Planning Backup and Recovery Stages
In addition to the backup and recovery procedures that are standard for your environment, take a set of DB2 backups at key stages during the upgrade, using your preferred utility. A snapshot of your repositories and environment at these stages protects the progress of your upgrade in the event of a failed subsequent process.
It is recommended that you back up your Siebel schema at these key stages of the upgrade:
Before any upgrade activity is started
Before performing unloads
Note: Unloads must be performed when there is no system activity, so that the database is at a point of consistency.After upgrading the Siebel database schema
After the repository merge
After upgrading the custom database schema
Review the results of all JCL jobs that you execute during the install or upgrade process. You can use a spool viewer such as IBM’s SDSF to inspect the output from these jobs. You can review this information in addition to reviewing the upgrade log files.