum of the actual plus remaining units for the resource assignment on the activity.
AutoComputeActualsP6ResourceAssignmentrsrcauto_compute_act_flagstringThe option that determines whether the activity's actual and remaining units, start date, finish date, and percent complete are computed automatically using the planned dates, planned units and the schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. Use this option to assume that all work for the activity proceeds according to plan.
CalendarObjectIdP6ResourceAssignmentTASKRSRCintegerThe unique ID generated by the system for the calendar associated with the resource assignment.
CostAccountIdP6ResourceAssignmentaccountacct_short_namestringThe id of associated cost account.
CostAccountNameP6ResourceAssignmentaccountacct_namestringThe name of the associated cost account.
FinishDateP6ResourceAssignmentdateThe finish date of the resource assignment on the activity. Set to the remaining finish date until the activity is completed, then set to the actual finish date.
IsActiveP6ResourceAssignmentrsrcactive_flagstringThe flag that indicates whether this resource assignment is active.
IsOvertimeAllowedP6ResourceAssignmentrsrcot_flagstringThe flag that indicates whether the resource is allowed to log overtime hours.
IsPrimaryResourceP6ResourceAssignmentstringThe flag that indicates whether this resource is the activity's primary resource.
PlannedDurationP6ResourceAssignmentnumberThe planned working time for the resource assignment on the activity, from the resource's planned start date to the planned finish date. This field is named BudgetedDuration in Primavera's Engineering & Construction and Maintenance & Turnaround solutions.
PricePerUnitP6ResourceAssignmentnumberThe price per time for the resource on this activity. This price is used to compute the resource's cost for the activity. When the resource is assigned to the activity, the resource's price is copied to the assignment based on the effective date of the price and the activity start date. The assignment price is refreshed whenever resource prices are synchronized for the project.
ProjectIdP6ResourceAssignmentprojectproj_short_namestringThe short code that uniquely identifies the project.
RemainingDurationP6ResourceAssignmentnumberThe remaining duration of the resource assignment. The remaining duration is the remaining working time for the resource assignment on the activity, from the resource's remaining start date to the remaining finish date. The remaining working time is computed using the calendar determined by the activity Type. Resource Dependent activities use the resource's calendar, other activity types use the activity's calendar. Before the activity is started, the remaining duration is the same as the Original duration. After the activity is completed, the remaining duration is zero.
ResourceCurveNameP6ResourceAssignmentrsrccurvcurv_namestringThe name of the resource curve that determines how resources and costs are distributed over time for this activity.
ResourceIdP6ResourceAssignmentrsrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6ResourceAssignmentrsrcrsrc_namestringThe name of the resource.
RoleIdP6ResourceAssignmentrolesrole_short_namestringThe short code that uniquely identifies the role.
RoleNameP6ResourceAssignmentrolesrole_namestringThe name of the role. The role name uniquely identifies the role.
StaffedRemainingCostP6ResourceAssignmentTASKRSRCnumberThe time distribution of the resource's remaining cost for resource assignments that have filled a role.
StaffedRemainingUnitsP6ResourceAssignmentTASKRSRCnumberThe time distribution of the resource's remaining units for resource assignments that have filled a role.
StartDateP6ResourceAssignmentdateThe start date of the resource assignment on the activity. Set to the remaining start date until the activity is started, then set to the actual start date.
UnitsPercentCompleteP6ResourceAssignmentnumberThe percent complete of units for the resource assignment on the activity. Computed as actual units / at completion units * 100. Always in the range 0 to 100.
UnstaffedRemainingCostP6ResourceAssignmentTASKRSRCnumberThe time distribution of the resource's remaining cost for resource assignments that have not filled a role.
UnstaffedRemainingUnitsP6ResourceAssignmentTASKRSRCnumberThe time distribution of the resource's remaining units for resource assignments that have not filled a role.
WBSObjectIdP6ResourceAssignmenttaskwbs_idintegerThe unique ID of the WBS for the activity.
lastupdateuserP6RESOURCEASSIGNMENTstringLast Update User
lastupdatedateP6RESOURCEASSIGNMENTdateLast Update Date
createuserP6RESOURCEASSIGNMENTstringCreate User
createdateP6RESOURCEASSIGNMENTdateCreate Date
lastupdatedatexP6RESOURCEASSIGNMENTdateTaskrsrcX Update Date
SKeyP6RESOURCEASSIGNMENTintSKey generated key on ResourceAssignment
P6ASSIGNMENTCODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6ASSIGNMENTCODEintegerAssignmentCode - ObjectId maps to ASGNMNTCATVAL.asgnmnt_catg_id
codetypeobjectidP6ASSIGNMENTCODEintegerAssignmentCode - CodeTypeObjectId maps to ASGNMNTCATVAL.asgnmnt_catg_type_id
sequencenumberP6ASSIGNMENTCODEintegerAssignmentCode - SequenceNumber maps to ASGNMNTCATVAL.seq_num
codevalueP6ASSIGNMENTCODEstringAssignmentCode - CodeValue maps to ASGNMNTCATVAL.asgnmnt_catg_short_name
descriptionP6ASSIGNMENTCODEstringAssignmentCode - Description maps to ASGNMNTCATVAL.asgnmnt_catg_name
parentobjectidP6ASSIGNMENTCODEintegerAssignmentCode - ParentObjectId maps to ASGNMNTCATVAL.parent_asgnmnt_catg_id
codetypenameP6ASSIGNMENTCODEstringAssignmentCode - CodeTypeName maps to asgnmntcatval.CodeTypeName
issecurecodeP6ASSIGNMENTCODEstringAssignmentCode - IsSecureCode maps to ASGNMNTCATVAL.super_flag
lastupdateuserP6ASSIGNMENTCODEstringLast Update User
lastupdatedateP6ASSIGNMENTCODEdateLast Update Date
createuserP6ASSIGNMENTCODEstringCreate User
createdateP6ASSIGNMENTCODEdateCreate Date
SKeyP6ASSIGNMENTCODEintSKey generated key on AssignmentCode
P6ASSIGNMENTCODETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6ASSIGNMENTCODETYPEintegerASSIGNMENTCODETYPE - ObjectId maps to ASGNMNTCATTYPE.asgnmnt_catg_type_id
sequencenumberP6ASSIGNMENTCODETYPEintegerASSIGNMENTCODETYPE - SequenceNumber maps to ASGNMNTCATTYPE.seq_num
lengthP6ASSIGNMENTCODETYPEintegerASSIGNMENTCODETYPE - Length maps to ASGNMNTCATTYPE.asgnmnt_catg_short_len
nameP6ASSIGNMENTCODETYPEstringASSIGNMENTCODETYPE - Name maps to ASGNMNTCATTYPE.asgnmnt_catg_type
issecurecodeP6ASSIGNMENTCODETYPEstringASSIGNMENTCODETYPE - IsSecureCode maps to ASGNMNTCATTYPE.super_flag
lastupdateuserP6ASSIGNMENTCODETYPEstringLast Update User
lastupdatedateP6ASSIGNMENTCODETYPEdateLast Update Date
createuserP6ASSIGNMENTCODETYPEstringCreate User
createdateP6ASSIGNMENTCODETYPEdateCreate Date
SKeyP6ASSIGNMENTCODETYPEintSKey generated key on ASSIGNMENTCODETYPE
P6ASSIGNMENTCODEASSIGNMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
asgnmntobjectidP6ASSIGNMENTCODEASSIGNMENTintegerAssignmentCodeAssignment - asgnmntobjectid maps to ASGNMNTACAT.taskrsrc_id
asgnmntcodetypeobjectidP6ASSIGNMENTCODEASSIGNMENTintegerAssignmentCodeAssignment - AsgnmntCodeTypeObjectId maps to ASGNMNTACAT.asgnmnt_catg_type_id
asgnmntcodeobjectidP6ASSIGNMENTCODEASSIGNMENTintegerAssignmentCodeAssignment - AsgnmntCodeObjectId maps to ASGNMNTACAT.asgnmnt_catg_id
asgnmntcodedescriptionP6ASSIGNMENTCODEASSIGNMENTstringAssignmentCodeAssignment - AsgnmntCodeDescription maps to ASGNMNTACAT.AsgnmntCodeDescription
asgnmntcodetypenameP6ASSIGNMENTCODEASSIGNMENTstringAssignmentCodeAssignment - AsgnmntCodeTypeName maps to AsgnmntCodeValue.AsgnmntCodeTypeName
asgnmntcodevalueP6ASSIGNMENTCODEASSIGNMENTstringAssignmentCodeAssignment - AsgnmntCodeValue maps to AsgnmntCodeValue.AsgnmntCodeValue
asgnmntidP6ASSIGNMENTCODEASSIGNMENTstringAssignmentCodeAssignment - AsgnmntId maps to ASGNMNTACAT.AsgnmntId
asgnmntnameP6ASSIGNMENTCODEASSIGNMENTstringAssignmentCodeAssignment - AsgnmntName maps to ASGNMNTACAT.AsgnmntName
issecurecodeP6ASSIGNMENTCODEASSIGNMENTstringAssignmentCodeAssignment - IsSecureCode maps to ASGNMNTACAT.super_flag
lastupdateuserP6ASSIGNMENTCODEASSIGNMENTstringLast Update User
lastupdatedateP6ASSIGNMENTCODEASSIGNMENTdateLast Update Date
createuserP6ASSIGNMENTCODEASSIGNMENTstringCreate User
createdateP6ASSIGNMENTCODEASSIGNMENTdateCreate Date
SKeyP6ASSIGNMENTCODEASSIGNMENTintSKey generated key on AssignmentCodeAssignment
P6RESOURCECODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceCodercatvalrsrc_catg_idintegerThe unique ID generated by the system.
CodeTypeObjectIdP6ResourceCodercatvalrsrc_catg_type_idintegerThe unique ID of the parent resource code type.
SequenceNumberP6ResourceCodercatvalseq_numintegerThe sequence number for sorting.
CodeValueP6ResourceCodercatvalrsrc_catg_short_namestringThe value of the resource code.
DescriptionP6ResourceCodercatvalrsrc_catg_namestringThe description of the resource code.
ParentObjectIdP6ResourceCodercatvalparent_rsrc_catg_idintegerThe unique ID of the parent resource code of this resource code in the hierarchy.
CodeTypeNameP6ResourceCodercattypersrc_catg_typestringThe name of the parent code type for this code.
issecurecodeP6RESOURCECODEstringResourceCode - IsSecureCode maps to RCATVAL.super_flag
lastupdateuserP6RESOURCECODEstringLast Update User
lastupdatedateP6RESOURCECODEdateLast Update Date
createuserP6RESOURCECODEstringCreate User
createdateP6RESOURCECODEdateCreate Date
SKeyP6RESOURCECODEintSKey generated key on ResourceCode
P6RESOURCECODEASSIGNMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ResourceObjectIdP6ResourceCodeAssignmentrsrcrcatrsrc_idintegerThe unique ID of the resource to which the resource code is assigned.
ResourceCodeTypeObjectIdP6ResourceCodeAssignmentrsrcrcatrsrc_catg_type_idintegerThe unique ID of the parent resource code type.
