Understanding User-Defined Codes for Work Order Resource Assignments

This table lists the user-defined codes (UDCs) for the applications in the work order resource assignments module:

User-Defined Code

Description

42/WD: Resource Calendar Type

Specifies how the calendar is used. For example, the calendar might be specific to an industry such as banking, or it might be used within JD Edwards EnterpriseOne Resource Assignments.

48/TP: Assignment Type

Specifies the type of assignment in scheduling, notification, and assignment. For future use.

48/LP: Load Profile Method

Specifies the load profile method for resources. The load profile method indicates how the work of an assignment is distributed. Currently, only a flat load profile is supported.

48/PT: Period Type

Specifies the type of period the system uses for displaying the availability and assignments of the resources You can set a default value in the processing options for the Resource Assignment program (P48331).

48/CT: Calendar Type

Specifies the selected calendar type (for example, base calendar) when you define working hours in the Resource Working Hours program (P48307). Click the Search button for the Type field to access values.

48/RC: Override Reason

Specifies the reason for the working hours override. If integrating with the HR Leave Request process, ensure that valid UDC values from 07/LV Leave Type are included in the Override Reason Code UDC.

48/RD: Resource Details

Specifies whether the resources' assignments or availability appears on the Work with Resource Assignments form in the Resource Assignment program. You can set a default value in the processing options for the Resource Assignment program.

48/01-48/20: Resource Attributes 01–20

These user-defined codes define additional filter criteria for resources. For example, if the JD Edwards EnterpriseOne Human Resources or Payroll systems are not installed, you can use these codes to define criteria such as job type or competency.

48/SD: Scheduling Day of Week

Specifies the days for which working hours are defined. This system uses this code in the Resource Working Hours program.

48/WD: Work Day

Specifies which day of the week is the starting workday. You can set a default value in the processing options for the Resource Assignment program.

48/TK: Task Status

Specifies the status of a task in scheduling, notification, and assignment. For future use.

48/CK: Calendar Key

Classifies different resource calendars. For example, you might define normal shift, day shift, and night shift calendars.

48/RL: Resource Assignment Level

Specifies whether resource assignments are at the level of the work order or the work order labor detail, based on the work order document type. To make assignments at the labor detail level, you must use this UDC to specify the work order document type.