Setting Up the Account and Cost Type Relationship
Access the Account ID / Cost Type Relationship form.
- Ledger Type
Enter a value that exists in the Ledger Type (09/LT) UDC table to specify the ledger type to which you associate a cost type.
- Account ID
Specify the general ledger account.
- Subledger
Specify the subledger for the account.
- Subledger Type
Enter a value that exists in the Subledger Type (00/ST) UDC table to identify the subledger type.
- Cost Type
Enter a value that exists in the Cost Component Add-Ons (30/CA) UDC table to specify the cost type to which you associate a ledger type.