Prerequisites
Before you enter configured item segments, you must:
Verify that the stocking type for a configured item is C (configured).
Set the Kit/Configurator Pricing Method on Item Master Revisions.
Verify that the manufactured configured components have bills of material.
Create routings for the configured item and for the components that are manufactured.