Process

These processing options control whether the program copies simulated or frozen costs, which branch/plant to copy the information from, and which branch/plant to update.

COPY FROM INFORMATION

Specify the copy from information for costs, branch/plant, and cost method.

1. Simulated or Frozen

Specify whether to copy simulated or frozen costs.

1: Copy simulated costs.

2: Copy frozen costs.

2. Enter the Branch/Plant and Cost Method to copy

Specify the branch/plant and cost method to copy.

Branch/Plant to copy

Specify the branch/plant to copy.

Cost Method to copy

Enter a user-defined code (UDC) (40/CM) that specifies the basis for calculating item costs. Cost methods 01 through 19 are reserved by the JD Edwards EnterpriseOne system from Oracle.

COPY TO INFORMATION

Specify the copy to information for branch/plant and cost method.

3. Enter the Branch/Plant and Cost Method to update

Specify the branch/plant and cost method to update.

Branch/Plant to update (Release 9.2 Update)

Specify the branch/plant to update. Values are:

Blank: Use the Branch/Plant Selection for Copy Cost Values program (P30890).

*: Update all branch/plants with the costs.

Note: If the value in the processing option Branch/Plant to update is set to blank in the R30890, then the program will check the F30890 table, to identify if there are any records for the branch plant being copied. If records are found, the system updates the cost values for only those branch/plants that are listed under the Branch/Plant to copy field in the F30890 table.
Cost Method to update

Enter a UDC (40/CM) that indicates the cost method that the system will copy costs into. Cost methods 01–19 are reserved by the JD Edwards EnterpriseOne system.