Dates
Use these processing options to specify the dates that are used to process the report.
- 1. Date Range
Specify the date range for selecting records for processing. Both from and through dates must be entered.
- 2. Date Range Type
Specify the date field that the system uses in the data selection. Values are:
Blank: Check Dates (Default).
1: Work Dates.