Setting up Work Center (P012503X) Using CafeOne Application
You have different options to set up the Work Center (P012503X) with CafeOne.
Access the application you are going to connect to the Work Center (P012503X) through CafeOne.
Click the Personalize Form icon and select Edit Form Layout under Personalization.
Select Create Link to EnterpriseOne Application.
Type P012503X in the Application field.
Select Dynamic Link to display Parameters Data Structure definitions and select the Parameters, Operations, and Parameter Values.
Set up input variables to convey the error messages you want to display.
The following table displays different input variables setups.
Application |
Report Name |
Version |
Exact Match |
Work Center Input 1 |
Length |
Justification |
Work Center Input 2 |
Length |
Justification |
Work Center Input 3 |
Length |
Justification |
---|---|---|---|---|---|---|---|---|---|---|---|---|
P03B11Z1 |
R03B11Z1A |
EDUS (User ID) |
10 |
L |
EDBT (Batch Number) |
15 |
L |
EDTN (Transaction Number) |
22 |
L |
||
P47010 |
R47011 |
Y |
EDOC (Document Number |
n/a |
n/a |
|||||||
P47040 |
R470412 |
Y |
EDOC (Document Number |
n/a |
n/a |
|||||||
P0411Z1 |
R04110ZA |
EDUS - (User ID) |
10 |
L |
EDBT (Batch Number) |
15 |
L |
EDTN (Transaction Number) |
22 |
L |
||
P0911Z1 |
R09110Z |
EDUS (User ID) |
10 |
L |
EDBT (Batch Number) |
15 |
L |
EDTN (Transaction Number) |
22 |
L |