Default

These processing options control default values for the Item Completions program.

Line/Cell

Specify the line or cell where the item is completed.

The line or cell must be a work center type 2.

Shift

Specify the default shift code that the system uses when completing items. Enter a value from Shift Code (UDC 00/SH) that identifies all working shifts.

Refresh Production Records

Specify whether the system uses the records created by preprocessing or performs preprocessing during item completions. Values are:

Blank: Use existing records if BOM and routing leveling records are available.

1: Create new BOM and routing leveling records.

The BOM and routing leveling records reside in the Lean Multi Level Bill of Material Header table (F300210), Lean Multi Level Bill of Material Detail table (F300211), and Lean Multi Level Routing Detail File table (F300311).

Completion Report (RF31011B)