Setting Up Detail Costing in Distribution

Access the Branch/Plant Constants form.

Use Product Cost Detail (Y/N)

Enter a code that indicates whether Distribution programs use the total cost method or the detailed product cost method. Values are:

Y: Detail costing

N: Total costing