Basic

Select the Basic tab.

Description

Enter the name or description of the project or project task.

Item Number

Enter the item number of an item that is associated with a project task. Use this field if the task consists of a manufacturing work order.

QTY Ordered (quantity ordered)

Enter the quantity of the item. Use this field if the task consists of a manufacturing work order.

UoM (unit of measure)

Enter a value from user-defined code 00/UM that indicates the quantity in which to express an inventory item. For example, CS (case) or BX (box). Use this field if the task consists of a manufacturing work order.

Task Status

Enter a code from user-defined code 00/SS that describes the status of a work order, rate schedule, or engineering change order. Any status change from 90 through 99 triggers the system to automatically update the completion date.

Shippable

Specify whether the system generates a sales order line for a project task. Project Requirements Planning uses this value to explode project-specific requirements. The project task must be a top-level manufacturing work order. The system cannot generate sales order lines from subassembly, service, or summary work orders. Values are:

Blank: Do not generate a sales order line.

1: Generate a sales order line.

Alert

Enter a code that specifies whether the system sends alerts. Alerts are messages that inform you that an exception to a business process has occurred. Alerts are directed to individuals who are designated in the address book as project managers. You can specify the severity level of an alert to meet the needs of the organization. Applications that use alerts include:

  • Warranty Claim/Supplier Recovery Processing (P174801Z)

  • EPM Project Workbench (P31P001)

  • Add/Revise Project (P31P011)

  • Outbound Work Order Revisions (P4801Z1)

  • Warranty Claim/Supplier Recovery Processing (P4801Z2)

Values are:

0: Do not send alerts.

1: Send alerts.

Branch/Plant, Assigned To, Supervisor, and Manager

Display values that are provided by the project header if you have entered the information there.