Prerequisites

Before you enter an original budget, you must:

  • Verify the setting of the Job Cost Projections processing option in the Job Cost Constants program (P0026). The option must be selected to update projection ledger types (HA, HU) with budget information.

  • Verify that user-defined code (UDC) table 51/PF is set up with the job type that you want to assign.