Defaults

1. Enter the Capacity Mode:

Specify a code indicating which planning is being used. Values are:

1: Resource Requirements Planning.

2: Rough Cut Capacity Planning.

3: Capacity Requirements Planning.

2. Enter the default Unit of Measure.

Enter a value from UDC 00/UM (Unit of Measure) that identifies the unit of measurement for an amount or quantity.

For example, it can represent a barrel, box, cubic meter, liter, hour, and so on.

3. Enter the default version of Work Center Revision (P3006)

Specify a version of the Work Center Revisions program (P3006).

Blank: ZJDE0001.