Completed PMs
Use this report to analyze information related to completed PMs. Completed PMs are those with a date in the Completed Date field and a Status of "99." Information includes Days Between Service (this is the number of days from Completed Date minus Last Completed Date), Average Percentage Due by Service Type, Average Percentage Due by Assigned To (the technician), Average Percentage Due by Site, and Average Percentage Due by Equipment Number.
This report contains the following components:
Average Percentage Due of Completed PMs by Service Type (horizontal bar graph)
Average Percentage Due of Completed PMs by Service Type (table)
Completed PMs by Equipment for Each Service Type (table)
Average Percentage Due of Completed PMs by Assigned To (horizontal bar graph)
Average Percentage Dues by Assigned To (table)
Completed PMs by Assigned To for Each Service Type (by Assigned To, Service Type) (table)
Average Percentage Due of Completed PMs by Site (horizontal bar graph)
Average Percentage Due by Site (table)
Completed PMs by Assigned To for Each Site (by Site, Service Type) (table)
Completed PMs by Service Type for Each Equipment (table)
This report contains drill back functionality as described in the following table:
Functionality |
Value |
---|---|
Table column containing drill back link |
Service Type |
Table columns passed to application |
Equipment No, Service Type |
Application called |
Preventive Maintenance Backlog (P12071) |
Form called |
W12071A |
Version called |
ZJDE0001 |