UDCs for Project Status Inquiry
The JD Edwards EnterpriseOne Job Cost system provides hard-coded values for the user-defined code (UDC) tables that project status inquiry uses. Verify that these UDC tables and values exist in your system:
- 51/BA (Billing Amount) 
- 51/BF (Budget Flag) 
- 51/PS (PSI Sequence) 
- 51/CC (Category Codes) 
- 51/CN (Column Type) 
- 51/FF (Formula Factor) 
- 51/OP (Alert Operator) 
- 51/SM (Summarize) 
- 51/TM (Totaling Method)