R51540 Budget Revision Detail

Use the Budget Revision Detail report (R51540) to review all additions and changes made to the budget of a job. The report includes these details:

  • Cost Code

  • Cost Type

  • Description

  • Original Budget Estimate

  • Budget Changes This Period

  • Accumulated Changes to Estimate

  • Revised Budget Estimate