Routing Cost Components

Routing cost components (cost components B and C) can be controlled manually or through the Simulate Rollup program (R30812).

This section discusses:

  • B1 (direct labor).

  • B2 (setup labor).

  • B3 (machine run).

  • B4 (labor efficiency).

  • C1, C2 (variable and fixed machine overhead).

  • C3, C4 (variable and fixed labor overhead).