ResourceCodeObjectIdP6ResourceCodeAssignmentrsrcrcatrsrc_catg_idintegerThe unique ID of the associated resource code.
ResourceCodeDescriptionP6ResourceCodeAssignmentrcatvalrsrc_catg_namestringThe description of the associated resource code.
ResourceCodeTypeNameP6ResourceCodeAssignmentrcattypersrc_catg_typestringThe name of the parent resource code type.
ResourceCodeValueP6ResourceCodeAssignmentrcatvalrsrc_catg_short_namestringThe value of the associated resource code.
ResourceIdP6ResourceCodeAssignmentrsrcrsrc_short_namestringThe short code that uniquely identifies the associated resource.
ResourceNameP6ResourceCodeAssignmentrsrcrsrc_namestringThe name of the resource to which the resource code is assigned.
issecurecodeP6RESOURCECODEASSIGNMENTstringResourceCodeAssignment - IsSecureCode maps to RSRCRCAT.super_flag
lastupdateuserP6RESOURCECODEASSIGNMENTstringLast Update User
lastupdatedateP6RESOURCECODEASSIGNMENTdateLast Update Date
createuserP6RESOURCECODEASSIGNMENTstringCreate User
createdateP6RESOURCECODEASSIGNMENTdateCreate Date
SKeyP6RESOURCECODEASSIGNMENTintSKey generated key on ResourceCodeAssignment
P6RESOURCECODEHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
CodeTypeObjectIdP6RESOURCECODEHIERARCHYinteger
CodeTypeNameP6RESOURCECODEHIERARCHYstring
CodeTypeSequenceNumberP6RESOURCECODEHIERARCHYinteger
CodeTypeIsSecureP6RESOURCECODEHIERARCHYstring
ParentCodeValueObjectIdP6RESOURCECODEHIERARCHYinteger
ParentCodeValueNameP6RESOURCECODEHIERARCHYstring
ParentCodeValueShortNameP6RESOURCECODEHIERARCHYstring
ParentCodeValueSequenceNumberP6RESOURCECODEHIERARCHYinteger
ChildCodeValueObjectIdP6RESOURCECODEHIERARCHYinteger
ChildCodeValueNameP6RESOURCECODEHIERARCHYstring
ChildCodeValueShortNameP6RESOURCECODEHIERARCHYstring
ChildCodeValueSequenceNumberP6RESOURCECODEHIERARCHYinteger
ParentLevelsBelowRootP6RESOURCECODEHIERARCHYinteger
ChildLevelsBelowRootP6RESOURCECODEHIERARCHYinteger
LevelsBetweenP6RESOURCECODEHIERARCHYinteger
ChildHasChildrenP6RESOURCECODEHIERARCHYstring
FullPathNameP6RESOURCECODEHIERARCHYstring
SKeyP6RESOURCECODEHIERARCHYint
P6RESOURCECODETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceCodeTypercattypersrc_catg_type_idintegerThe unique ID generated by the system.
SequenceNumberP6ResourceCodeTypercattypeseq_numintegerThe sequence number for sorting.
LengthP6ResourceCodeTypercattypersrc_catg_short_lenintegerThe maximum number of characters allowed for values of this resource code.
NameP6ResourceCodeTypercattypersrc_catg_typestringThe name of the resource code type.
IsSecureCodeP6ResourceCodeTypercattypesuper_flagstringthe flag indicating whether this is a secure Resource Code Type.
lastupdateuserP6RESOURCECODETYPEstringLast Update User
lastupdatedateP6RESOURCECODETYPEdateLast Update Date
createuserP6RESOURCECODETYPEstringCreate User
createdateP6RESOURCECODETYPEdateCreate Date
SKeyP6RESOURCECODETYPEintSKey generated key on ResourceCodeType
P6RESOURCECURVETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceCurversrccurvcurv_idintegerThe unique ID generated by the system.
NameP6ResourceCurversrccurvcurv_namestringThe name of the resource curve.
IsDefaultP6ResourceCurversrccurvdefault_flagstringThe flag that identifies the default curve. The default curve can not be edited.
value0P6RESOURCECURVEnumberResourceCurve - Value0 maps to RSRCCURV.value0
value5P6RESOURCECURVEnumberResourceCurve - Value5 maps to RSRCCURV.value5
value10P6RESOURCECURVEnumberResourceCurve - Value10 maps to RSRCCURV.value10
value15P6RESOURCECURVEnumberResourceCurve - Value15 maps to RSRCCURV.value15
value20P6RESOURCECURVEnumberResourceCurve - Value20 maps to RSRCCURV.value20
value25P6RESOURCECURVEnumberResourceCurve - Value25 maps to RSRCCURV.value25
value30P6RESOURCECURVEnumberResourceCurve - Value30 maps to RSRCCURV.value30
value35P6RESOURCECURVEnumberResourceCurve - Value35 maps to RSRCCURV.value35
value40P6RESOURCECURVEnumberResourceCurve - Value40 maps to RSRCCURV.value40
value45P6RESOURCECURVEnumberResourceCurve - Value45 maps to RSRCCURV.value45
value50P6RESOURCECURVEnumberResourceCurve - Value50 maps to RSRCCURV.value50
value55P6RESOURCECURVEnumberResourceCurve - Value55 maps to RSRCCURV.value55
value60P6RESOURCECURVEnumberResourceCurve - Value60 maps to RSRCCURV.value60
value65P6RESOURCECURVEnumberResourceCurve - Value65 maps to RSRCCURV.value65
value70P6RESOURCECURVEnumberResourceCurve - Value70 maps to RSRCCURV.value70
value75P6RESOURCECURVEnumberResourceCurve - Value75 maps to RSRCCURV.value75
value80P6RESOURCECURVEnumberResourceCurve - Value80 maps to RSRCCURV.value80
value85P6RESOURCECURVEnumberResourceCurve - Value85 maps to RSRCCURV.value85
value90P6RESOURCECURVEnumberResourceCurve - Value90 maps to RSRCCURV.value90
value95P6RESOURCECURVEnumberResourceCurve - Value95 maps to RSRCCURV.value95
value100P6RESOURCECURVEnumberResourceCurve - Value100 maps to RSRCCURV.value100
lastupdateuserP6RESOURCECURVEstringLast Update User
lastupdatedateP6RESOURCECURVEdateLast Update Date
createuserP6RESOURCECURVEstringCreate User
createdateP6RESOURCECURVEdateCreate Date
SKeyP6RESOURCECURVEintSKey generated key on ResourceCurve
P6RESOURCEHIERARCHYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ParentObjectIdP6RESOURCEHIERARCHYinteger
ParentSequenceNumberP6RESOURCEHIERARCHYinteger
ParentNameP6RESOURCEHIERARCHYstring
ParentIdP6RESOURCEHIERARCHYstring
ChildObjectIdP6RESOURCEHIERARCHYinteger
ChildSequenceNumberP6RESOURCEHIERARCHYinteger
ChildNameP6RESOURCEHIERARCHYstring
ChildIdP6RESOURCEHIERARCHYstring
ParentLevelsBelowRootP6RESOURCEHIERARCHYinteger
ChildLevelsBelowRootP6RESOURCEHIERARCHYinteger
LevelsBetweenP6RESOURCEHIERARCHYinteger
ChildHasChildrenP6RESOURCEHIERARCHYstring
FullPathNameP6RESOURCEHIERARCHYstring
lastupdatedateP6RESOURCEHIERARCHYdateLast Update Date
SKeyP6RESOURCEHIERARCHYint
P6RESOURCEHOURTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceHourrsrchourrsrc_hr_idintegerThe unique ID generated by the system.
ResourceObjectIdP6ResourceHourrsrchourrsrc_idintegerThe unique ID of the associated resource.
TimesheetPeriodObjectIdP6ResourceHourrsrchourts_idintegerThe unique ID of the associated timesheet.
ActivityTimesheetLinkFlagP6ResourceHourrsrchourtask_ts_flagstringthe value which indicates if the record is a real timesheet entry (false) or simply a placeholder for a timesheet entry (true).
ResourceAssignmentObjectIdP6ResourceHourrsrchourtaskrsrc_idintegerThe unique ID of the associated resource assignment.
OverheadCodeObjectIdP6ResourceHourrsrchournonwork_type_idintegerThe unique ID of the overhead code, if the hours are for an overhead activity.
ProjectObjectIdP6ResourceHourrsrchourproj_idintegerThe unique ID of the associated project.
UnapprovedHoursP6ResourceHourrsrchourpend_hr_cntdoubleThe actual non-overtime units submitted by the resource on the activity. These units remain submitted until the timesheet is approved.
ApprovedHoursP6ResourceHourrsrchourhr_cntdoubleThe number of hours, approved.
UnapprovedOvertimeHoursP6ResourceHourrsrchourpend_ot_hr_cntdoubleThe actual overtime units submitted by the resource on the acitivity. These units remain submitted until the timesheet is approved.
ApprovedOvertimeHoursP6ResourceHourrsrchourot_hr_cntdoubleThe number of overtime hours, approved.
resourcehourdateP6RESOURCEHOURdateResourceHour - ResourceHourDate maps to RSRCHOUR.work_date
StatusP6ResourceHourrsrchourstatus_codestringThe approval level, when timesheets require approval: 'Submitted', 'Approved', 'Resource Manager Approved', 'Project Manager Approved', 'Active', or 'Rejected'.
IsBaselineP6ResourceHourstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6ResourceHourstringThe boolean value indicating if this business object is related to a template Project.
ProjectIdP6ResourceHourprojectproj_short_namestringThe short code that uniquely identifies the project.
ProjectNameP6ResourceHourprojwbswbs_namestringThe name of the associated project.
ResourceIdP6ResourceHourrsrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6ResourceHourrsrcrsrc_namestringThe name of the resource.
lastupdateuserP6RESOURCEHOURstringLast Update User
lastupdatedateP6RESOURCEHOURdateLast Update Date
createuserP6RESOURCEHOURstringCreate User
createdateP6RESOURCEHOURdateCreate Date
SKeyP6RESOURCEHOURintSKey generated key on ResourceHour
P6RESOURCERATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceRatersrcratersrc_rate_idintegerThe unique ID generated by the system.
ResourceObjectIdP6ResourceRatersrcratersrc_idintegerThe unique ID of the associated resource.
EffectiveDateP6ResourceRatersrcratestart_datedateThe effective date for the resource price and maximum units per time.
ShiftPeriodObjectIdP6ResourceRatersrcrateshift_period_idintegerThe unique ID of the associated shift.
MaxUnitsPerTimeP6ResourceRatersrcratemax_qty_per_hrdoubleThe maximum work units per time this resource can perform on all their assigned activities. For example, a person working full time could perform 8 hours of work per day. A department of five people may perform at 5 days per day.
PricePerUnitP6ResourceRatersrcratecost_per_qtydoubleThe non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to. In general, cost = units * price per time.
PricePerUnit2P6ResourceRateRSRCRATEdoubleThe non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to. In general, cost = units * price per time.
PricePerUnit3P6ResourceRateRSRCRATEdoubleThe non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to. In general, cost = units * price per time.
PricePerUnit4P6ResourceRateRSRCRATEdoubleThe non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to. In general, cost = units * price per time.
