Lot Override Percentages

Select the Lot Override Percentages tab.

Avg. Cost Pct 1–10 (average cost percent 1–10)

Specify the average cost percentage for a community and phase. The system uses this amount to calculate the value in the corresponding Average Other Cost 1 field in the detail area of the form.

For example: (Average Cost Percent 1 x Total Revenue) = Average Other Cost 1.