Billing Limits

Billing Limit Percent

Enter the billing limit that is a percentage of the asset's replacement cost.

Once the billing limit for an asset has been reached, a new reduced rate may be charged and is specified in the next rate table and its associated percentage.

Subsequent Rate Table

Enter a value to identify the rate table that you want the system to use once the billing limit from the previous table has been reached.

Subsequent Percent Override

Enter the percentage factor used in conjunction with the next rate table specified after the billing limit has been reached.