PricePerUnit5P6ResourceRateRSRCRATEdoubleThe non-overtime price per time for the resource. This price is used to compute costs for any activities the resource is assigned to. In general, cost = units * price per time.
ResourceIdP6ResourceRatersrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6ResourceRatersrcrsrc_namestringThe name of the resource.
lastupdateuserP6RESOURCERATEstringLast Update User
lastupdatedateP6RESOURCERATEdateLast Update Date
createuserP6RESOURCERATEstringCreate User
createdateP6RESOURCERATEdateCreate Date
SKeyP6RESOURCERATEintSKey generated key on ResourceRate
P6RESOURCERESOURCETEAMTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
resourceteamobjectidP6RESOURCERESOURCETEAMintegerResourceResourceTeam - ResourceTeamObjectId maps to RSRFOLIO.rfolio_id
resourceobjectidP6RESOURCERESOURCETEAMintegerResourceResourceTeam - ResourceObjectId maps to RSRFOLIO.rsrc_id
lastupdateuserP6RESOURCERESOURCETEAMstringLast Update User
lastupdatedateP6RESOURCERESOURCETEAMdateLast Update Date
createuserP6RESOURCERESOURCETEAMstringCreate User
createdateP6RESOURCERESOURCETEAMdateCreate Date
SKeyP6RESOURCERESOURCETEAMintSKey generated key on ResourceResourceTeam
P6RESOURCEROLETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ResourceObjectIdP6ResourceRolersrcrolersrc_idintegerThe unique ID of the associated resource.
RoleObjectIdP6ResourceRolersrcrolerole_idintegerThe unique ID of the associated role.
ProficiencyP6ResourceRolestringThe resource's proficiency at performing this role. The values are '1 - Master', '2 - Expert', '3 - Skilled', '4 - Proficient', and '5 - Inexperienced'. If the current user does not have the ViewResourceRoleProficiency global security privilege, this field may not be accessed.
ResourceIdP6ResourceRolersrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6ResourceRolersrcrsrc_namestringThe name of the resource.
RoleIdP6ResourceRolerolesrole_short_namestringThe short code that uniquely identifies the role.
RoleNameP6ResourceRolerolesrole_namestringThe name of the role. The role name uniquely identifies the role.
lastupdateuserP6RESOURCEROLEstringLast Update User
lastupdatedateP6RESOURCEROLEdateLast Update Date
createuserP6RESOURCEROLEstringCreate User
createdateP6RESOURCEROLEdateCreate Date
SKeyP6RESOURCEROLEintSKey generated key on ResourceRole
P6RESOURCESTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6RESOURCESintegerResources - ObjectId maps to RSRC.rsrc_id
calendarobjectidP6RESOURCESintegerResources - CalendarObjectId maps to RSRC.clndr_id
sequencenumberP6RESOURCESintegerResources - SequenceNumber maps to RSRC.rsrc_seq_num
usetimesheetsP6RESOURCESstringResources - UseTimesheets maps to RSRC.timesheet_flag
isactiveP6RESOURCESstringResources - IsActive maps to RSRC.active_flag
resourcetypeP6RESOURCESstringResources - ResourceType maps to RSRC.rsrc_type
autocomputeactualsP6RESOURCESstringResources - AutoComputeActuals maps to RSRC.auto_compute_act_flag
isovertimeallowedP6RESOURCESstringResources - IsOverTimeAllowed maps to RSRC.ot_flag
calculatecostfromunitsP6RESOURCESstringResources - CalculateCostFromUnits maps to RSRC.def_cost_qty_link_flag
idP6RESOURCESstringResources - Id maps to RSRC.rsrc_short_name
nameP6RESOURCESstringResources - Name maps to RSRC.rsrc_name
parentobjectidP6RESOURCESintegerResources - ParentObjectId maps to RSRC.parent_rsrc_id
timesheetapprovalmgrobjectidP6RESOURCESintegerResources - TimesheetApprovalMgrObjectID maps to RSRC.ts_approve_user_id
userobjectidP6RESOURCESintegerResources - UserObjectId maps to RSRC.user_id
primaryroleobjectidP6RESOURCESintegerResources - PrimaryRoleObjectId maps to RSRC.role_id
currencyobjectidP6RESOURCESintegerResources - CurrencyObjectId maps to RSRC.curr_id
shiftobjectidP6RESOURCESintegerResources - ShiftObjectId maps to RSRC.shift_id
overtimefactorP6RESOURCESdoubleResources - OvertimeFactor maps to RSRC.ot_factor
defaultunitspertimeP6RESOURCESdoubleResources - DefaultUnitsPerTime maps to RSRC.def_qty_per_hr
officephoneP6RESOURCESstringResources - OfficePhone maps to RSRC.office_phone
otherphoneP6RESOURCESstringResources - OtherPhone maps to RSRC.other_phone
employeeidP6RESOURCESstringResources - EmployeeId maps to RSRC.employee_code
titleP6RESOURCESstringResources - Title maps to RSRC.rsrc_title_name
emailaddressP6RESOURCESstringResources - EmailAddress maps to RSRC.email_addr
unitofmeasureobjectidP6RESOURCESintegerResources - UnitOfMeasureObjectId maps to RSRC.unit_id
resourcenotesP6RESOURCESclobResources - ResourceNotes maps to RSRC.rsrc_notes
calendarnameP6RESOURCESstringResources - CalendarName maps to rsrc.CalendarName
currencyidP6RESOURCESstringResources - CurrencyId maps to rsrc.CurrencyId
currencynameP6RESOURCESstringResources - CurrencyName maps to rsrc.CurrencyName
primaryroleidP6RESOURCESstringResources - PrimaryRoleId maps to rsrc.PrimaryRoleId
primaryrolenameP6RESOURCESstringResources - PrimaryRoleName maps to rsrc.PrimaryRoleName
timesheetapprovalmanagerP6RESOURCESstringResources - TimesheetApprovalManager maps to rsrc.TimesheetApprovalManager
usernameP6RESOURCESstringResources - UserName maps to rsrc.UserName
locationobjectidP6RESOURCESintegerProject - locationobjectid maps to project.location_id
locationnameP6RESOURCESstringLOCATION - name maps to LOCATION.location_name
lastupdateuserP6RESOURCESstringLast Update User
lastupdatedateP6RESOURCESdateLast Update Date
createuserP6RESOURCESstringCreate User
createdateP6RESOURCESdateCreate Date
lastupdatedatexP6RESOURCESdateRSRCX Update Date
SKeyP6RESOURCESintSKey generated key on Resources
P6RESOURCELOCATIONTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceLocationrsrclocrsrc_loc_idintegerThe unique ID of the resource location.
ResourceObjectIdP6ResourceLocationrsrclocrsrc_idintegerThe unique ID of the associated resource.
LongitudeP6ResourceLocationrsrcloclongitudeintegerThe longitude of the resource location.
LatitudeP6ResourceLocationrsrcloclatitudeintegerThe latitude of the resource location.
geolocationP6RESOURCELOCATIONgeometryRESOURCELOCATION - geolocation maps to RSRCLOC.geo_location
lastupdateuserP6RESOURCELOCATIONstringLast Update User
lastupdatedateP6RESOURCELOCATIONdateLast Update Date
createuserP6RESOURCELOCATIONstringCreate User
createdateP6RESOURCELOCATIONdateCreate Date
P6RESOURCESECURITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RDBMSUSERIDP6RESOURCESECURITYinteger
RESOURCEOBJECTIDP6RESOURCESECURITYinteger
P6RESOURCETEAMTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ResourceTeamrfoliorfolio_idintegerThe unique ID generated by the system.
UserObjectIdP6ResourceTeamrfoliouser_idintegerThe unique ID of the associated user.
NameP6ResourceTeamrfoliorfolio_namestringThe name of the resource team.
DescriptionP6ResourceTeamrfoliorfolio_descrstringThe description of the resource team.
UserNameP6ResourceTeamusersuser_namestringThe user's login name.
lastupdateuserP6RESOURCETEAMstringLast Update User
lastupdatedateP6RESOURCETEAMdateLast Update Date
createuserP6RESOURCETEAMstringCreate User
createdateP6RESOURCETEAMdateCreate Date
SKeyP6RESOURCETEAMintSKey generated key on ResourceTeam
P6RISKTYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6RISKTYPEintegerRiskType - ObjectId maps to RISKTYPE.risk_type_id
sequencenumberP6RISKTYPEintegerRiskType - SequenceNumber maps to RISKTYPE.seq_num
nameP6RISKTYPEstringRiskType - Name maps to RISKTYPE.risk_type
parentobjectidP6RISKTYPEintegerRiskType - Parent ObjectId maps to RISKTYPE.parent_risk_type_id
lastupdateuserP6RISKTYPEstringLast Update User
lastupdatedateP6RISKTYPEdateLast Update Date
createuserP6RISKTYPEstringCreate User
createdateP6RISKTYPEdateCreate Date
SKeyP6RISKTYPEintSKey generated key on RiskType
P6ROLETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Rolerolesrole_idintegerThe unique ID generated by the system.
IdP6Rolerolesrole_short_namestringThe short code that uniquely identifies the role.
NameP6Rolerolesrole_namestringThe name of the role. The role name uniquely identifies the role.
SequenceNumberP6Rolerolesseq_numintegerThe sequence number for sorting.
ParentObjectIdP6Rolerolesparent_role_idintegerThe unique ID of the parent role of this role in the hierarchy.
CalculateCostFromUnitsP6Rolerolesdef_cost_qty_link_flagstringThe option that indicates whether costs and quantities are linked, and whether quantities should be updated when costs are updated.
ResponsibilitiesP6Rolerolesrole_descrclobThe responsibilities for the role.
lastupdateuserP6ROLEstringLast Update User
lastupdatedateP6ROLEdateLast Update Date
createuserP6ROLEstringCreate User
createdateP6ROLEdateCreate Date
SKeyP6ROLEintSKey generated key on Role
P6ROLECODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RoleCoderolecatvalrole_catg_idintegerThe unique ID generated by the system.
CodeTypeObjectIdP6RoleCoderolecatvalrole_catg_type_idintegerThe unique ID of the parent role code type.
SequenceNumberP6RoleCoderolecatvalseq_numintegerThe sequence number for sorting.
CodeValueP6RoleCoderolecatvalrole_catg_short_namestringThe value of the role code.
DescriptionP6RoleCoderolecatvalrole_catg_namestringThe description of the role code.
ParentObjectIdP6RoleCoderolecatvalparent_role_catg_idintegerThe unique ID of the parent role code of this role code in the hierarchy.
CodeTypeNameP6RoleCoderolecattyperole_catg_typestringThe name of the parent code type for this code.
issecurecodeP6ROLECODEstringRoleCode - IsSecureCode maps to ROLECATVAL.super_flag
lastupdateuserP6ROLECODEstringLast Update User
lastupdatedateP6ROLECODEdateLast Update Date
createuserP6ROLECODEstringCreate User
createdateP6ROLECODEdateCreate Date
SKeyP6ROLECODEintSKey generated key on RoleCode
P6ROLECODETYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RoleCodeTyperolecattyperole_catg_type_idintegerThe unique ID generated by the system.
