UDCs for Project Status Inquiry
The JD Edwards EnterpriseOne Job Cost system provides hard-coded values for the user-defined code (UDC) tables that project status inquiry uses. Verify that these UDC tables and values exist in your system:
51/BA (Billing Amount)
51/BF (Budget Flag)
51/PS (PSI Sequence)
51/CC (Category Codes)
51/CN (Column Type)
51/FF (Formula Factor)
51/OP (Alert Operator)
51/SM (Summarize)
51/TM (Totaling Method)