Process
- 1. Accounting System
Specify the accounting system to be used for reporting the SAFT-PT. Certain sections of the SAFT -PT report are generated based on this processing option. Values are:
C: Accounting
E: Billing, Shipping and Working Documents Issued By Others
F: Invoicing
I: Integrated Invoices and Accounts
S: Self Billing
P: Partial Data
- 2. Integrated Accounting Invoice
Enter 1 if you want the accounting system to produce invoicing and accounting integrated data. This processing option is applicable only when the value of the Accounting System processing option is P (Partial Data).
- 3. Period Start Date
Specify the start date of the period for which you need to generate the SAFT-PT report.
- 4. Period End Date
Specify the end date of the period for which you need to generate the SAFT-PT report.
- 5. Taxonomy Reference
Specify the taxonomy reference required for generating the SAFT-PT report. Only those accounts entered in the Referential Chart of Accounts program (P74L920) based on the taxonomy reference selected will be exported in the general ledger section of the XML file.
- 6. WO Status From
Specify the start range of service work order status that the system uses to select service work orders to generate the SAFT-PT report. The value that you specify must exist in the Work Order Status UDC table (00/SS). The values in the 00/SS UDC table describe the status of a work order, rate schedule, or engineering change order.
- 7. WO Status To
Specify the end range of service work order status that the system uses to select service work orders to generate the SAFT-PT report. The value that you specify must exist in the Work Order Status UDC table (00/SS). The values in the 00/SS UDC table describe the status of a work order, rate schedule, or engineering change order.
- 8. Part List Material Status
Specify the material status from the Material Status UDC table (31/MS) for which the system generates the SAFT-PT report.