SequenceNumberP6RoleCodeTyperolecattypeseq_numintegerThe sequence number for sorting.
LengthP6RoleCodeTyperolecattyperole_catg_short_lenintegerThe maximum number of characters allowed for values of this role code.
NameP6RoleCodeTyperolecattyperole_catg_typestringThe name of the role code type.
IsSecureCodeP6RoleCodeTyperolecattypesuper_flagstringthe flag indicating whether this is a secure Role Code Type.
lastupdateuserP6ROLECODETYPEstringLast Update User
lastupdatedateP6ROLECODETYPEdateLast Update Date
createuserP6ROLECODETYPEstringCreate User
createdateP6ROLECODETYPEdateCreate Date
SKeyP6ROLECODETYPEintSKey generated key on RoleCodeType
P6ROLECODEASSIGNMENTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
RoleObjectIdP6RoleCodeAssignmentrolercatrole_idintegerThe unique ID of the role to which the role code is assigned.
RoleCodeTypeObjectIdP6RoleCodeAssignmentrolercatrole_catg_type_idintegerThe unique ID of the parent role code type.
RoleCodeObjectIdP6RoleCodeAssignmentrolercatrole_catg_idintegerThe unique ID of the associated role code.
RoleCodeDescriptionP6RoleCodeAssignmentrolecatvalrole_catg_namestringThe description of the associated role code.
RoleCodeTypeNameP6RoleCodeAssignmentrolecattyperole_catg_typestringThe name of the parent role code type.
RoleCodeValueP6RoleCodeAssignmentrolecatvalrole_catg_short_namestringThe value of the associated role code.
RoleIdP6RoleCodeAssignmentrolesrole_short_namestringThe short code that uniquely identifies the associated role.
RoleNameP6RoleCodeAssignmentrolesrole_namestringThe name of the role to which the role code is assigned.
issecurecodeP6ROLECODEASSIGNMENTstringRoleCodeAssignment - IsSecureCode maps to ROLERCAT.super_flag
lastupdateuserP6ROLECODEASSIGNMENTstringLast Update User
lastupdatedateP6ROLECODEASSIGNMENTdateLast Update Date
createuserP6ROLECODEASSIGNMENTstringCreate User
createdateP6ROLECODEASSIGNMENTdateCreate Date
SKeyP6ROLECODEASSIGNMENTintSKey generated key on RoleCodeAssignment
P6ROLERATETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RoleRateroleraterole_rate_idintegerThe unique ID generated by the system.
RoleObjectIdP6RoleRateroleraterole_idintegerThe unique ID of the associated role.
PricePerUnitP6RoleRateroleratecost_per_qtydoubleThe non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to. In general, cost = units * price per time.
PricePerUnit2P6RoleRateROLERATEdoubleThe non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to. In general, cost = units * price per time.
PricePerUnit3P6RoleRateROLERATEdoubleThe non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to. In general, cost = units * price per time.
PricePerUnit4P6RoleRateROLERATEdoubleThe non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to. In general, cost = units * price per time.
PricePerUnit5P6RoleRateROLERATEdoubleThe non-overtime price per time for the role. This price is used to compute costs for any activities the role is assigned to. In general, cost = units * price per time.
RoleIdP6RoleRaterolesrole_short_namestringThe short code that uniquely identifies the role.
RoleNameP6RoleRaterolesrole_namestringThe name of the role. The role name uniquely identifies the role.
lastupdateuserP6ROLERATEstringLast Update User
lastupdatedateP6ROLERATEdateLast Update Date
createuserP6ROLERATEstringCreate User
createdateP6ROLERATEdateCreate Date
SKeyP6ROLERATEintSKey generated key on RoleRate
P6ROLEROLETEAMTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
roleteamobjectidP6ROLEROLETEAMintegerRoleRoleTeam - RoleTeamObjectId maps to ROLFOLIO.rlfolio_id
roleobjectidP6ROLEROLETEAMintegerRoleRoleTeam - RoleObjectId maps to ROLFOLIO.role_id
lastupdateuserP6ROLEROLETEAMstringLast Update User
lastupdatedateP6ROLEROLETEAMdateLast Update Date
createuserP6ROLEROLETEAMstringCreate User
createdateP6ROLEROLETEAMdateCreate Date
SKeyP6ROLEROLETEAMintSKey generated key on RoleRoleTeam
P6ROLETEAMTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6RoleTeamrlfoliorlfolio_idintegerThe unique ID generated by the system.
UserObjectIdP6RoleTeamrlfoliouser_idintegerThe unique ID of a specific user who has access to the selected role team.
NameP6RoleTeamrlfoliorlfolio_namestringThe name of the role team.
DescriptionP6RoleTeamrlfoliorlfolio_descrstringThe description of the role team.
UserNameP6RoleTeamusersuser_namestringThe user's login name.
lastupdateuserP6ROLETEAMstringLast Update User
lastupdatedateP6ROLETEAMdateLast Update Date
createuserP6ROLETEAMstringCreate User
createdateP6ROLETEAMdateCreate Date
SKeyP6ROLETEAMintSKey generated key on RoleTeam
P6SHIFTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6Shiftshiftshift_idintegerThe unique ID generated by the system.
NameP6Shiftshiftshift_namestringThe name of the shift.
lastupdateuserP6SHIFTstringLast Update User
lastupdatedateP6SHIFTdateLast Update Date
createuserP6SHIFTstringCreate User
createdateP6SHIFTdateCreate Date
SKeyP6SHIFTintSKey generated key on Shift
P6SHIFTPERIODTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6ShiftPeriodshiftpershift_period_idintegerThe unique ID generated by the system.
ShiftObjectIdP6ShiftPeriodshiftpershift_idintegerThe unique ID of the associated shift.
StartHourP6ShiftPerioddoubleThe start time of the shift that is displayed on screen. The values range from 0 to 23.
lastupdateuserP6SHIFTPERIODstringLast Update User
lastupdatedateP6SHIFTPERIODdateLast Update Date
createuserP6SHIFTPERIODstringCreate User
createdateP6SHIFTPERIODdateCreate Date
SKeyP6SHIFTPERIODintSKey generated key on ShiftPeriod
P6SNAPSHOTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6SNAPSHOTintegerSNAPSHOT primary key maps to SNAPSHOT.snapshot_id
nameP6SNAPSHOTstringSNAPSHOT - name maps to SNAPSHOT.snap_group_name
snapshotdateP6SNAPSHOTdateSNAPSHOT - snapshotdate maps to SNAPSHOT.snapshot_date
snapshotgroupobjectidP6SNAPSHOTstringSNAPSHOT - maps to SNAPSHOT.snap_group_id
lastupdateuserP6SNAPSHOTstringLast Update User
lastupdatedateP6SNAPSHOTdateLast Update Date
createuserP6SNAPSHOTstringCreate User
createdateP6SNAPSHOTdateCreate Date
P6SNAPSHOTGROUPTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6SNAPSHOTGROUPintegerSNAPGROUP primary key maps to SNAPGROUP.snap_group_id
nameP6SNAPSHOTGROUPstringSNAPGROUP - name maps to SNAPGROUP.snap_group_name
descriptionP6SNAPSHOTGROUPstringSNAPGROUP - description maps to SNAPGROUP.snap_group_desc
intervalP6SNAPSHOTGROUPstringSNAPGROUP - maps to USEROBS.snap_interval
lastupdateuserP6SNAPSHOTGROUPstringLast Update User
lastupdatedateP6SNAPSHOTGROUPdateLast Update Date
createuserP6SNAPSHOTGROUPstringCreate User
createdateP6SNAPSHOTGROUPdateCreate Date
P6SNAPSHOTPROJECTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
snapshotgroupobjectidP6SNAPSHOTPROJECTintegerSNAPPROJ primary key maps to SNAPPROJ.snap_group_id
projectobjectidP6SNAPSHOTPROJECTintegerSNAPPROJ primary key maps to SNAPPROJ.proj_id
lastupdateuserP6SNAPSHOTPROJECTstringLast Update User
lastupdatedateP6SNAPSHOTPROJECTdateLast Update Date
createuserP6SNAPSHOTPROJECTstringCreate User
createdateP6SNAPSHOTPROJECTdateCreate Date
P6TEMP_OBS_SECURITYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
OBJECTIDP6TEMP_OBS_SECURITYinteger
PROJECTOBJECTIDP6TEMP_OBS_SECURITYinteger
WHOLEPROJECTFLAGP6TEMP_OBS_SECURITYcharacter
OBSOBJECTIDP6TEMP_OBS_SECURITYinteger
LVLP6TEMP_OBS_SECURITYinteger
P6TIMESHEETTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
TimesheetPeriodObjectIdP6Timesheettimeshtts_idintegerThe unique ID of the timesheet period.
ResourceObjectIdP6Timesheettimeshtrsrc_idintegerThe unique ID of the associated resource.
userobjectidP6TIMESHEETintegerTimesheet - UserObjectId maps to TIMESHT.user_id
IsDailyP6Timesheettimeshtdaily_flagstringThe flag that identifies whether timesheet users enter hours daily or by entire timesheet reporting period.
StatusP6Timesheettimeshtstatus_codestringThe current status of the timesheet: 'Submitted', 'Approved', 'Resource Manager Approved', 'Project Manager Approved', 'Active', or 'Rejected'.
LastReceivedDateP6Timesheettimeshtlast_recv_datedateThe last date on which the timesheet was submitted by the resource.
StatusDateP6Timesheettimeshtstatus_datedateThe date on which the status of the timesheet was last changed.
NotesP6Timesheettimeshtts_notesclobThe notes associated with the timesheet.
ResourceIdP6Timesheetrsrcrsrc_short_namestringThe short code that uniquely identifies the resource.
ResourceNameP6Timesheetrsrcrsrc_namestringThe name of the resource.
lastupdateuserP6TIMESHEETstringLast Update User
lastupdatedateP6TIMESHEETdateLast Update Date
createuserP6TIMESHEETstringCreate User
createdateP6TIMESHEETdateCreate Date
SKeyP6TIMESHEETintSKey generated key on Timesheet
P6TIMESHEETPERIODTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6TimesheetPeriodtsdatests_idintegerThe unique ID generated by the system.
StartDateP6TimesheetPeriodtsdatesstart_datedateThe timesheet period start date.
EndDateP6TimesheetPeriodtsdatesend_datedateThe timesheet period end date.
lastupdateuserP6TIMESHEETPERIODstringLast Update User
lastupdatedateP6TIMESHEETPERIODdateLast Update Date
createuserP6TIMESHEETPERIODstringCreate User
createdateP6TIMESHEETPERIODdateCreate Date
SKeyP6TIMESHEETPERIODintSKey generated key on TimesheetPeriod
P6UDFCODETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6UDFCodeudfcodeudf_code_idintegerThe unique ID generated by the system.
CodeTypeObjectIdP6UDFCodeudfcodeudf_type_idintegerThe unique ID of the code type.
SequenceNumberP6UDFCodeudfcodeseq_numintegerThe sequence number for sorting.
CodeValueP6UDFCodeudfcodeshort_namestringThe short ID that uniquely identifies the code within the code type.
DescriptionP6UDFCodeudfcodeudf_code_namestringThe description of the code.
