Retainage Calculations

This equation shows how the system calculated retainage amounts for change order 000, billing line 001:

Billing Line

(Net Amount) × (Retainage Table B) = (Retainage Amount)

001

3,000.00 × 0.15 = 450.00

These equations illustrate how the system calculated retainage amounts for change order 000, billing lines 002 through 004 and 007:

Billing Line

(Net Amount) × (Retainage Table A) = (Retainage Amount)

002

78.00 × 0.10 = 7.80

003

275.00 × 0.10 = 27.50

004

455.00 × 0.10 = 45.50

007

750.00 × 0.10 = 75.00

This equation shows how the system calculated retainage amounts for change order 001:

Billing Line

(Net Amount) × (Retainage Table C) = (Retainage Amount)

001

100.00 × 0.05 = 5.00