Defaults

1. Default Vessel Class for Search

Enter the vessel class to use as the default search criteria. Valid values are:

1: Tank

2: VBT (virtual barrel tank)

3: Unknown Tank.

2. Named Calculation Path

Specify the default value for the named calculation path. You cannot change the default value on the Manage Additive form.

If you do not specify a value, the system uses the default value that is associated with your user ID.

3. Configured Operation Code for Additive Operations

Specify the configured operation code to use to create the in-place additive operation. When you click the Create Operation button in the Vessel/Additive Quantity subform, the system displays the Operation / WO Template Selection form, and completes the Configured Operation Code field with the value that you enter in this processing option. If you leave this processing option blank, you must complete the Configured Operation Code field on the Operation / WO Template Selection form.

The configured operation code that you enter in this processing option must correspond to the vessel class for the additive operation that you create. For example, if you work with tanks, then the base operation code on which the configured operation code is based must be ADDT. Likewise, if you work with VBTs, the base operation code on which the configured operation code is based must be ADDB.

The Additive Workbench program does not perform a validation for the relationship between the vessel class and the base operation code when you complete the processing options. Instead, the program issues an error message when you attempt to create and save the operation. If the base operation code for the configured operation code that you enter in the processing option does not correspond to the vessel type for which you create the additive operation, then the system displays an error message in the Operation / WO Template Selection form when you click the Save and Close button on that form. If you receive an error message, you must change the value in the Configured Operation Code field to a code that corresponds to the appropriate base operation code.

4. Configured Operation Code for Quality Operations

Specify the configured operation code to use to create the in-place quality operation. The base operation code of the configured operation code must be QA. If the base operation code is other than QA, the system displays an error message in the Operation/WO Template Selection form when you click the Save and Close button.

If you do not complete this processing option, the system does not provide a default value for the quality operation in the Operation/WO Template Selection form. If you complete the Test/Panel and Test Specifications fields on the Add Additive subform, you must enter a configured operation code for the QA operation on the Operation/WO Template Selection form before you can create the quality operation when you click the Save and Close button.

5. Elapsed Time Between Operations (in Minutes)

Enter the number of minutes for the elapsed time between the operations that you create from the Additive Workbench program. For example, if you enter 2.00, the system creates the operations to begin at two minute intervals.

6. Search Operation Status

Enter a value from the Operation Status (31B/PO) UDC table to specify the status of the operations for which to search. You can change the value on the Manage Additives form. If you do not complete this processing option, you must specify a value on the Manage Additives form.

Valid values are:

1: Closed

2: Closed or actual

3: Closed, actual, or active.

7. Default Workflow Status

Enter a value from the Operation Workflow Status Mapping table (F31B74) to specify the workflow status of the operations that you want to locate. If you complete this processing option with a valid value, the Manage Additives form displays only the operations with the workflow status that you specify when you click the Find button. If you do not complete this processing option, the Manage Additives form displays all operations when you click the Find button.

If you do not complete this processing option, you can use the QBE (query by example) line in the Manage Additives form to restrict the operation records that the form displays.

8. Default Additive Method

Enter a value from the Additive Method (31B/AD) UDC table to specify the default additive method for the additive operations that you want to add or modify. The fields in the Add Additive section of the Manage Additives form change depending on the method that you select. If you do not specify a value in this processing option, you must specify a value on the Manage Additives form.

Values are:

C: Vessel volume

F: Fixed

L: Flow

P: Targeted parts per million

R: Rate

9. Material Type UOM

Enter a value from the Material Type Unit of Measure (31B/MU) UDC table to specify the default value for the Material Type UOM field. If you do not complete this processing option, the system uses the default value of V (volume). You can change the value on the Manage Additives form.

Values are:

A: Area

V: Volume

W: Weight

10. Default Work Order Type

Enter a value from the Work Order Type (31B/TW) UDC table to specify the work order type to create when you create new operations.