CodeTypeTitleP6UDFCodeudftypeudf_type_labelstringThe title of the parent code type for this code.
issecurecodeP6UDFCODEstringUDFCode - IsSecureCode maps to udfcode.super_flag
lastupdateuserP6UDFCODEstringLast Update User
lastupdatedateP6UDFCODEdateLast Update Date
createuserP6UDFCODEstringCreate User
createdateP6UDFCODEdateCreate Date
SKeyP6UDFCODEintSKey generated key on UDFCode
P6UDFTYPETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6UDFTypeudftypeudf_type_idintegerThe unique ID generated by the system.
SubjectAreaP6UDFTypeudftypetable_namestringThe subject area of the user-defined field: "Activity", "Activity Expense", "Activity Step", "Activity Step Template Item", "Project", "Project Issue", "Project Risk", "Resource", "Resource Assignment", "WBS", or "Work Products and Documents".
TitleP6UDFTypeudftypeudf_type_labelstringThe name/title of the user-defined field.
DataTypeP6UDFTypeudftypelogical_data_typestringThe data type of the user-defined field: "Text", "Start Date", "Finish Date", "Cost", "Double", "Integer", "Indicator", or "Code".
IsSecureCodeP6UDFTypeudftypesuper_flagstringthe flag indicating whether this is a secure code type.
lastupdateuserP6UDFTYPEstringLast Update User
lastupdatedateP6UDFTYPEdateLast Update Date
createuserP6UDFTYPEstringCreate User
createdateP6UDFTYPEdateCreate Date
SKeyP6UDFTYPEintSKey generated key on UDFType
P6UDFVALUETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
UDFTypeObjectIdP6UDFValueudfvalueudf_type_idintegerThe unique ID of the associated UDF type.
ForeignObjectIdP6UDFValueudfvaluefk_idintegerThe unique ID of the business object to which the UDF is assigned: ProjectObjectId, ActivityObjectId, ResourceObjectId, etc.
ProjectObjectIdP6UDFValueudfvalueproj_idintegerThe unique ID of the associated project.
udfdateP6UDFVALUEdateUDFValue - UDFDate maps to UDFVALUE.udf_date
udftextP6UDFVALUEstringUDFValue - UDFText maps to UDFVALUE.udf_text
udfnumberP6UDFVALUEnumberUDFValue - UDFNumber maps to UDFVALUE.udf_number
UDFCodeObjectIdP6UDFValueudfvalueudf_code_idintegerThe unique ID of the associated UDF code.
IsBaselineP6UDFValuestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6UDFValuestringThe boolean value indicating if this business object is related to a template Project.
subjectareaP6UDFVALUEstringUDFValue - SubjectArea maps to UDFTYPE.table_name
datatypeP6UDFVALUEstringUDFValue - DataType maps to UDFTYPE.logical_data_type
issecurecodeP6UDFVALUEstringUDFType - IsSecureCode maps to UDFTYPE.super_flag
lastupdateuserP6UDFVALUEstringLast Update User
lastupdatedateP6UDFVALUEdateLast Update Date
createuserP6UDFVALUEstringCreate User
createdateP6UDFVALUEdateCreate Date
SKeyP6UDFVALUEintSKey generated key on UDFValue
P6UNITOFMEASURETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6UnitOfMeasureumeasureunit_idintegerThe unique ID generated by the system.
SequenceNumberP6UnitOfMeasureumeasureseq_numintegerThe sequence number for sorting.
NameP6UnitOfMeasureumeasureunit_namestringThe name of the unit of measure.
AbbreviationP6UnitOfMeasureumeasureunit_abbrevstringThe abbreviation of the unit of measure.
lastupdateuserP6UNITOFMEASUREstringLast Update User
lastupdatedateP6UNITOFMEASUREdateLast Update Date
createuserP6UNITOFMEASUREstringCreate User
createdateP6UNITOFMEASUREdateCreate Date
SKeyP6UNITOFMEASUREintSKey generated key on UnitOfMeasure
P6USERMODULEACCESSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6USERMODULEACCESSintegerUsereng primary key maps to USERENG.user_eng_id
userobjectidP6USERMODULEACCESSintegerUsereng - UserObjectId maps to USERENG.user_id
moduletypecodeP6USERMODULEACCESSstringUsereng - maps to USEROBS.db_engine_type
lastupdateuserP6USERMODULEACCESSstringLast Update User
lastupdatedateP6USERMODULEACCESSdateLast Update Date
createuserP6USERMODULEACCESSstringCreate User
createdateP6USERMODULEACCESSdateCreate Date
SKeyP6USERMODULEACCESSintSKey generated key on UserOBS
P6USEROBSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
UserObjectIdP6UserOBSuserobsuser_idintegerThe unique ID of the user who is assigned to the project OBS.
OBSObjectIdP6UserOBSuserobsobs_idintegerThe unique ID of the OBS to which the user is granted access.
ProjectProfileObjectIdP6UserOBSuserobsprof_idintegerThe unique ID of the project profile with which the user is granted access to the project and OBS. See the ProjectProfile class for a constant defining the fixed profile of Project Superuser.
OBSNameP6UserOBSobsobs_namestringThe name of the person/role in the organization, sometimes referred to as the "responsible manager".
ProfileNameP6UserOBSprofileprof_namestringThe name of security profile.
UserNameP6UserOBSusersuser_namestringThe user's login name.
lastupdateuserP6USEROBSstringLast Update User
lastupdatedateP6USEROBSdateLast Update Date
createuserP6USEROBSstringCreate User
createdateP6USEROBSdateCreate Date
SKeyP6USEROBSintSKey generated key on UserOBS
P6USERPROFILEPRIVILEGETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
profileidP6USERPROFILEPRIVILEGEintegerUserOBS - UserObjectId maps to USEROBS.user_id
privlegenumberP6USERPROFILEPRIVILEGEintegerUserOBS - OBSObjectId maps to USEROBS.obs_id
privlegenameP6USERPROFILEPRIVILEGEstringThe name of the privilege
allowflagP6USERPROFILEPRIVILEGEstringUserOBS - ProjectProfileObjectId maps to USEROBS.prof_id
lastupdateuserP6USERPROFILEPRIVILEGEstringLast Update User
lastupdatedateP6USERPROFILEPRIVILEGEdateLast Update Date
createuserP6USERPROFILEPRIVILEGEstringCreate User
createdateP6USERPROFILEPRIVILEGEdateCreate Date
SKeyP6USERPROFILEPRIVILEGEintSKey generated key on UserOBS
P6USERSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6USERSintegerUsers - ObjectId maps to USERS.user_id
emailprotocolP6USERSstringUsers - EmailProtocol maps to USERS.email_type
rdbmsusernameP6USERSstringUsers - Name maps to USERS.user_name
nameP6USERSstringUsers - Name maps to USERS.user_name
globalprofileobjectidP6USERSintegerUsers - GlobalProfileObjectId maps to USERS.prof_id
currencyobjectidP6USERSintegerUsers - CurrencyObjectId maps to USERS.curr_id
allresourceaccessflagP6USERSstringUsers - AllResourceAccessFlag maps to USERS.all_rsrc_access_flag
issuperuserP6USERSstringUsers - IsSuperUser maps to PROFILE.superuser_flag
mailserverloginnameP6USERSstringUsers - MailServerLoginName maps to USERS.email_srv_user_name
officephoneP6USERSstringUsers - OfficePhone maps to USERS.office_phone
personalnameP6USERSstringUsers - PersonalName maps to USERS.actual_name
outgoingmailserverP6USERSstringUsers - OutgoingMailServer maps to USERS.email_send_server
emailaddressP6USERSstringUsers - EmailAddress maps to USERS.email_addr
notificationsettingsP6USERSstringUsers - NotificationSettings maps to USERS.notify_prefs
respectactivitydurationtypeP6USERSstringUsers - RespectActivityDurationType maps to USERS.RespectActivityDurationType
assignmentstaffingpreferenceP6USERSstringUsers - AssignmentStaffingPreference maps to users.AssignmentStaffingPreference
currencyidP6USERSstringUsers - CurrencyId maps to users.CurrencyId
currencynameP6USERSstringUsers - CurrencyName maps to users.CurrencyName
financialperiodendobjectidP6USERSintegerUsers - FinancialPeriodEndObjectId maps to users.FinancialPeriodEndObjectId
financialperiodstartobjectidP6USERSintegerUsers - FinancialPeriodStartObjectId maps to users.FinancialPeriodStartObjectId
newprojectdurationtypeP6USERSstringUsers - NewProjectDurationType maps to users.NewProjectDurationType
ratesourcepreferenceP6USERSstringUsers - RateSourcePreference maps to users.RateSourcePreference
rdbmsuseridP6USERSinteger
reportingflagP6USERSstringUsers - ReportingFlag maps to USERS.Report_User_Flag
lastprojectsecuritydateP6USERSdateUsers - Last Calc date for project security
lastresourcesecuritydateP6USERSdateUsers - Last Calc date for resource security
lastglobalsecuritydateP6USERSdateUsers - Last Calc date for global security
lastupdateuserP6USERSstringLast Update User
lastupdatedateP6USERSdateLast Update Date
createuserP6USERSstringCreate User
createdateP6USERSdateCreate Date
SKeyP6USERSintSKey generated key on Users
P6WBSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6WBSprojwbswbs_idintegerThe unique ID generated by the system.
ProjectObjectIdP6WBSprojwbsproj_idintegerThe unique ID of the associated project.
OBSObjectIdP6WBSprojwbsobs_idintegerThe unique ID of the project manager from the project's OBS tree who is responsible for the WBS.
SequenceNumberP6WBSprojwbsseq_numintegerThe sequence number for sorting.
ContainsSummaryDataP6WBSprojwbssum_data_flagstringThe flag that indicates that the WBS has been summarized.
StatusP6WBSprojwbsstatus_codestringThe WBS status: 'Planned', 'Active', 'Inactive', 'What-If', 'Requested', or 'Template'.
CodeP6WBSprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
NameP6WBSprojwbswbs_namestringThe name of the WBS element.
WBSCategoryObjectIdP6WBSprojwbsphase_idintegerThe unique ID of the associated WBS category value. Note that the label used for the WBS category is dynamic; it is controlled by the system administrator.
ParentObjectIdP6WBSprojwbsparent_wbs_idintegerThe unique ID of the parent WBS of this WBS in the hierarchy.
EarnedValueUserPercentP6WBSprojwbsev_user_pctdoubleThe user-defined percent complete for computing earned value for activities within the WBS. A value of, say, 25 means that 25% of the planned amount is earned when the activity is started and the remainder is earned when the activity is completed.
EarnedValueETCUserValueP6WBSprojwbsev_etc_user_valuedoubleThe user-defined performance factor, PF, for computing earned-value estimate-to-complete. ETC is computed as PF * ( BAC - BCWP).
OriginalBudgetP6WBSprojwbsorig_costdoubleThe original budget for the WBS element.
IndependentETCTotalCostP6WBSprojwbsindep_remain_total_costdoubleThe user-entered ETC total cost.
IndependentETCLaborUnitsP6WBSprojwbsindep_remain_work_qtydoubleThe user-entered ETC total labor.
