Resources
Select the Resources tab.
- Staff Number
Enter staff that you want to associate with the operation that you selected in the operation grid. If you enter a staff number, you cannot use the work group code.
- Work Group Code
Use this field to associate staff with the operation if you do not want to assign individual staff members. If you enter a work group code, you cannot use the Staff Number field.
- Actual Time
Enter the time that is required to perform the operation. The system retrieves the default time unit of measure.