Example Setup
In this example, one retainage rule is set at the contract level. The calculation is based on two different percent completions on the contract. The control flag is set to blank to create retainage in A/R with no deferred taxes. The T and M line has no schedule of values.
This table shows how retainage rule E (Multi RETN Percentages on Completion) is set up in the Retainage Rules Table program (P5204):
Percent Retainage |
Percent Complete |
---|---|
10 percent |
20.00 |
15 percent |
38.00 |
This contract is set up in the Contract Master Revisions program (P5201):
Contract Part |
Retainage Rule |
Offset |
Control Flag |
Tax Explanation |
Tax Rate/Area |
---|---|---|---|---|---|
Contract |
E |
RETN |
S |
D1 = 3.5 percent |