Defaults
- 1. Enter the Capacity Mode:
Specify a code indicating which planning is being used. Values are:
1: Resource Requirements Planning.
2: Rough Cut Capacity Planning.
3: Capacity Requirements Planning.
- 2. Enter the default Unit of Measure.
Enter a value from UDC 00/UM (Unit of Measure) that identifies the unit of measurement for an amount or quantity.
For example, it can represent a barrel, box, cubic meter, liter, hour, and so on.
- 3. Enter the default version of Work Center Revision (P3006)
Specify a version of the Work Center Revisions program (P3006).
Blank: ZJDE0001.