Setting Up Detail Costing in Distribution
Access the Branch/Plant Constants form.
- Use Product Cost Detail (Y/N)
Enter a code that indicates whether Distribution programs use the total cost method or the detailed product cost method. Values are:
Y: Detail costing
N: Total costing