WO Processing (work order processing)
- 1. Include Work Order Generated Loads
Specify whether the system includes work order loads before rate schedules, after rate schedules, or not at all. Values are:
Blank: The system does not recognize work order loads.
1: The system includes work order loads before rate schedules.
2: The system includes work order loads after rate schedules.
- 2. From Operation Status
Specify the status that the system uses for the work orders or rate schedules as the routing steps are completed. Operation status is a UDC (31/OS) that describes the status of a work order or rate schedule. Enter the operation status to use as the default value, or select it from the Select User Define Code form.
- 3. To Operation Status
Specify the operation status that the system uses for the work orders or rate schedules as the routing steps are completed. Operation status is a UDC (31/OS) that describes the status of a work order or rate schedule. Enter the operation status to use as the default value or select it from the Select User Define Code form.