Defaults
This processing option specifies the default used by the program.
- 1. Planning Code
Specify a planning code, or leave this field blank to include all planning codes. Codes are:
Blank: Include all planning codes.
0: Not planned by master production schedule (MPS), MRP, or distribution requirements planning (DRP).
1: Planned by MPS or DRP.
2: Planned by MRP.
3: Planned by MRP with additional independent forecast.
4: Planned by MPS, parent in planning bill.
5: Planned by MPS, component in planning bill.
These codes are hard-coded.