Defaults

1. Schedule Pattern

Specify the schedule pattern that the system uses to retrieve schedule period information from the Maintenance Schedule Period (F48302) table.

This information is used when creating PM projection information. This processing option works in conjunction with the Starting Period and Number of Periods to Project processing options.

Note: This processing option is intended for use with the Maintenance Scheduling product. Entering a value in this processing option results in the system overriding the values entered in the From Date and Through Date processing options. If you leave this processing option blank, the system uses the values entered in the From Date and Through Date processing options when creating the PM projection information.
2. Starting Period

Specify the starting period.

The system uses this period start date as the PM projection from date. The start date for the period specified overrides the From Date processing option. Values are:

1: Current period (default)

2: Next period

3: Following period

Note: This processing option works in conjunction with the Schedule Pattern and Number of Periods to Project processing options. Schedule periods must exist in the Maintenance Schedule Periods (F48302) table for the schedule pattern specified in the processing option
3. Number of Periods to Project

Specify how many periods, including the period specified in the Starting Period processing option, that the system considers in determining the ending period.

The system uses this period end date as the PM projection through date. The end date for the determined period overrides the Through Date processing option.

Blank: 1 Period.

Note: This processing option works in conjunction with the Schedule Pattern and Starting Period processing options. Schedule periods must exist in the Maintenance Schedule Periods (F48302) table for the schedule pattern specified in the processing option.
4. From Date

Specify the from date that the system uses to project PMs.

Blank: System date.

5. Through Date

Specify the through date that the system uses to project PMs.

Blank: System date.

6. Forecast Type

Enter a value from user-defined code (UDC) table 34/DF (Forecast Type) that specifies the forecast type to be used when creating PM projections.

7. Job Status Message Recipient

Specify the address book number of the recipient of job status messages that result from the Update PM Projections program (R13411).

Blank: The system uses address book number of the current user.