Examples - Setting Up Line Configurations
The following table shows examples of line configurations of the Wine Premises Operations report:
Part |
Section |
Line |
Column Letter |
Line Description |
Material Type |
Configured Operation |
Which Lot |
---|---|---|---|---|---|---|---|
1 |
A |
2 |
a |
Produced By Fermentation |
W (Wine under 14%) |
T2B |
TA |
1 |
A |
5 |
a |
Produced By Blending |
W (Wine under 14%) |
T2T |
TA |
1 |
A |
16 |
a |
Removed for Distilling Material |
DM (Distilling Material) |
SHIP (Ship Bulk Volume Operation) |
FB-FA |
7 |
1 |
a |
In Fermenters (Estimated Quantity of Liquid) |
FJ (Fermenting Juice) |
*ALL |
*ALL |
|
3 |
2 |
a |
Received |
S (Grape Spirits) |
RECV (BOL Receive Bulk Volume) |
FA |