Process
- 1. General Ledger Date Editing
Specify whether to validate the general ledger date that you enter against the current period entered for the company and the general ledger constants. Values are:
Blank: Validate.
1: Do not validate.
- 2. Method of Computation Changes
Specify changes to the method of computation processing option. Values are:
Blank: Enable changes.
1: Do not enable changes.
- 3. Job Cost Audit Trail
Specify whether the system generates Account Ledger records (F0911) as an audit trail for the progress entry revisions that you enter. Values are:
Blank: Generate one F0911 record for each period for progress entry revision. If you enter more than one revision in a period, the system maintains a cumulative balance by updating the same journal entry detail line.
1: Generate one F0911 record for each progress entry revision that you enter, regardless of whether multiple changes occur in the same period.
2: Do not generate F0911 records for progress entry revisions.
- 4. Reference Number
Specify the reference number to assign to the journal entries that the system generates for the audit trail. Entering a reference number enables you to group journal entries that are generated for processing option progress changes.
- 5. Audit Trail Description
Specify the description to assign to audit trail records that the system generates. If you leave this processing option blank, the system assigns Field Progress Entry.