R3350 - Capacity Requirements and Messages Report

Use processing options to control this information on the report:

  • Time period.

  • Unit of measure for load information.

  • Type of planning.

  • Capacity requirements, capacity messages, or both.

  • User-defined code for row descriptions.

Although you can run three versions of the report, the JD Edwards EnterpriseOne Plant and Equipment Management system uses the Capacity Requirements Planning version.

The system draws information for this report from these tables:

  • Capacity Load Table (F3313).

  • Capacity Message File (F3311).

  • Work Center Master File (F30006).

When you set processing options for this report, consider that any unit of measure that you enter in the processing options must be the same unit of measure that is used in the Account Master table (F0901) for the work center.