Defining Crew Availability

Access the Work With Maintenance Schedule Metrics form.

Lead Craft

Enter an alphanumeric code to use to define the lead craft required to complete the work. The value entered is used as the default craft (work center) when new labor detail records are added to the work order.

Standard Hours

Enter the total hours that should be available to carry out work during the schedule period based on all the resources in the crew being fully available for scheduled work.

Available Hours

Enter the total hours available for scheduled work during the schedule period. The available hours is multiplied by the load percent to calculate the target hours to schedule.

Load % (load percentage)

Enter a numeric value that represents the percentage of the available hours that is to be considered for scheduling work. The load percentage should be set to provide a realistic target for the crew to achieve.

Target Hours

Enter the target hours available for scheduling work. The value is the product of the available hours multiplied by the load percent.

Calculated Hours

Enter the calculated hours for the crew or lead craft for the schedule period date range that is derived using the Resource Master (P48310) and Resource Working Hours (P48307) setup information. The resource master for an individual employee defines which crew or lead craft they belong to. The resource working hours defines their available hours.