Routing Cost Components
Routing cost components (cost components B and C) can be controlled manually or through the Simulate Rollup program (R30812).
This section discusses:
B1 (direct labor).
B2 (setup labor).
B3 (machine run).
B4 (labor efficiency).
C1, C2 (variable and fixed machine overhead).
C3, C4 (variable and fixed labor overhead).