Work in Progress
The Work In Progress report is by company and by job. It contains these report components:
Expense Comparison (pie chart)
WIP by Company and Job Pivot Table
WIP Detail Table
The WIP Detail table component contains drill back functionality as described in the following table:
Functionality |
Value |
---|---|
Table column containing drill back link |
Job Number |
Table columns passed to application |
Job Number |
Application called |
Job Status Inquiry (P512000) |
Form called |
W512000A |
Version called |
ZJDE0001 |