AnticipatedStartDateP6WBSprojwbsanticip_start_datedateThe anticipated start date of WBS, project and EPS elements. User-entered - not dependent upon any other fields. If there are no children, the anticipated start date will be the start date displayed in the columns.
AnticipatedFinishDateP6WBSprojwbsanticip_end_datedateThe anticipated finish date of WBS, project and EPS elements. User-entered - not dependent upon any other fields. If there are no children, the anticipated finish date will be the finish date displayed in the columns.
EarnedValueComputeTypeP6WBSprojwbsev_compute_typestringThe technique used for computing earned-value percent complete for activities within the WBS. Valid values are 'Activity Percent Complete', '0 / 100', '50 / 50', 'Custom Percent Complete', 'WBS Milestones Percent Complete', and 'Activity Percent Complete Using Resource Curves'.
EarnedValueETCComputeTypeP6WBSprojwbsev_etc_compute_typestringThe technique for computing earned-value estimate-to-complete for activities within the WBS. Valid values are 'ETC = Remaining Cost for Activity', 'Performance Factor = 1', 'Performance Factor = Custom Value', 'Performance Factor = 1 / Cost Performance Index', and 'Performance Factor = 1 / (Cost Performance Index * Schedule Performance Index)'.
projectnodeflagP6WBSstringWBS - ProjectNodeFlag maps to PROJWBS.proj_node_flag
IsBaselineP6WBSstringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6WBSstringThe boolean value indicating if this business object is related to a template Project.
CurrentBudgetP6WBSnumberThe current budget for this WBS.
CurrentVarianceP6WBSnumberThe current budget minus the total spending plan.
DistributedCurrentBudgetP6WBSnumberThe sum of the current budget values from one level lower
FinishDateP6WBSdateThe finish date of the WBS.
ForecastFinishDateP6WBSdateThe alternate end date to be optionally used by the scheduler. The user sets the alternate end date by dragging the project bar in the Gantt Chart while manually leveling the resource profile in a resource analysis layout.
ForecastStartDateP6WBSdateThe alternate start date to be optionally used by the scheduler. The user sets the alternate start date by dragging the project bar in the Gantt Chart while manually leveling the resource profile in a resource analysis layout.
fullnameP6WBSstring
fullsequenceP6WBSstring
OBSNameP6WBSobsobs_namestringThe name of the person/role in the organization, sometimes referred to as the "responsible manager".
ProjectIdP6WBSprojectproj_short_namestringThe short code that uniquely identifies the project.
ProposedBudgetP6WBSnumberThe sum of the original budget plus the approved and pending budgets from the budget change log.
reviewtypeP6WBSstringWBS - Name maps to PROJWBS.review_type
StartDateP6WBSdateThe start date of the WBS.
sumplannedstartdateP6WBSdateWBS - SumPlannedStartDate maps to wbs.SumPlannedStartDate
sumplannedfinishdateP6WBSdateWBS - SumPlannedFinishDate maps to wbs.SumPlannedFinishDate
sumplanneddurationP6WBSnumberWBS - SumPlannedDuration maps to wbs.SumPlannedDuration
sumplannedlaborunitsP6WBSnumberWBS - SumPlannedLaborUnits maps to wbs.SumPlannedLaborUnits
sumplannednonlaborunitsP6WBSnumberWBS - SumPlannedNonLaborUnits maps to wbs.SumPlannedNonLaborUnits
sumplannedexpensecostP6WBSnumberWBS - SumPlannedExpenseCost maps to wbs.SumPlannedExpenseCost
sumplannedlaborcostP6WBSnumberWBS - SumPlannedLaborCost maps to wbs.SumPlannedLaborCost
sumplannedmaterialcostP6WBSnumberWBS - SumPlannedMaterialCost maps to wbs.SumPlannedMaterialCost
sumplannednonlaborcostP6WBSnumberWBS - SumPlannedNonLaborCost maps to wbs.SumPlannedNonLaborCost
sumplannedtotalcostP6WBSnumberWBS - SumPlannedTotalCost maps to wbs.SumPlannedTotalCost
sumaccountingvarbylaborunitsP6WBSnumberWBS - SumAccountingVarByLaborUnits maps to projwbs.SumAccountingVarByLaborUnits
sumaccountingvariancebycostP6WBSnumberWBS - SumAccountingVarianceByCost maps to projwbs.SumAccountingVarianceByCost
sumactthisperiodmaterialcostP6WBSnumberWBS - SumActThisPeriodMaterialCost maps to projwbs.SumActThisPeriodMaterialCost
sumactthisperiodnonlaborcostP6WBSnumberWBS - SumActThisPeriodNonLaborCost maps to projwbs.SumActThisPeriodNonLaborCost
sumactthisperiodnonlaborunitsP6WBSnumberWBS - SumActThisPeriodNonLaborUnits maps to projwbs.SumActThisPeriodNonLaborUnits
sumactualthisperiodlaborcostP6WBSnumberWBS - SumActualThisPeriodLaborCost maps to projwbs.SumActualThisPeriodLaborCost
sumactualthisperiodlaborunitsP6WBSnumberWBS - SumActualThisPeriodLaborUnits maps to projwbs.SumActualThisPeriodLaborUnits
sumatcompletionmaterialcostP6WBSnumberWBS - SumAtCompletionMaterialCost maps to projwbs.SumAtCompletionMaterialCost
sumatcompletionnonlaborcostP6WBSnumberWBS - SumAtCompletionNonLaborCost maps to projwbs.SumAtCompletionNonLaborCost
sumatcompletionnonlaborunitsP6WBSnumberWBS - SumAtCompletionNonLaborUnits maps to projwbs.SumAtCompletionNonLaborUnits
sumatcompletiontotalcostvarP6WBSnumberWBS - SumAtCompletionTotalCostVar maps to projwbs.SumAtCompletionTotalCostVar
sumbaselinecompactivitycountP6WBSnumberWBS - SumBaselineCompActivityCount maps to projwbs.SumBaselineCompActivityCount
sumbaselinenotstartedactcntP6WBSnumberWBS - SumBaselineNotStartedActCnt maps to projwbs.SumBaselineNotStartedActCnt
sumblinprogressactivitycountP6WBSnumberWBS - SumBLInProgressActivityCount maps to projwbs.SumBLInProgressActivityCount
sumbudgetatcmpbylaborunitsP6WBSnumberWBS - SumBudgetAtCmpByLaborUnits maps to projwbs.SumBudgetAtCmpByLaborUnits
sumbudgetatcompletionbycostP6WBSnumberWBS - SumBudgetAtCompletionByCost maps to projwbs.SumBudgetAtCompletionByCost
sumcostperfindexbycostP6WBSnumberWBS - SumCostPerfIndexByCost maps to projwbs.SumCostPerfIndexByCost
sumcostperfindexbylaborunitsP6WBSnumberWBS - SumCostPerfIndexByLaborUnits maps to projwbs.SumCostPerfIndexByLaborUnits
sumcostvariancebylaborunitsP6WBSnumberWBS - SumCostVarianceByLaborUnits maps to projwbs.SumCostVarianceByLaborUnits
sumcostvarindexbylaborunitsP6WBSnumberWBS - SumCostVarIndexByLaborUnits maps to projwbs.SumCostVarIndexByLaborUnits
sumdurationpercentofplannedP6WBSnumberWBS - SumDurationPercentOfPlanned maps to projwbs.SumDurationPercentOfPlanned
sumeacbycostP6WBSnumberWBS - SumEACByCost maps to projwbs.SumEACByCost
sumeacbylaborunitsP6WBSnumberWBS - SumEACByLaborUnits maps to projwbs.SumEACByLaborUnits
sumeachighpctbylaborunitsP6WBSnumberWBS - SumEACHighPctByLaborUnits maps to projwbs.SumEACHighPctByLaborUnits
sumeaclowpctbylaborunitsP6WBSnumberWBS - SumEACLowPctByLaborUnits maps to projwbs.SumEACLowPctByLaborUnits
sumetcbycostP6WBSnumberWBS - SumETCByCost maps to projwbs.SumETCByCost
sumetcbylaborunitsP6WBSnumberWBS - SumETCByLaborUnits maps to projwbs.SumETCByLaborUnits
sumexpensecostpctcompleteP6WBSnumberWBS - SumExpenseCostPctComplete maps to projwbs.SumExpenseCostPctComplete
sumlaborcostpercentcompleteP6WBSnumberWBS - SumLaborCostPercentComplete maps to projwbs.SumLaborCostPercentComplete
sumlaborunitspercentcompleteP6WBSnumberWBS - SumLaborUnitsPercentComplete maps to projwbs.SumLaborUnitsPercentComplete
sumactivitycountP6WBSnumberWBS - SumActivityCount maps to projwbs.SumActivityCount
sumactualdurationP6WBSnumberWBS - SumActualDuration maps to projwbs.SumActualDuration
sumactualexpensecostP6WBSnumberWBS - SumActualExpenseCost maps to projwbs.SumActualExpenseCost
sumactualfinishdateP6WBSdateWBS - SumActualFinishDate maps to projwbs.SumActualFinishDate
summaxactualfinishdateP6WBSdateWBS - SumMaxActualFinishDate
summaxrestartdateP6WBSdateWBS - SumMaxRestartDate
sumactuallaborcostP6WBSnumberWBS - SumActualLaborCost maps to projwbs.SumActualLaborCost
sumactuallaborunitsP6WBSnumberWBS - SumActualLaborUnits maps to projwbs.SumActualLaborUnits
sumactualmaterialcostP6WBSnumberWBS - SumActualMaterialCost maps to projwbs.SumActualMaterialCost
sumactualnonlaborcostP6WBSnumberWBS - SumActualNonLaborCost maps to projwbs.SumActualNonLaborCost
sumactualnonlaborunitsP6WBSnumberWBS - SumActualNonLaborUnits maps to projwbs.SumActualNonLaborUnits
sumactualstartdateP6WBSdateWBS - SumActualStartDate maps to projwbs.SumActualStartDate
sumactualthisperiodcostP6WBSnumberWBS - SumActualThisPeriodCost maps to projwbs.SumActualThisPeriodCost
sumactualtotalcostP6WBSnumberWBS - SumActualTotalCost maps to projwbs.SumActualTotalCost
sumactualvaluebycostP6WBSnumberWBS - SumActualValueByCost maps to projwbs.SumActualValueByCost
sumactualvaluebylaborunitsP6WBSnumberWBS - SumActualValueByLaborUnits maps to projwbs.SumActualValueByLaborUnits
sumatcompletiondurationP6WBSnumberWBS - SumAtCompletionDuration maps to projwbs.SumAtCompletionDuration
sumatcompletionexpensecostP6WBSnumberWBS - SumAtCompletionExpenseCost maps to projwbs.SumAtCompletionExpenseCost
sumatcompletionlaborcostP6WBSnumberWBS - SumAtCompletionLaborCost maps to projwbs.SumAtCompletionLaborCost
