General
- WO Template Winery
Enter the facility that the work order template was created for.
- WO Template Number
Enter the number of the work order template to associate with the selected vessel or vessels.
- Operation/WO Description
Enter a description for the operation.
- Configured Operation
Enter the configured operation code to create an operation for the selected vessels. If you enter a configured operation code to create an operation, the system does not enable you to enter work order template information.
- Work Order Type
Enter a UDC (31B/TW) that identifies the type of work order that is being created. You can use this code to identify a group of operations that are performed. For example:
PPP: Plant, pick, prune
PIS: Plant, irrigate, spray
- Status
Initially displays a status of Draft when you add an operation.
- Instructed Start Date
Enter the anticipated start date for the operation.
- Instructed End Date
Enter the anticipated end date for the operation.