ECO
These processing options specify which order types are assigned to engineering change orders during conversion.
- Order Type values 01 through 05 for Engineering Change Orders
Specify the order types for engineering change orders (ECOs).
These processing options specify which order types are assigned to engineering change orders during conversion.
Specify the order types for engineering change orders (ECOs).