One VBT to Many Tanks

For example, suppose you need to create records for one work order that includes a move from one VBT (VBT1) to two tanks (T1 and T2), and VBT has six barrels. For this example, you would access the record for VBT1 and enter six detail lines for each of the six barrels for the VBT to T1 movement line. Each of the six details lines should include a value of 1 in the V2V Move Seq Num field. Enter E for the Barrel Volume Status field for the first two detail lines. Next, for the VBT1 to T2 move, access the record for second movement line, and add four lines for VBT1 and V2V Move Seq Num 2. The second movement sequence will have only four detail lines because two barrels were emptied in previous movement line.