Load - By Failure

Use this report to analyze the rate at which work orders are created (incoming rate based on Order Date), are scheduled (planned rate based on Planned Start Date), and are completed (completed rate based on Actual Finish Date). This information is analyzed by work order type, equipment number, and failure.

You can determine over what period work order rates are analyzed. The analysis is always over the past 13 periods where the 13th period is the current period. You select whether to analyze by weeks, months, or years.

This report contains the following components:

  • Incoming Work Order Load (by Work Order Type, Equipment Number, Failure) (table)

  • Incoming Load per Period by Failure (line graph)

  • Planned Work Order Load (by Work Order Type, Equipment Number, Failure) (table)

  • Planned Load per Period by Failure (line graph)

  • Completed Work Order Load (by Work Order Type, Equipment Number, Failure) (table)

  • Completed Load per Period by Failure (line graph)

  • Average Load per Period by Failure (horizontal bar graph)

  • Average Load by Period by Equipment (horizontal bar graph)

  • Average Load per Period by Work Order Type (horizontal bar graph)

  • Average Load per Period for All Work Orders (horizontal bar graph)

  • Reference tables for Equipment and Work Order Type descriptions