Process

Select the Process tab. Use this processing option to determine the forecast type to define the PM Projection to be considered for display on the crew schedule review.

1. Forecast Type

Specify the forecast type to use to retrieve the preventive maintenance forecast records from the PM Projections table (F13411). Enter a value from UDC 34/DF (Forecast Type). If you leave this processing option blank, the system uses MF as the forecast type.

2. Supply/Demand Inclusion Rule

Specify the supply/demand inclusion rule that the system uses to calculate availability.

For assignments at the work order level, the system determines whether the assignment is included in availability calculations by using the rule in this processing option, the work order document type (DCTO), and the work order status (SRST).

For assignments at the labor detail level, the system determines whether the assignment is included in availability calculations by using the rule in this processing option, the work order document type, and the operation status (OPST). If the Operation Status field is blank, the system uses the work order status.

If you leave this processing option blank, the system calculates availability by using all assignments that have been identified for inclusion.

3. Update Planned Start Date

Specify whether the system should automatically update the planned start date based on the scheduled start date. If the scheduling is done at the work order level, then the planned start date of the work order is updated, and if the scheduling is done at the labor detail level, then the planned start date of the work order routing is updated.

Valid values are:

Blank: Do not update Planned Start Date.

1: Update Planned Start Date.