Billing Limits
- Billing Limit Percent
Enter the billing limit that is a percentage of the asset's replacement cost.
Once the billing limit for an asset has been reached, a new reduced rate may be charged and is specified in the next rate table and its associated percentage.
- Subsequent Rate Table
Enter a value to identify the rate table that you want the system to use once the billing limit from the previous table has been reached.
- Subsequent Percent Override
Enter the percentage factor used in conjunction with the next rate table specified after the billing limit has been reached.