Completed PMs

Use this report to analyze information related to completed PMs. Completed PMs are those with a date in the Completed Date field and a Status of "99." Information includes Days Between Service (this is the number of days from Completed Date minus Last Completed Date), Average Percentage Due by Service Type, Average Percentage Due by Assigned To (the technician), Average Percentage Due by Site, and Average Percentage Due by Equipment Number.

This report contains the following components:

  • Average Percentage Due of Completed PMs by Service Type (horizontal bar graph)

  • Average Percentage Due of Completed PMs by Service Type (table)

  • Completed PMs by Equipment for Each Service Type (table)

  • Average Percentage Due of Completed PMs by Assigned To (horizontal bar graph)

  • Average Percentage Dues by Assigned To (table)

  • Completed PMs by Assigned To for Each Service Type (by Assigned To, Service Type) (table)

  • Average Percentage Due of Completed PMs by Site (horizontal bar graph)

  • Average Percentage Due by Site (table)

  • Completed PMs by Assigned To for Each Site (by Site, Service Type) (table)

  • Completed PMs by Service Type for Each Equipment (table)

This report contains drill back functionality as described in the following table:

Functionality

Value

Table column containing drill back link

Service Type

Table columns passed to application

Equipment No, Service Type

Application called

Preventive Maintenance Backlog (P12071)

Form called

W12071A

Version called

ZJDE0001