Resources

Select the Resources tab.

Staff Number

Enter staff that you want to associate with the operation that you selected in the operation grid. If you enter a staff number, you cannot use the work group code.

Work Group Code

Use this field to associate staff with the operation if you do not want to assign individual staff members. If you enter a work group code, you cannot use the Staff Number field.

Actual Time

Enter the time that is required to perform the operation. The system retrieves the default time unit of measure.