Default

These processing options control how the system prepares items for lean completions

Lean BOM Regeneration Flag (lean bill of material regeneration flag)

Specify the type of Lean BOM leveling that the system performs. The system enables you to refresh the lean BOM and routing records, create new records, or delete all records related to the end item. Values are:

Blank: Preserve all existing records for the end item. This is the default value.

1: Refresh all records. The system refreshes records in these tables:

  • Lean Multi Level Bill of Material Header (F300210).

  • Lean Multi Level Bill of Material Detail (F300211).

  • Lean Multi Level Routing Detail (F300311).

Production Schedule - Effective From

Specify the start date that the system uses when processing the daily plan.

Production Schedule - Effective Thru

Specify the end date that the system uses when processing the daily plan.