Duration % of Planned (%)
A Duration % of Planned threshold value is expressed as a percentage. An issue is generated if the ratio of the activity's actual duration to its planned duration (actual duration / planned duration * 100) falls beyond the threshold values.
The ratio of actual duration to planned duration may be greater than 100.