Actual Bill of Material

1. Work Order Selection Date

Enter the date to use for the work order. Values are:

1: Required date.

2: End date.

This date is used to obtain the WO that is taken into account in the actual cost calculation process. To add the WO to the actual bill of materials calculation, the system compares the date entered by the user with the period selected to run the actual cost process.

2. WO Status

The status that WO must have in order to be taken into account in the actual cost process. If you leave this field blank, the system does not use the WO status.

Bill of Materials Type

The system creates an actual bill of materials in the F3002 table using the value in this field.