Date
These processing options apply only to the Rent Wittholding report (R76C0001).
- Date From
Enter the date from which you generate the certificate.
- Date Thru
Enter the date through which you need to generate the certificate.
- Date Selection '1':G/L Date '2' or Blank: Service Date
Enter the date based on which you want to generate the certificate. Values are:
1: Print the certificate based on the G/L date range specified in the Date From and Date Thru processing options.
2: Print the certificate based on the service date range specified in the Date From and Date Thru processing options.