This image the virtual connection assignment before the groom process. The virtual connections 00/QTYP/006778/026/SBZ and 00/QTYP/006778/SBZ are currently riding on the terminating physical connection 00/QHYU/006778/027/SBZ, which will be replaced with a new parent connection 00/QHYU/006778/003/SBZ. After the groom process is completed, the virtual connections will ride on the new parent connection 00/QHYU/006778/003/SBZ. Essentially, the 00/QHYU/006778/027/SBZ terminating parent connection is replaced by the 00/QHYU/006778/003/SBZ parent connection in the virtual's design path.