Preparing the Installation Site
Before the arrival of Compute Cloud@Customer, prepare the installation site and ensure it meets the requirements outlined in this section.
To track progress as you prepare your site, use the Site Checklists for Compute Cloud@Customer.
Follow these steps prior to unpacking and situating your Compute Cloud@Customer:
-
Thoroughly clean and vacuum the area in preparation for the installation.
-
Note problems or peculiarities at the site that require special equipment.
-
Verify that the installation site flooring has a strength rating to withstand the combined weight of the Compute Cloud@Customer and any other installed equipment.
For more information, see Flooring Requirements.
-
Install all necessary electrical equipment and ensure that sufficient power is provided.
For more information, see Electrical Power Requirements.
-
Ensure that the installation site provides adequate air conditioning.
For more information, see Environmental Requirements (Ventilation and Cooling).
-
Operate the air conditioning system for 48 hours to bring the room temperature to the appropriate level.
Review Safety Guidelines
Review the following safety precautions to ensure that the site is safe and ready for delivery. Failure to observe these precautions can result in personal injury, equipment damage, or malfunction.
-
Do not block ventilation openings.
-
Do not install the system in a location that is exposed to direct sunlight or near a device that may become hot.
-
Do not install the system in a location that is exposed to excessive dust, corrosive gases, or air with high salt concentrations.
-
Do not install the system in a location that is exposed to frequent vibrations. Install the system on a flat, level surface.
-
Use a power outlet that uses proper grounding. When using shared grounding, the grounding resistance must not be greater than 10 ohms. Ensure that your facility administrator or a qualified electrical engineer verifies the grounding method for the building, and performs the grounding work.
-
Do not place cables under the equipment or stretch the cables too tightly.
-
Do not disconnect power cords from the equipment while its power is on.
-
Do not place anything on top of the system or perform any work directly above it.
-
Do not let the room temperature rise sharply, especially in winter. Sudden temperature changes can cause condensation to form inside the system. Allow for a sufficient warm-up period prior to server operation.
-
Do not install the system near a photocopy machine, air conditioner, welding machine, or any other equipment that generates loud, electronic noises.
-
Avoid static electricity at the installation location. Static electricity transferred to the system can cause malfunctions. Static electricity is often generated on carpets.
Site Requirements
Ensure the appliance installation site meets the requirements described in the following sections:
-
Product dimensions and weight
-
Area surrounding the rack
-
Receiving area and access route
-
Maintenance access
-
Power distribution units
-
Facility power
-
Circuit breakers and grounding
-
Temperature and humidity
-
Ventilation and cooling