sumatcompletionlaborunitsP6WBSnumberWBS - SumAtCompletionLaborUnits maps to projwbs.SumAtCompletionLaborUnits
sumatcompletiontotalcostP6WBSnumberWBS - SumAtCompletionTotalCost maps to projwbs.SumAtCompletionTotalCost
sumbaselinedurationP6WBSnumberWBS - SumBaselineDuration maps to projwbs.SumBaselineDuration
sumbaselineexpensecostP6WBSnumberWBS - SumBaselineExpenseCost maps to projwbs.SumBaselineExpenseCost
sumbaselinefinishdateP6WBSdateWBS - SumBaselineFinishDate maps to projwbs.SumBaselineFinishDate
sumbaselinelaborcostP6WBSnumberWBS - SumBaselineLaborCost maps to projwbs.SumBaselineLaborCost
sumbaselinelaborunitsP6WBSnumberWBS - SumBaselineLaborUnits maps to projwbs.SumBaselineLaborUnits
sumbaselinematerialcostP6WBSnumberWBS - SumBaselineMaterialCost maps to projwbs.SumBaselineMaterialCost
sumbaselinenonlaborcostP6WBSnumberWBS - SumBaselineNonLaborCost maps to projwbs.SumBaselineNonLaborCost
sumbaselinenonlaborunitsP6WBSnumberWBS - SumBaselineNonLaborUnits maps to projwbs.SumBaselineNonLaborUnits
sumbaselinestartdateP6WBSdateWBS - SumBaselineStartDate maps to projwbs.SumBaselineStartDate
sumbaselinetotalcostP6WBSnumberWBS - SumBaselineTotalCost maps to projwbs.SumBaselineTotalCost
sumcompletedactivitycountP6WBSnumberWBS - SumCompletedActivityCount maps to projwbs.SumCompletedActivityCount
sumcostpercentcompleteP6WBSnumberWBS - SumCostPercentComplete maps to projwbs.SumCostPercentComplete
sumcostpercentofplannedP6WBSnumberWBS - SumCostPercentOfPlanned maps to projwbs.SumCostPercentOfPlanned
sumcostvariancebycostP6WBSnumberWBS - SumCostVarianceByCost maps to projwbs.SumCostVarianceByCost
sumcostvarianceindexP6WBSnumberWBS - SumCostVarianceIndex maps to projwbs.SumCostVarianceIndex
sumcostvarianceindexbycostP6WBSnumberWBS - SumCostVarianceIndexByCost maps to projwbs.SumCostVarianceIndexByCost
sumdurationpercentcompleteP6WBSnumberWBS - SumDurationPercentComplete maps to projwbs.SumDurationPercentComplete
sumdurationvarianceP6WBSnumberWBS - SumDurationVariance maps to projwbs.SumDurationVariance
sumearnedvaluebycostP6WBSnumberWBS - SumEarnedValueByCost maps to projwbs.SumEarnedValueByCost
sumearnedvaluebylaborunitsP6WBSnumberWBS - SumEarnedValueByLaborUnits maps to projwbs.SumEarnedValueByLaborUnits
sumexpensecostvarianceP6WBSnumberWBS - SumExpenseCostVariance maps to projwbs.SumExpenseCostVariance
sumfinishdatevarianceP6WBSnumberWBS - SumFinishDateVariance maps to projwbs.SumFinishDateVariance
suminprogressactivitycountP6WBSnumberWBS - SumInProgressActivityCount maps to projwbs.SumInProgressActivityCount
sumlaborcostvarianceP6WBSnumberWBS - SumLaborCostVariance maps to projwbs.SumLaborCostVariance
sumlaborunitsvarianceP6WBSnumberWBS - SumLaborUnitsVariance maps to projwbs.SumLaborUnitsVariance
summaterialcostvarianceP6WBSnumberWBS - SumMaterialCostVariance maps to projwbs.SumMaterialCostVariance
sumnonlaborcostvarianceP6WBSnumberWBS - SumNonLaborCostVariance maps to projwbs.SumNonLaborCostVariance
sumnonlaborunitsvarianceP6WBSnumberWBS - SumNonLaborUnitsVariance maps to projwbs.SumNonLaborUnitsVariance
sumnotstartedactivitycountP6WBSnumberWBS - SumNotStartedActivityCount maps to projwbs.SumNotStartedActivityCount
sumplannedvaluebycostP6WBSnumberWBS - SumPlannedValueByCost maps to projwbs.SumPlannedValueByCost
sumprogressfinishdateP6WBSdateWBS - SumProgressFinishDate maps to projwbs.SumProgressFinishDate
sumremainingdurationP6WBSnumberWBS - SumRemainingDuration maps to projwbs.SumRemainingDuration
sumremainingexpensecostP6WBSnumberWBS - SumRemainingExpenseCost maps to projwbs.SumRemainingExpenseCost
sumremainingfinishdateP6WBSdateWBS - SumRemainingFinishDate maps to projwbs.SumRemainingFinishDate
sumremaininglaborcostP6WBSnumberWBS - SumRemainingLaborCost maps to projwbs.SumRemainingLaborCost
sumremaininglaborunitsP6WBSnumberWBS - SumRemainingLaborUnits maps to projwbs.SumRemainingLaborUnits
sumremainingmaterialcostP6WBSnumberWBS - SumRemainingMaterialCost maps to projwbs.SumRemainingMaterialCost
sumremainingnonlaborcostP6WBSnumberWBS - SumRemainingNonLaborCost maps to projwbs.SumRemainingNonLaborCost
sumremainingnonlaborunitsP6WBSnumberWBS - SumRemainingNonLaborUnits maps to projwbs.SumRemainingNonLaborUnits
sumremainingstartdateP6WBSdateWBS - SumRemainingStartDate maps to projwbs.SumRemainingStartDate
sumremainingtotalcostP6WBSnumberWBS - SumRemainingTotalCost maps to projwbs.SumRemainingTotalCost
sumschedulepercentcompleteP6WBSnumberWBS - SumSchedulePercentComplete maps to projwbs.SumSchedulePercentComplete
sumperformancepercentcompleteP6WBSnumberWBS - SumPerformancePercentComplete maps to project.SumPerformancePercentComplete
sumschedulevariancebycostP6WBSnumberWBS - SumScheduleVarianceByCost maps to projwbs.SumScheduleVarianceByCost
sumschedulevarianceindexP6WBSnumberWBS - SumScheduleVarianceIndex maps to projwbs.SumScheduleVarianceIndex
sumstartdatevarianceP6WBSnumberWBS - SumStartDateVariance maps to projwbs.SumStartDateVariance
sumtotalcostvarianceP6WBSnumberWBS - SumTotalCostVariance maps to projwbs.SumTotalCostVariance
sumtotalfloatP6WBSnumberWBS - SumTotalFloat maps to projwbs.SumTotalFloat
sumunitspercentcompleteP6WBSnumberWBS - SumUnitsPercentComplete maps to projwbs.SumUnitsPercentComplete
summaterialcostpctcompleteP6WBSnumberWBS - SumMaterialCostPctComplete maps to projwbs.SumMaterialCostPctComplete
sumnonlaborcostpctcompleteP6WBSnumberWBS - SumNonLaborCostPctComplete maps to projwbs.SumNonLaborCostPctComplete
sumnonlaborunitspctcompleteP6WBSnumberWBS - SumNonLaborUnitsPctComplete maps to projwbs.SumNonLaborUnitsPctComplete
sumperfpctcmpbylaborunitsP6WBSnumberWBS - SumPerfPctCmpByLaborUnits maps to projwbs.SumPerfPctCmpByLaborUnits
sumplannedvaluebylaborunitsP6WBSnumberWBS - SumPlannedValueByLaborUnits maps to projwbs.SumPlannedValueByLaborUnits
sumschdpctcmpbylaborunitsP6WBSnumberWBS - SumSchdPctCmpByLaborUnits maps to projwbs.SumSchdPctCmpByLaborUnits
sumschdperfindexbylaborunitsP6WBSnumberWBS - SumSchdPerfIndexByLaborUnits maps to projwbs.SumSchdPerfIndexByLaborUnits
sumschdvariancebylaborunitsP6WBSnumberWBS - SumSchdVarianceByLaborUnits maps to projwbs.SumSchdVarianceByLaborUnits
sumschdvarianceindexbycostP6WBSnumberWBS - SumSchdVarianceIndexByCost maps to projwbs.SumSchdVarianceIndexByCost
sumschdvarindexbylaborunitsP6WBSnumberWBS - SumSchdVarIndexByLaborUnits maps to projwbs.SumSchdVarIndexByLaborUnits
sumscheduleperfindexbycostP6WBSnumberWBS - SumSchedulePerfIndexByCost maps to projwbs.SumSchedulePerfIndexByCost
sumtocompleteperfindexbycostP6WBSnumberWBS - SumToCompletePerfIndexByCost maps to projwbs.SumToCompletePerfIndexByCost
sumvaratcmpbylaborunitsP6WBSnumberWBS - SumVarAtCmpByLaborUnits maps to projwbs.SumVarAtCmpByLaborUnits
sumearlystartdateP6WBSdateWBS - SumEarlyStartDate
sumearlyenddateP6WBSdateWBS - SumEarlyEndDate
sumlatestartdateP6WBSdateWBS - SumLateStartDate
sumlateenddateP6WBSdateWBS - SumLateEndDate
summaxcalendaridP6WBSnumberWBS - SumMaxCalendarId maps to project.SumMaxCalendarId
summincalendaridP6WBSnumberWBS - SumMinCalendarId maps to project.SumMinCalendarId
TotalBenefitPlanP6WBSnumberThe sum of the monthly benefit plan.
TotalBenefitPlanTallyP6WBSnumberThe sum of the monthly benefit plan tally.
TotalSpendingPlanP6WBSnumberThe sum of the monthly spending plan.
TotalSpendingPlanTallyP6WBSnumberThe sum of the monthly spending plan tally.
UnallocatedBudgetP6WBSnumberThe difference between the total current and distributed current budget. Calculated as total current budget - distributed current budget.
UndistributedCurrentVarianceP6WBSnumberThe total spending plan minus the total spending plan tally.
lastupdateuserP6WBSstringLast Update User
lastupdatedateP6WBSdateLast Update Date
createuserP6WBSstringCreate User
createdateP6WBSdateCreate Date
lastupdatedatexP6WBSdateWBSX Update Date
SKeyP6WBSintSKey generated key on WBS
P6WBSCATEGORYTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6WBSCategoryphasephase_idintegerThe unique ID generated by the system.
SequenceNumberP6WBSCategoryphaseseq_numintegerThe sequence number for sorting.
NameP6WBSCategoryphasephase_namestringThe name of the WBS category. Note that the label used for WBS category is dynamic; the system administrator controls it.
lastupdateuserP6WBSCATEGORYstringLast Update User
lastupdatedateP6WBSCATEGORYdateLast Update Date
createuserP6WBSCATEGORYstringCreate User
createdateP6WBSCATEGORYdateCreate Date
SKeyP6WBSCATEGORYintSKey generated key on WBSCategory
P6WBSMILESTONETop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6WBSMilestonewbsstepwbs_step_idintegerThe unique ID generated by the system.
ProjectObjectIdP6WBSMilestonewbsstepproj_idintegerThe unique ID of the associated project.
WBSObjectIdP6WBSMilestonewbsstepwbs_idintegerThe unique ID of the WBS where the WBS milestone is assigned.
