Move Details

You can also enter move details such as measures, volumes, or blend IDs. However, you cannot change or add tanks. To change tank assignments, you must enter the changes on the Create/Edit Operations form, and the system displays the changes to the tanks on the Speed Actuals Update form.

You use the Calculate Move button to calculate the From survey, To survey, and operation gain loss for each detail line, as well as calculate the totals on the Move Details tab. The system converts measures in feet and inches to decimal values. This conversion applies to the facilities that use inches; facilities that use metric measures need no conversion. For example, if the entry is 1 1 ¾, which is the entry for 1 foot 1 and ¾ inches, the amount the system stores is 13.5. The system displays 1 1 ¾.

Additionally, you can access the VBT Detail form to update the barrels that you use in the barrel move operation.