Estimated vs. Actual Cost - Detailed
Use this report to analyze the costs associated with work orders: material, labor, other, and total costs. This report enables you to analyze costs and their variances (estimated less actual). The detailed version highlights individual work order costs.
This report contains the following components:
Total Cost Variance by Contract (horizontal bar graph)
Total Cost Variance by Contract (table)
Total Cost Variance by Site (horizontal bar graph)
Total Cost Variance by Site (table)
Total Cost Variance by Customer (horizontal bar graph)
Total Cost Variance by Customer (table)
10 Most Expensive Work Orders (Cost) (horizontal bar graph)
Estimate vs. Actual Cost - Totals (table)
Estimate vs. Actual Cost - Details (table)
The Estimate vs. Actual Cost - Details table component contains drill back functionality as described in the following table:
Functionality |
Value |
---|---|
Table column containing drill back link |
Work Order Number |
Table columns passed to application |
WO Number |
Application called |
Work Order Revisions (P17714) |
Form called |
W17714A |
Version called |
ZJDE0003 |