Resources

Select the Resources tab.

Work Group Code

Specify the work group code for the operation. Values are set up in the Work Groups program (P31B11).

Staff Number

Specify a staff number for the operation. The system enables you to enter either a staff number or a work group code. Values are set up in the Staff Information program (P31B02).

Actual Time

Enter the actual time that a work group or staff member spent on an operation.

Time UOM (time unit of measure)

Select the code for the time duration.