SequenceNumberP6WBSMilestonewbsstepseq_numintegerThe sequence number for sorting.
IsCompletedP6WBSMilestonewbsstepcomplete_flagstringThe flag that indicates whether the step has been completed.
NameP6WBSMilestonewbsstepstep_namestringThe name of the WBS milestone.
WeightP6WBSMilestonewbsstepstep_wtdoubleThe weight that is assigned to the milestone.
IsBaselineP6WBSMilestonestringThe boolean value indicating if this business object is related to a Project or Baseline
IsTemplateP6WBSMilestonestringThe boolean value indicating if this business object is related to a template Project.
ProjectIdP6WBSMilestoneprojectproj_short_namestringThe short code that uniquely identifies the project.
WBSCodeP6WBSMilestoneprojwbswbs_short_namestringThe short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents' codes.
WBSNameP6WBSMilestoneprojwbswbs_namestringThe name of the WBS element.
lastupdateuserP6WBSMILESTONEstringLast Update User
lastupdatedateP6WBSMILESTONEdateLast Update Date
createuserP6WBSMILESTONEstringCreate User
createdateP6WBSMILESTONEdateCreate Date
SKeyP6WBSMILESTONEintSKey generated key on WBSMilestone
P6WBSSPREADTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
ObjectIdP6WBSSPREADinteger
ParentObjectIdP6WBSSPREADinteger
CodeP6WBSSPREADstring
NameP6WBSSPREADstring
projectobjectidP6WBSSPREADinteger
ObsObjectIdP6WBSSPREADinteger
ObsNameP6WBSSPREADstring
StartDateP6WBSSPREADdate
EndDateP6WBSSPREADdate
ActualLaborUnitsP6WBSSPREADdouble
ActualNonlaborUnitsP6WBSSPREADdouble
AtCompletionLaborUnitsP6WBSSPREADdouble
AtCompletionNonlaborUnitsP6WBSSPREADdouble
BaselinePlannedLaborUnitsP6WBSSPREADdouble
BaselinePlannedNonlaborUnitsP6WBSSPREADdouble
EarnedValueLaborUnitsP6WBSSPREADdouble
EstimateAtCompletionLaborUnitsP6WBSSPREADdouble
EstimateToCompleteLaborUnitsP6WBSSPREADdouble
PlannedLaborUnitsP6WBSSPREADdouble
PlannedNonlaborUnitsP6WBSSPREADdouble
PlannedValueLaborUnitsP6WBSSPREADdouble
RemainingLaborUnitsP6WBSSPREADdouble
RemainingNonlaborUnitsP6WBSSPREADdouble
ActualCostP6WBSSPREADdouble
ActualExpenseCostP6WBSSPREADdouble
ActualLaborCostP6WBSSPREADdouble
ActualMaterialCostP6WBSSPREADdouble
ActualNonlaborCostP6WBSSPREADdouble
ActualTotalCostP6WBSSPREADdouble
AtCompletionExpenseCostP6WBSSPREADdouble
AtCompletionLaborCostP6WBSSPREADdouble
AtCompletionMaterialCostP6WBSSPREADdouble
AtCompletionNonlaborCostP6WBSSPREADdouble
AtCompletionTotalCostP6WBSSPREADdouble
BaselinePlannedExpenseCostP6WBSSPREADdouble
BaselinePlannedLaborCostP6WBSSPREADdouble
BaselinePlannedMaterialCostP6WBSSPREADdouble
BaselinePlannedNonlaborCostP6WBSSPREADdouble
BaselinePlannedTotalCostP6WBSSPREADdouble
EarnedValueCostP6WBSSPREADdouble
EstimateAtCompletionCostP6WBSSPREADdouble
EstimateToCompleteCostP6WBSSPREADdouble
PlannedExpenseCostP6WBSSPREADdouble
PlannedLaborCostP6WBSSPREADdouble
PlannedMaterialCostP6WBSSPREADdouble
PlannedNonlaborCostP6WBSSPREADdouble
PlannedTotalCostP6WBSSPREADdouble
PlannedValueCostP6WBSSPREADdouble
RemainingExpenseCostP6WBSSPREADdouble
RemainingLaborCostP6WBSSPREADdouble
RemainingMaterialCostP6WBSSPREADdouble
RemainingNonlaborCostP6WBSSPREADdouble
RemainingTotalCostP6WBSSPREADdouble
SKeyP6WBSSPREADnumber
P6ETL_HA_GENERALTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
nodeP6ETL_HA_GENERALintegerETL_HA_GENERAL.node
parentnodeP6ETL_HA_GENERALintegerETL_HA_GENERAL.parentnode
idfieldP6ETL_HA_GENERALintegerETL_HA_GENERAL.idfield
depthP6ETL_HA_GENERALintegerETL_HA_GENERAL.depth
lineageP6ETL_HA_GENERALstringETL_HA_GENERAL.lineage
P6ETL_HA_PROJWBSREPORTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
nodeP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.node
parentnodeP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.parentnode
wbsidP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.wbsid
projidP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.projid
epsidP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.epsid
rtypeP6ETL_HA_PROJWBSREPORTcharacterETL_HA_PROJWBSREPORT.rtype
depthP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.depth
lineageP6ETL_HA_PROJWBSREPORTstringETL_HA_PROJWBSREPORT.lineage
nameP6ETL_HA_PROJWBSREPORTstringETL_HA_PROJWBSREPORT.name
seqnumP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.seqnum
nameseqnumP6ETL_HA_PROJWBSREPORTintegerETL_HA_PROJWBSREPORT.nameseqnum
P6ETL_PARAMETERTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
p_featureP6ETL_PARAMETERstringETL_PARAMETER.p_feature
p_1P6ETL_PARAMETERstringETL_PARAMETER.p_1
p_2P6ETL_PARAMETERstringETL_PARAMETER.p_2
p_3P6ETL_PARAMETERstringETL_PARAMETER.p_3
p_4P6ETL_PARAMETERstringETL_PARAMETER.p_4
p_5P6ETL_PARAMETERstringETL_PARAMETER.p_5
P6ETL_PROCESSEXCEPTIONTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
processidP6ETL_PROCESSEXCEPTIONdoubleETL_PROCESSEXCEPTION.processid
exceptiondateP6ETL_PROCESSEXCEPTIONdateETL_PROCESSEXCEPTION.exceptiondate
processnameP6ETL_PROCESSEXCEPTIONstringETL_PROCESSEXCEPTION.processname
exceptiondescriptionP6ETL_PROCESSEXCEPTIONstringETL_PROCESSEXCEPTION.exceptiondescription
exceptionlevelP6ETL_PROCESSEXCEPTIONintegerETL_PROCESSEXCEPTION.exceptionlevel
pmdbtablenameP6ETL_PROCESSEXCEPTIONstringETL_PROCESSEXCEPTION.pmdbtablename
odstablenameP6ETL_PROCESSEXCEPTIONstringETL_PROCESSEXCEPTION.odstablename
pkeyP6ETL_PROCESSEXCEPTIONstringETL_PROCESSEXCEPTION.pkey
projectidP6ETL_PROCESSEXCEPTIONintegerETL_PROCESSEXCEPTION.projectid
P6ETL_PROCESSINFOTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
processidP6ETL_PROCESSINFOdoubleETL_PROCESSINFO.processid
infodateP6ETL_PROCESSINFOdateETL_PROCESSINFO.infodate
processnameP6ETL_PROCESSINFOstringETL_PROCESSINFO.processname
infomsgP6ETL_PROCESSINFOstringETL_PROCESSINFO.infomsg
infotypeP6ETL_PROCESSINFOstringETL_PROCESSINFO.infotype
tablenameP6ETL_PROCESSINFOstringETL_PROCESSINFO.tablename
rows_processedP6ETL_PROCESSINFOintegerETL_PROCESSINFO.rows
P6ETL_PROCESSMASTERTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
processidP6ETL_PROCESSMASTERdoubleETL_PROCESSMASTER.processid
processstartdateP6ETL_PROCESSMASTERdateETL_PROCESSMASTER.processstartdate
processenddateP6ETL_PROCESSMASTERdateETL_PROCESSMASTER.processenddate
processtypeP6ETL_PROCESSMASTERstringETL_PROCESSMASTER.processtype
P6ETL_PERF_PUBLIC_VARSTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
step_nbrP6ETL_PERF_PUBLIC_VARSinteger
step_cntP6ETL_PERF_PUBLIC_VARSinteger
part_nbrP6ETL_PERF_PUBLIC_VARSinteger
part_cntP6ETL_PERF_PUBLIC_VARSinteger
action_nameP6ETL_PERF_PUBLIC_VARSstring
process_nameP6ETL_PERF_PUBLIC_VARSstring
step_nameP6ETL_PERF_PUBLIC_VARSstring
step_descP6ETL_PERF_PUBLIC_VARSstring
file_nameP6ETL_PERF_PUBLIC_VARSstring
P6ETL_PERF_RAW_DETAILTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
processidP6ETL_PERF_RAW_DETAILdouble
step_nbrP6ETL_PERF_RAW_DETAILinteger
step_cntP6ETL_PERF_RAW_DETAILinteger
part_nbrP6ETL_PERF_RAW_DETAILinteger
part_cntP6ETL_PERF_RAW_DETAILinteger
action_nameP6ETL_PERF_RAW_DETAILstring
process_nameP6ETL_PERF_RAW_DETAILstring
step_nameP6ETL_PERF_RAW_DETAILstring
step_descP6ETL_PERF_RAW_DETAILstring
file_nameP6ETL_PERF_RAW_DETAILstring
stmt_name_1P6ETL_PERF_RAW_DETAILstring
stmt_name_2P6ETL_PERF_RAW_DETAILstring
stmt_name_3P6ETL_PERF_RAW_DETAILstring
stmt_name_4P6ETL_PERF_RAW_DETAILstring
start_timeP6ETL_PERF_RAW_DETAILtimestamp
end_timeP6ETL_PERF_RAW_DETAILtimestamp
rows_processedP6ETL_PERF_RAW_DETAILinteger
elapsedP6ETL_PERF_RAW_DETAILnumber
P6ETL_TEMP_MEMO_CONVTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
table_nameP6ETL_TEMP_MEMO_CONVstringtable_name
ref_skeyP6ETL_TEMP_MEMO_CONVintegerskey
ref_skey2P6ETL_TEMP_MEMO_CONVintegerskey2
html_memoP6ETL_TEMP_MEMO_CONVblobHTML Memo
html_memo2P6ETL_TEMP_MEMO_CONVclobHTML Memo
rawtextP6ETL_TEMP_MEMO_CONVclobRaw Memo
P6ETL_PRIVILEGENAMESTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
privilege_numberP6ETL_PRIVILEGENAMESint
privilege_nameP6ETL_PRIVILEGENAMESstring
P6ETL_PROJECTLISTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
objectidP6ETL_PROJECTLISTinteger
P6PROJECTETLLISTTop
PX Field NamePX View NamePMDB Table NamePMDB Field NameData TypeDescription
OBJECTIDP6PROJECTETLLISTinteger
PROJECTOBJECTIDP6PROJECTETLLISTinteger
LASTUPDATEDATEP6PROJECTETLLISTdate