3.19.101 70286 - GTT Duplicate Action Processing Stopped
Recovery:
- Confirm that the affected vSTP MP is at congestion level CL2 or higher and that GTT Duplicate Action is provisioned.
- Determine the condition driving SCCP thread congestion. Review CPU utilization, SCCP usage, ingress traffic rate, SCCP Stack Event Queue peak/average/full, and concurrent congestion or routing alarms.
- Compare the affected MP with peer MPs to determine whether the issue is isolated to one MP or affects the site.
- Investigate and correct abnormal traffic distribution, traffic bursts, translation/routing failures, or SCCP/GTT loops through approved operational procedures.
- Verify that SCCP thread congestion drops below CL2. Confirm that 70286 clears and GTT Duplicate Action processing resumes.
- If CL2 congestion persists or recurs, retain the relevant KPI, alarm, and trace evidence and contact My Oracle Support.
- It is recommended to contact My Oracle Support for assistance if needed.