Defining Control Charts
To define control charts, use the Control Charts component (QS_CL_CHART). This topic discusses how to define control charts.
|
Page Name |
Definition Name |
Usage |
|---|---|---|
|
QS_CL_CHART0 |
Define the scope of the chart, such as chart prototype and testing zones. Use these charts for real-time or offline data analysis. |
|
|
QS_COPY0_PNL |
Creates a new chart by copying an existing chart. |
Use the Define Control Chart page (QS_CL_CHART0) to define the scope of the chart, such as chart prototype and testing zones.
Use these charts for real-time or offline data analysis.
Navigation:
Field or Control |
Description |
|---|---|
|
Click the Copy From button to create the new control chart by copying from an existing control chart. When you click this button, the Copy Configuration Item page appears. |
Chart Prototype |
Select a chart prototype. Values are: X & Moving Range, Xbar & Range, Xbar & Sigma, c Chart, np Chart, p Chart, and u Chart. The chart prototype that you select defines the standard formulas that are used to calculate subgroup values and control limits. |
Test Zones |
Enter the number of divisions between the upper control limit (UCL) and the mean (CL) limit lines that are used for control-test evaluations. Zones typically represent standard deviations. |
Data Type |
Select the type of data that is to be plotted on this chart. Values include: Variables: Measurable characteristics, such as length, mass, or time, and for characteristics that are derived from measurable characteristics, such as volume, density, or area. Defects: Characteristics that represent defect counts, which are counts of the number of defects observed per unit, such as scratches, blemished, or missing subcomponents. Defectives: Characteristics that represent counts of defective units and counts of how many units are defective using a pass or fail criteria. |
Use the Copy Configuration Item page (QS_COPY0_PNL) to creates a new chart by copying an existing chart.
Navigation:
Click the Copy From button on multiple pages in Quality.
Create a new control chart by selecting an existing chart from the Copy From field.