Defining Kanban Demand
Access the Edit Kanban Demand form.

- Explosion Date
Displays the date that the bill of material explosion was performed by the system.
- Flow Capacity Percentage
Enter the percentage at which the production line runs. For example, based on forecasted demand, a production plant might redesign its assembly line to run at 85 percent.
- Effective Date
Specify the date used to determine the valid bill of material that will be used in the Exploded Material Definition (EMD).
- Calculate Demand
Click to calculate the demand for a specific kanban.
- Dependent Demand
Display the demand calculated by the system based on pull chain and component demand information.
- Independent Demand
Enter demand not accounted for by the system-dependant demand. Independent demand includes seasonal and field replaceable unit (FRU) demand.
- Total Demand
Display the total of dependent and independent demand for an item.
- Override Total Demand Quantity
Enter a quantity that will override the total demand calculated by the system.
- Override Flag
Set the flag to specify whether the system uses the override total demand quantity.
- Clear All Overrides
Click to clear any user-defined overrides.
- Save, Explode BOM and Close
Click to save the information entered on the form, explode the bill of material, and close out of the program.
Note: This button is disabled if the Flow Capacity Percentage field is changed. The Save, Explode BOM and Close button is enabled when you click the Calculate Demand button.